Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 24, 2010 FBO #3226
SOLICITATION NOTICE

Y -- AZ PFH51-1(2), Control Road Design-Build

Notice Date
9/22/2010
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-R-00001
 
Archive Date
2/28/2011
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Lori T. Kliethermes, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, lori.kliethermes@dot.gov
(cflcontracts@dot.gov, lori.kliethermes@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS PROCUREMENT IS ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION). PROJECT DETAILS: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) intends to conduct a "two phased" Design-Build (D-B) selection process for the Tonto National Forest Bridge Rehabilitation/ Replacements Project in Payson, Arizona. The Tonto National Forest Bridge Replacement Project is to design and rehabilitate/construct 7 new bridge replacements for the sub-standard geometric & structural deficient bridges and to hydraulically improve one at-grade stream crossing along Forest Highway 51 (also known as National Forest System Road 64) in Gila County, AZ. The subject bridges and 1 low water crossing on Forest Highway 51 are listed below: Webber Creek Bridge, Milepost 5.7, span length = 110 feet Lewis Creek Bridge, Milepost 16.8, span length = 30 feet Bonita Creek Bridge, Milepost 13.8, span length - 30 feet Ellison Creek Bridge, Milepost 17.4, span length = 45 feet Perley Creek Bridge, Milepost 14.7, span length = 30 feet Roberts Draw Bridge, Milepost 19.6, span length = 45 feet Moore Creek Bridge, Milepost 15.4, span length = 30 feet Tonto Village Low Water Crossing, Milepost 20.5, span length = 30 feet Work on the 8 structures will involve hydraulic enhancements, roadway geometric improvements and updating Bridge design requirements to the AASHTO HL-93 load carrying criteria. The existing seven bridges are either single or double span and had their wooden deck replaced with a concrete slab in the late 1950's. Roadway/bridge quantities for the Design/Build project are expected to involve improvements to roadway approach's at all 7 bridge structures, bridge/drainage structure construction, guardrail replacement, retaining wall design, geo-technical investigations and recommendations, foundation design, placing embankment, stone masonry wingwalls, public co-ordination activities, minor asphalt paving and permit application. Estimated cost for the project is $3.5 to $5.5 million. Tentative advertisement date for Phase I, Request for Qualifications (RFQ), is October 11, 2010. PLEASE NOTE: The RFQ will be available for download on or after October 11, 2010, from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. Questions related to the RFQ must be submitted to CFLContracts@dot.gov or FAX to (720) 963-3360.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-R-00001/listing.html)
 
Place of Performance
Address: Payson, Arizona, 85541, United States
Zip Code: 85541
 
Record
SN02291962-W 20100924/100922234839-1345db192f7adedbbf89de8dbb38210b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.