FBO DAILY ISSUE OF SEPTEMBER 19, 2010 FBO #3221
SOLICITATION NOTICE

Z -- Phase 3 Infrastructure Upgrade of Building 3001, Tinker Air Force Base, OK

Notice Date
9/17/2010
 
Notice Type
Presolicitation
 
NAICS
236210 — Industrial Building Construction
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-11-R-2000
 
Response Due
11/4/2010
 
Archive Date
1/3/2011
 
Point of Contact
tinacox, 9186697088
 
E-Mail Address
USACE District, Tulsa
(tina.a.cox@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Request for Proposal package is anticipated to be posted on 4 October 2010. Construction magnitude is Between $ 10,000,000 and $25,000,000. THE PHASE 3 INFRASTRUCTURE UPGRADE OF BUILDING 3001 IS A FY11 MILCON PROJECT LOCATED ON TINKER AFB AND IS SCHEDULED FOR SOLICITATION ON 4 OCTOBER 2010. THIS IS A SINGLE PHASE DESIGN/BUILD PROJECT. B3001 WAS BUILT IN 1942 AND THE UTILITY SYSTEMS HAVE EXCEEDED THEIR LIFE EXPECTANCY. THE SCOPE OF THE PROJECT INCLUDES THE DESIGN AND CONSTRUCTION OF NEW CHILLED WATER SUPPLY AND RETURN MAINS (TWO 24 INCH LINES) ABOVE ROOF OF B3001 FROM COLUMN ROW 31 TO 81 (1500FT) ALONG WX AISLE (IN THE MIDDLE OF THE FACILITY). THE KEY COMPLEXITY OF THIS PROJECT IS THE LOGISTICS OF PLACING THE STRUCTURAL STEEL TO BUILD THE UTILITY ENCLOSURE ON THE ROOF OF B3001. THIS ENCLOSURE WILL HOUSE THE TOW NEW MAIN TRUNK LINES. IN ADDITION, THIS AREA OF B3001 INCLUDES NUMEROUS SHOPS RESPONSIBLE FOR THE MAINTENANCE AND REPAIR OF MILLION DOLLAR AIRCRAFT PARTS. BECAUSE OF THE 1500 FOOT LENGTH AND LIMITED SPACE FOR CRANE USAGE, A LARGE PORTION OF THIS WORK MAY REQUIRE THE USE OF HELICOPTER LIFTS TO TRANSFER THE STRUCTURAL STEEL. THIS FEATURE OF THE CONSTRUCTION PHASE WILL HAVE TO BE PERFORMED AT NIGHT OR ON THE WEEKENDS SINCE THE BLDG 3001 OCCUPANTS (PERSONS AND VEHICLES) CANNOT BE UNDER THE PATH OF THE HELICOPTER OR UNDERNEATH ANY OF THE PLACEMENT OF THE UTILITY CORRIDOR AND STRUCTURE. ABATEMENT OF LEAD-BASE PAINT, HEAVY METAL DUST, AND ASBESTOS WILL ALSO BE A REQUIRED FEATURE OF WORK. THE CONTRACTOR MUST MINIMIZE OR HAVE A ZERO IMPACT TO THE PRODUCTION SCHEDULE OF THE SHOPS DURING ABATEMENT EFFORTS. SINCE BUILDING 3001 IS A HISTORICAL STRUCTURE, COORDINATION WITH THE STATE HISTORIC PRESERVATION OFFICE (SHPO) DURING THE DESIGN IS REQUIRED. THE SHPO MUST APPROVE THE DESIGN OF THE UTILITY ENCLOSURE. THE REVIEW AND APPROVAL PHASE BY SHPO MAY TAKE UP TO 6 MONTHS; HOWEVER, TINKER AFB ENVIRONMENTAL PERSONNEL ARE WORKING WITH SHPO TO SHORTEN THIS REVIEW PERIOD FOR THIS PROJECT.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-11-R-2000/listing.html)
 
Place of Performance
Address: USACE District, Tulsa ATTN: CESWT-CT, 1645 South 101st East Avenue Tulsa OK
Zip Code: 74128-4609
 
Record
SN02286156-W 20100919/100917234933-8562432f26b54c8577f1639c511951b8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.