SOLICITATION NOTICE

Y -- Rio Grande Valley Border Fence Gates, Electric Service to Proposed Border Fence Gates in Cameron County, Texas. - Justification and Approval (J&A)

Notice Date
9/21/2010
 
Notice Type
Justification and Approval (J&A)
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
USACE District, Galveston, 2000 Fort Point Road, PO Box 1229, Galveston, TX 77553-1229
 
ZIP Code
77553-1229
 
Solicitation Number
W912HY-10-P-0077
 
Archive Date
10/21/2010
 
Point of Contact
Lucille Smith, 409 766-3845
 
E-Mail Address
USACE District, Galveston
(lucille.r.smith@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912HY-10-P-0077
 
Award Date
9/20/2010
 
Description
Control No. 10-05 Brownsville Public Utilities Board (BPUB) will provide electrical service to the proposed border fence gates as follows. Completion date is March 31, 2011. All work shall be performed in accordance with the attached BPUB Work Orders: Gate O-18-3 Colonia Galaxia - Install 10Kva 120/240V pole mounted transformer on pole #35836 and extend 70' of #2 STR 3/C Al. secondary cable to meter point Gate O-18-4 Jo Ann Lane - Upgrade existing 15Kva transformer to 25Kva 120/240V pole mounted transformer on pole #54382 and extend 120' of #2 STR 3/C Al. secondary cable to meter point Gate O-18-6 Northwest of Power Plant /Cable Gap Rd - Install 3-40' wood poles with respective attachments. Install 600' of single phase of 1/0 STR Al bare cable, 400' of 1-PH 1/0 STR 15KV Al underground cable, and 25KVA 7200:120/240V pad mounted transformer. Install 20' of #2/0 STR 3/C Al secondary cable. Gate O-19-1 West of B&M Bridge, Amigo Land Pump House - Extend 30' of #2 STR Al secondary cable from existing transformer to meter location. Gate O-19-2 West of B&M Bridge - Extend 900' of single phase 1/0 STR Al primary cable using existing poles, install 10 Kva 120/240V pole mounted transformer and extend 30' of #2 STR Al. secondary cable to meter location. Gate O-19B-4 West of National Guard /Art League Ramp - Install 40' wood pole with D-11, D-3, D-36, D-8, 10Kva 120/240V transformer. Install 150' of 1/0 STR Al primary cable and extend 50' of #2 STR secondary cable. O-20-2A West of Veterans Bridge / Camera Tower Gate - Install 30' of #2 STR 3/C Al secondary cable from proposed 25KVA 7200:120/240V pad mount transformer to meter point. O-20-2B Ramp West of Veterans Bridge - Install 25KVA 7200:120/240V pad mounted transformer. Install 50' of 1-PH 1/0 STR 15KV Al underground cable from proposed J-box. Install 70' of #2 STR 3/C Al underground cable to meter point. Reference the Brownsville Public Utilities Board Electrical Engineering Work Orders 21626, 21627, 21629, 21630, 21631, 21633, 21635 and 21628 copies enclosed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA64/W912HY-10-P-0077/listing.html)
 
Record
SN02291036-W 20100923/100921235624-230ea3462412330e951b9f03b757b540 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.