Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 15, 2010 FBO #3217
SPECIAL NOTICE

M -- RECOVERY--M--PROJECT NUMBER 2190, Buford Dam and Lake Sidney Lanier, GA

Notice Date
9/13/2010
 
Notice Type
Special Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-10-290
 
Archive Date
12/12/2010
 
Point of Contact
Paula Daily, (251) 441-6162
 
E-Mail Address
USACE District, Mobile
(paula.r.daily@sam.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Anderson Construction Company, DACW01-02-C-0006 P00080 RECOVERY THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. The Mobile District Corps of Engineers intends to issue a modification to contract number DACW01-02-C-0006, a competitively awarded Cost-Reimbursable Plus Award-Fee contract for the Operation and Maintenance of Government-Owned Facilities and Equipment, Lake Lanier Project, Buford Georgia, awarded to Anderson Construction Company, 58 Crozier Lane, Fort Gaines, Georgia. The modification will be funded by American Recovery and Reinvestment Act (Recovery Act) funds. The modification is for road resurfacing quality assurance. Road resurfacing is within the scope of the original contract technical provisions and includes Quality Assurance Inspections to ensure work is performed according to specifications. This work is within the scope of the original contract. Clauses required for projects involving Recovery Act funds will be incorporated into the existing contract. The existing contract must be used for the following reasons: 1) A detailed scope of work can not be prepared. The extent of the work and the resources needed, can not be fully determined prior to starting the work, because conditions are different at each area. 2) The contractor is responsible for the complete inspection, maintenance, and repair of all project buildings, roadways, and structures in 36 recreation areas, five operations areas, and the Project Management Office. 3) The scheduling, coordination, quality assurance and/or subcontracting for the work to be performed are within the scope of the original contract technical provisions and must be accomplished under the terms of the existing contract. The incumbent contractor not only has the management, technical, and administrative skills to efficiently and effectively accomplish this work at a reasonable cost, but also the advantage of the flexibility to readily adjust to any unforeseen obstacles encountered during installation. 4) This contract enables repairs to begin immediately after and during inspections without a detailed scope of work and thus minimizes the time the facilities are closed and the impact on public access. The American Recovery and Reinvestment Act (ARRA), contains specific acquisition requirements that must be met when using funds appropriated by the Act. Acquisitions must comply with FAR, and to the maximum extent practicable, be awarded under competitive procedures as fixed-price (FP) contracts. The Mobile District intends to use the current CPAF contract to meet it requirements. Though not a FP contract, it was awarded competitively, as a small business set aside. The contract type was selected to provide the contractor with the greatest incentive for efficient and economical performance, given the types of services to be performed. Furthermore, the existing Operation and Maintenance contractor has experienced personnel that are already on site and ready to perform the work. Accordingly, it is deemed to be in the best interest of the government and in compliance with the goals of the Recovery Act to use the existing Operation and Maintenance contract to accomplish the requirements listed above.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-10-290/listing.html)
 
Record
SN02278663-W 20100915/100913234751-b55584448efce229c2ea866c4d1b0e42 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.