SOLICITATION NOTICE
Y -- AZ PFH51-1(2), Control Road Design-Build
- Notice Date
- 9/22/2010
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-11-R-00001
- Archive Date
- 2/28/2011
- Point of Contact
- Aaron L. Sanford, Phone: 7209633090, Lori T. Kliethermes, Phone: 7209633090
- E-Mail Address
-
cflcontracts@dot.gov, lori.kliethermes@dot.gov
(cflcontracts@dot.gov, lori.kliethermes@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS PROCUREMENT IS ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION). PROJECT DETAILS: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) intends to conduct a "two phased" Design-Build (D-B) selection process for the Tonto National Forest Bridge Rehabilitation/ Replacements Project in Payson, Arizona. The Tonto National Forest Bridge Replacement Project is to design and rehabilitate/construct 7 new bridge replacements for the sub-standard geometric & structural deficient bridges and to hydraulically improve one at-grade stream crossing along Forest Highway 51 (also known as National Forest System Road 64) in Gila County, AZ. The subject bridges and 1 low water crossing on Forest Highway 51 are listed below: Webber Creek Bridge, Milepost 5.7, span length = 110 feet Lewis Creek Bridge, Milepost 16.8, span length = 30 feet Bonita Creek Bridge, Milepost 13.8, span length - 30 feet Ellison Creek Bridge, Milepost 17.4, span length = 45 feet Perley Creek Bridge, Milepost 14.7, span length = 30 feet Roberts Draw Bridge, Milepost 19.6, span length = 45 feet Moore Creek Bridge, Milepost 15.4, span length = 30 feet Tonto Village Low Water Crossing, Milepost 20.5, span length = 30 feet Work on the 8 structures will involve hydraulic enhancements, roadway geometric improvements and updating Bridge design requirements to the AASHTO HL-93 load carrying criteria. The existing seven bridges are either single or double span and had their wooden deck replaced with a concrete slab in the late 1950's. Roadway/bridge quantities for the Design/Build project are expected to involve improvements to roadway approach's at all 7 bridge structures, bridge/drainage structure construction, guardrail replacement, retaining wall design, geo-technical investigations and recommendations, foundation design, placing embankment, stone masonry wingwalls, public co-ordination activities, minor asphalt paving and permit application. Estimated cost for the project is $3.5 to $5.5 million. Tentative advertisement date for Phase I, Request for Qualifications (RFQ), is October 11, 2010. PLEASE NOTE: The RFQ will be available for download on or after October 11, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. Questions related to the RFQ must be submitted to CFLContracts@dot.gov or FAX to (720) 963-3360.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-R-00001/listing.html)
- Place of Performance
- Address: Payson, Arizona, 85541, United States
- Zip Code: 85541
- Zip Code: 85541
- Record
- SN02291962-W 20100924/100922234839-1345db192f7adedbbf89de8dbb38210b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |