Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 16, 2010 FBO #3218
SOURCES SOUGHT

17 -- GH Block 40 configuration GICS to include one Mission Control Element and one Launch Recovery Element

Notice Date
9/14/2010
 
Notice Type
Sources Sought
 
NAICS
334419 — Other Electronic Component Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, 88 CONS/PK, 1940 ALLBROOK DRIVE, WRIGHT-PATTERSON AFB, Ohio, 45433-5309, United States
 
ZIP Code
45433-5309
 
Solicitation Number
FA8620-11-T-3002
 
Archive Date
10/9/2010
 
Point of Contact
Daniel J Huiet, Phone: 9372554835
 
E-Mail Address
daniel.huiet@wpafb.af.mil
(daniel.huiet@wpafb.af.mil)
 
Small Business Set-Aside
N/A
 
Description
This is a request for information only. This is not a request for quote. Sources Sought Global Hawk (GH) Ground Interface Communication System (GICS) Test Assets Statement of Work (SOW) 14 September 2010 This sources sought is to seek information and resource capabilities of contractors. This is not a request for quote. 1.0 Test Assets The contractor shall provide three (3) ea. GH Block 40 configuration GICS sets less the Tactical Interoperable Ground Data Link (TIGDL) and Tier 2 Tactical Field Terminal (TTFT). The contractor shall provide one (1) TTFT • One GICS set equals o One (1) ea. Mission Control Element (MCE) GICS o One (1) ea. Launch and Recovery Element (LRE) GICS GICS equipment shall be identical to current GH Block 40 MCE 60058756+000 and Block 40 LRE is 60035451+000. The contractor would price, procure and deliver the test assets identified above. The required parts are a Firm Fixed Price effort with delivery not later than 18 months after receipt of order. Where the part number or any associated part characteristic has "rolled" to a newer/updated number, the contractor shall incorporate the most current data with the understanding that said changes do not change the items Form, Fit or Function. The contractor shall meet all government requirements for delivery based on common industry and government methods for inspection and acceptance which may include UID marking, inspection and acceptance (DD 250) and inventory integration at government designated locations to be determined at time of delivery to include but not be limited to: NGC facilities, Rancho Bernardo; Edwards AFB, Beale AFB. This is a request for information only. This is not a request for quote.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/88 CONS/FA8620-11-T-3002/listing.html)
 
Record
SN02280837-W 20100916/100914235603-e6ba8ce6522e9794d4aaf516d4ab3283 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.