Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 17, 2010 FBO #3219
MODIFICATION

D -- RECOVERY - Amendment to Solicitation No. RA000910512 - PBX System for Many Farms High School

Notice Date
9/15/2010
 
Notice Type
Modification/Amendment
 
Contracting Office
BIA - Navajo Regional Office Division of Acquisition P. O. Box 1060301 W. Hill Rm 346 Gallup NM 87305
 
ZIP Code
87305
 
Solicitation Number
RA000910512
 
Response Due
9/22/2010
 
Archive Date
9/15/2011
 
Point of Contact
Lynelle Benallie Contract Specialist 5058638404 lynelle.benallie@bia.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
N/A
 
Description
RECOVERY - This procurement will be firm-fixed price and is funded in whole by the American Recovery and Reinvestment Act (ARRA) of 2009 and is subject to reporting requirements of the Act. TAS No. 14 9/0 2101. Project No. D35N21. Solicitation No. RA000910512 is amended as follows: 1. The response date is extended to September 22, 2010, 4:30 p.m. Local Time. 2. A site visit is highly recommended. Contact Mr. Brian Dillon, Principal, or Mr. Raymond Levins, IT Staff, at 928/781-6226/6227 for a site visit. 3. The following specifications are included to the Solicitation: EQUIPMENT: A. Main Copper Distribution:-Utilize existing 50 pair cable between Admin Building and Academic Building -Install 1-25 pair cable from Admin to Alternative Learning Center (Building #1164)-Install 1-25 pair cable from Admini to Buildings #1157, #1167, #1165, and #1370-Install 1-25 pair cable from Admin to Buildings #1161, #1162. and #1163-Install and terminate 1-25 pair protector at each Buildings MPOP-Install 2-100 Pair Protectors at Admin MDF-Test and Certify all newly installed cable-Provide Visio as-builts and cable certification upon completion B. IDF Copper Feeds-Install 1-25 pair plenum rated copper cable from each of 8 buildings MPOP's to each buildings new IDG. (Buildings 1157, 1164, 1167, 1165, 1163, 1162, 1161, 1370, and Gym). -Install 1-25 pair plenum rated copper cable from MPOP at Academic Building to each of 4 IDF's within the Building.-Install 1-100 pair plenum rated copper cable from MPOP in Admin Building to new MDF location. In Admin building, extend buildings new cable backbone to "Phone System" data rack and terminate on dedicated "voice" patch panels, (6-24 port patch panels)-Terminate all extended copper feeds from MPOP's to IDF's on 24 port cat5e patch panels and dedicate to voice. (As listed on line item's 1 & 2).-Test and certify all newly install cable-Provide visio as-builts and cable certification upon completion C. Additonal Voice Drops-Install 1 new wall mount open data cabinet in buildings 1162, 1163, 1167, 1370, and 1165.-Install 1-enclosed 2x2 wall mount enclosed data cabinet in farm building-Install new 12 port LIU's in buildings 1162, 1163, 1167, 1165 and 1370-Re terminate all strands of fiber optic cable in buildings 1162, 1163, 1165, 1167, 1370-Install new voice drops as follows: (utilizing cat6 plenum cable)3-1163, 3-1167, 2-1157, 2-1370, 2-1164, 2-162-Install new voice drops listed above to new IDFs and terminate on cat 6 patch panels.-Test and certify all newly installed cable-Provide visio as-builts and cable certification upon completion D. Telephone Sets - 6400 Series Avaya 6408D+ Digital Display Telephone - 40 eachAvaya 6416D+ Digital Display Telephone-34 eachAvaya 6424D+ Digital Display Telephone-9 each E. Additional Network Equipment:-WS-G5484, Cisco GBIC 10000BASE-SX Transceiver module-GBIC-Gigabit EN 1000 Base-SC- 850 nm, 4 each-WS-C2960G-24TC-L, Cisco Catalyst 2960G-24TC-Switch-20 ports - EN, Fast EN - 10 Base T + 4X10/100/1000Base-T/SFP - Gigabit EN 1000Base-T/SFP (mini-GBIC)(uplink) - 1U; 5 each- GLC-SX-MM= Cisco - Transeiver module - SFP - Gigabit EN 100Base-SX 850 nm; 5 each- SUA750RM2U APC Smarter-UPS RM 750VA (rack-mountable) - AC 120 V; 5 each- AIR-BR1310G-A-K9-R Cisco Aironet 1310 Outdoor Access Point/Bridge - Wireless access point - 802.11b, 802.11g; 1 each-AIR-ANT1949 2.4 GHz, 13.5 dBi Yagi Mast Mount Ant. w/RP-TNC Connector; 1 each-AIR-CAB050ll-R, Cisco - Antenna cable-RP - TNC 9F) - RP-TNC (F) - 50 FT; 1 each 4. Include the following clauses: FAR 52.211-6 -Brand Name or Equal; and DIAR 1452.210-70 Brand Name or Equal. 5. All other terms and conditions to remain the same in full force and effect.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/RA000910512/listing.html)
 
Place of Performance
Address: Many Farms High School, Many Farms, AZ
Zip Code: 865380307
 
Record
SN02282680-W 20100917/100915235821-82b03ba6e85448d84a7bcba3d030e596 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.