AWARD

Y -- RECOVERY Y--RECOVERY ACT PROJECT 640A4-09-120L FCA "Remediate Asbestos Bldg 6 & Old Bridge" Livermore Division

Notice Date
9/21/2010
 
Notice Type
Award Notice
 
NAICS
562910 — Remediation Services
 
Contracting Office
VA Northern California HealthCare System;5342 Dudley Blvd. Bldg 98;McClellan Business Park CA 95652
 
ZIP Code
95652
 
Solicitation Number
va26110RA0133
 
Archive Date
10/28/2010
 
Point of Contact
Tracy A Marasco
 
E-Mail Address
ct
 
Small Business Set-Aside
N/A
 
Award Number
VA261-RA-0875
 
Award Date
7/21/2010
 
Awardee
CLAUSS CONSTRUCTION;8956 WINTER GARDENS BLVD;LAKESIDE;CA;920404935
 
Award Amount
$779,810.00
 
Line Number
ALL
 
Description
Department of Veterans Affairs VA PALO ALTO HEALTH CARE SYSTEM LIVERMORE DIVISION SCOPE OF WORK REMEDIATE ASBESTOS BLDG. 6 & OLD BRIDGE GENERAL Contractor shall provide all labor, materials, tools, supervision, transportation, safety measures, traffic control necessary to perform the following work. Work hours shall be Monday to Friday, 8:00 am to 4:30 pm Contractor shall submit Abatement Plan to VA IH, shall need to be approve prior for contractor to start. PHASE I - Building 6 Boiler Plant "Abatement Current test results shown existing exterior walls contained from 1 - 5% lead, Asbestos Containing Material.) Contractor shall abate asbestos and lead on exterior walls. Contractor shall provide 24 hour Emergency Hazardous Material Clean up and Disposal during abatment work of asbestos and or lead abatement. "Door Replacement Contractor shall demo 2 doors, remove, replace, match existing doors with new hardware and new locks (see attached pictures) "Painting After the abatement, contractor shall apply 1 coat of primer and 2 coats of finish elastomeric paint on exterior walls. Contractor shall sand, prime, paint doors (not on door minute rating tag), gutters, ladders, louvers, roof piping and stairs. Windows shall be prime and 2 finish coats (hand brush) Color shall be selected by Veterans Affairs Interior Designer. Contractor also shall remove, reinstall signs, kickplates, etc at the boiler plant. "Windows Repair and Sealing Remove and replace with new windows screens. Reglaze all metal frame windows on exterior building 6. Recaulk, re-seal around all doors, door frames, windows frames. Clean up existing paint, rust and foreign materials. Remove all dust, oil, debris from surface of building, replace glazing putty on all metal window frames, paint all cleaned surfaces. PHASE I I - Old Bridge Lead Paint Removal Entire Bridge (including removal of columns, slabs, walls) & Apply 2 Prime Coats. "Abatement Current Test Results shown lead paint results contained Lead Based Paint (2.73; 1.78; 1.51%); green paint chip walls contain 1.51% lead including outside bridge walls. Contractor shall: a.Provide a safety buffer underneath the bridge so during abatement, no debris falls into the creek. An independent Certified IH to monitor the entire work, record daily air samples monitoring at the job site as required by OSHA. All costs shall be paid by contractor. b.Bat Colony Box, contractor shall provide adequate protection during abatement process. VA COTR and Contractor will communicate with LARPD(Livermore Area Recreation & Park District) to find out proper protection of bat boxes. c.Contractor shall scrape loose and flaky paint from the metal bridge, stabilize scraped areas with acoat of primer. Areasthat have been scraped shall be stabilized with a coat of Lead Barrier Compound Encapsulant (MSDS, Material Safety Data Sheet Literature, shall be submitted to VA Staff for approval.) d. VA shall contact LARPD for closing trails during actual abatement work. Contractor shall shall post signs are closing. Trails closure shall be handled by LARPT (Livermore Area Recreation & Park District) Contractor shall provide all power, water, toilets. "Notifications: All work shall meet all applicable codes and regulations detailed comprehensive Contractor shall provide notification to the following as a minimum: AHERA. Alameda County Flood Control (Zone 7) Alameda County Planning Department. Bay Area Air Quality Management District (BAAQMD) Cal OSHA for all asbestos or lead disturbance on this job. DTSC (The California Department Of Toxic Substances Control.) Environmental Protection Agency (E.P.A) Livermore Area Recreation & Park District (LARPD) Department Fish and Game.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VANCHCS/VANCHCS/Awards/VA261-RA-0875.html)
 
Record
SN02290783-W 20100923/100921235416-e2b569d5ffa152da44f5ffa35180478b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.