Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 18, 2010 FBO #3220
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 1450, Pearson - Skubitz Big Hill Lake, KS

Notice Date
9/16/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-1008
 
Archive Date
10/16/2010
 
Point of Contact
Phyllis O. Jordan, 918 832-4120
 
E-Mail Address
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-09-D-1003, TO 0004, 000408
 
Award Date
9/16/2010
 
Awardee
HDB CONSTRUCTION, INC. (144525003)<br> 729 SE WEAR AVE<br> TOPEKA, KS 66607-1769
 
Award Amount
$0.00
 
Line Number
1
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER: MATOC As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to HDB Construction, Inc., to perform the following work: Place a 2-inch asphalt overlay over the following areas: (1) Mound Valley north loop repair areas road D; 236 SY. (2) Mound Valley group camp road C-1 and parking; 3450 SY. (3) Timberhill boat ramp parking area; 6030 SY. (4) Timberhill Rd B; 2640 SY. (5) Timberhill Rd A from boat ramp to Rd B; 2209 SY (6) Cherryvale Park road A approx sta 2+00 to 20+50 and parking areas; 4870 SY. Asphalt materials and placement shall meet Kansas Department of Transportation specifications; with tack coat and 2 inch asphalt overlay. All transitions into pullouts are to be a minimum of 2 feet. Transitions into existing asphalt are to be milled to a depth of 2 inches. Asphalt leveling course shall be used in place of Full Depth Road Repair. All work shall be completed as defined in the base MATOC contract. Eliminate micropaving and change to 2-inch asphalt overlay by reducing total quantities.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-1008/listing.html)
 
Record
SN02284256-W 20100918/100916235336-92d7a48049e9729f661cdc41f6e59b31 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.