Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 18, 2010 FBO #3220
SOLICITATION NOTICE

12 -- Quarterly and Annual Preventative Maintenance on LPMD Fire Alarm System - Solicitation

Notice Date
9/16/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
922160 — Fire Protection
 
Contracting Office
Department of the Army, U. S. Army Materiel Command, Anniston Chemical Agent Disposal Facility (ANCDF), 3580 MORRISVILLE ROAD, Anniston, Alabama, 36201, United States
 
ZIP Code
36201
 
Solicitation Number
WA-FY11-AR-580
 
Archive Date
10/22/2010
 
Point of Contact
Ashley Rollins, Phone: 256-238-0721 x 131
 
E-Mail Address
ashley.rollins@wancdf.com
(ashley.rollins@wancdf.com)
 
Small Business Set-Aside
N/A
 
Description
Solicitation 1 st scope of work - Annual Preventative Maintenance (1 performance per fiscal year) Work shall include but not limited to the following: •1. Inspection of all system components for damage •2. Verification of proper system activation •3. Verification of indications and alarms •4. Activate a sample equal to or greater than 20% of total fire alarm input devices to accomdate a 100% device test within a five (5) year period. This 20% should represent devices in each area of the building. •5. Inspection and cleaning of any smoke detector devices in the system. •6. Verify all water flow switches operate correctly. •7. Verify all tamper switches operate. •8. Verify alarm and trouble indication signals are sent to and received by ANAD Fire Department. •9. Reset system. Verify all lamps operate during reset or lamp test. •10. Test batteries utilizing manufacturers' test procedure. •11. Test ground fault detection circuitry and verify proper operation. •12. Contractor shall update the inspection tag to reflect the date and system condition. 2 nd scope of work - Quarterly Preventative Maintenance (4 performances per fiscal year) Work shall include but not limited to the following: •1. Visual inspection of all devices, verify no changes have been made to the system. •2. Inspect all system zones and verify that there are no trouble or alarm conditions. •3. Perform a visual inspection of the batteries and verify voltage is between 24 - 28 vdc utilizing voltage meter. •4. After completion, update the inspection card to reflect the date of inspection, person performing the inspection and company name. Contractor shall provide WA Subcontract Administrator documentation within (14) days stating that the tested system meets quarterly and/or annual inspections as required by NFPA 72. Documentation shall include any deficiencies found during inspections. Contractor will participate in the pre-job briefings to ensure that good communications are established with ANCDF Subcontracts, Engineering, Maintenance and Operations departments before any work begins. Extreme caution shall be taken to ensure that unplanned outages due not occur. An electrical technician will be present in order to escort the contractor during the inspection/testing.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/6143acbe348d6511999571f27041fa1b)
 
Place of Performance
Address: 3580 Morrisville Road, Anniston, Alabama, 36201, United States
Zip Code: 36201
 
Record
SN02284843-W 20100918/100916235848-6143acbe348d6511999571f27041fa1b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.