Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 05, 2010 FBO #3207
SOLICITATION NOTICE

R -- Jefferson City, MO

Notice Date
9/3/2010
 
Notice Type
Presolicitation
 
Contracting Office
Environmental Protection Agency, Headquarters Procurement Operations Division, 1200 Pennsylvania Avenue, Nw, Washington, DC 20460
 
ZIP Code
20460
 
Solicitation Number
RFQ-DC-10-00231
 
Response Due
9/16/2010
 
Archive Date
10/16/2010
 
Point of Contact
Point of Contact, Kelly Easterling, Purchasing Agent, Phone (202) 564-8421
 
E-Mail Address
U.S. Environmental Protection Agency
(Easterling.Kelly@epamail.epa.gov)
 
Small Business Set-Aside
N/A
 
Description
NAICS Code: 541320 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, and Subpart 13.106, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotesare being requested and a written solicitation will not be issued. The solicitation number is RFQ-DC-10-00231 and is being issued as a Request for Quotations (RFQ). The solicitation document and incorporated provisions are those in effect through FAC 2005-45. The United States Environmental Protection Agency (US EPA), Office of Policy, Economics, and Innovation (OPEI), is seeking a contractor to assist state capitals in developing an innovative and implementable vision of distinctive, environmentally friendly neighborhoods incorporating green building and green infrastructure systems. The North American Industry Classification System (NAICS) code is 541320. The Small Business Size Standard is $7.0M. This requirement is a total set-aside for small businesses. Contractors shall indicate in its response how it meets the small business size standard to qualify for award. EPA anticipates awarding a fixed-rate purchase order with a ceiling established based on an estimated level of effort (LOE) of 500-550 hours. The period of performance will be nine (9) months from the date of award. Proposals shall address all aspects of the SOW and are limited to 25 pages in length, inclusive of all documents. Offerors shall provide separate cost and technical volumes. Offerors shall submit a cost proposal utilizing fixed rates and any anticipated other direct cost estimates to develop a proposed overall ceiling price based on the Statement of Work (SOW) below. Questions regarding this solicitation shall be submitted to Bradley Austin, Contracting Officer, at austin.bradley@epa.gov by 2:00 p.m. EST on Wednesday, September 8, 2010. Quotes shall be submitted electronically in Word or Adobe to Kelly Easterling, Contract Specialist, easterling.kelly@epa.gov, by 2:00 p.m. EST on Thursday, September 16, 2010. The following provisions and clauses apply to this acquisition: 52.212-1, Instructions to Offerors?Commercial Items; 52.212-3, Offeror Representations and Certifications?Commercial Items; 52.212-4, Contract Terms and Conditions?Commercial Items. The clause at FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders?Commercial Items, applies to this solicitation. Specifically, the following clauses cited are applicable to this solicitation: FAR 52.222-3, FAR 52.222-19, FAR 52.222-21, FAR 52.222-26, FAR 52.222-35, FAR 52.222-36, FAR 52.222-37, FAR 52.222-39, FAR 52.232-33, FAR 52.222-41 and FAR 52.222-42. Interested parties may submit their ORCA information (http://orca.bpn.gov) in lieu of the representations and certifications requested above. Prospective sources are reminded that an award can only be made to a Contractor who is registered in the Central Contractor Registration Database, IAW FAR 4.11. Contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220 or via online at http://www.ccr.gov. Evaluation Factors: Quotes submitted in response to this solicitation will be evaluated on a best value basis. Quotes will be evaluated on the ability to meet the requirements listed in the SOW below to include technical competence, personnel and relevant past performance. 1. Technical Competence-Knowledge of and demonstrated work (required) that considers the local ecoregion for Jefferson City, Missouri, including geology, physiography, vegetation, climate, soils, land use, wildlife, and hydrology.--Midwest Ecoregion: Defined by mild, but rainy winters, hot and humid summers with thunderstorms and heavy rains. Region around Jefferson City is marked by the importance of the Missouri River and its tributaries, and is an area expected to see more intense and frequent storm events as a result of climate change. This region has an important agricultural history with increasing urbanization over time. -Expertise creating high-quality design drawings and site plans, either freehand or digitally, during an on-site workshop, especially related to smart growth, specifically the creation of compact, walkable neighborhoods.-Knowledge of and demonstrated design work with creek or waterway restoration projects to reintegrate water systems into a developed urban setting and reconnect people with waterways. -Experience developing design solutions for public spaces that include consideration of environmental performance through natural systems as well as community benefit and aesthetics, such as for streets, parks, plazas, civic centers that reflect sense of place and local goals, as evidenced by awards received, publications, presentations at national conferences, etc. Experience should include streetscape re-designs in a range of settings, including, but not limited to residential streets, business districts, and arterial roadways.-Knowledge of and demonstrated design work with green infrastructure solutions, including for minimizing impervious surfaces and managing stormwater runoff, which can achieve multiple benefits. Knowledge of and demonstrated work on green building techniques for private development, e.g., energy and water efficiency, waste reduction, and sustainable landscape design. -Understanding and experience analyzing and/or developing public policies that are used to support sustainable design strategies, as well as engaging different levels of government and external stakeholders (public, NGOs, developers) to consider design implementation and policy adoption.2. PersonnelProfessional qualifications including education, relevant experience, certifications and capabilities. 3. Past PerformanceOfferors should provide a list of previous work, similar in scope to the statement of work, performed in the past five years. Statement of WorkGreening America?s Capitals ? Jefferson City, MOCapitol Avenue Public Space and Green Streets Redevelopment and Redesign Background and Purpose Greening America?s Capitals is a new project of the U.S. Environmental Protection Agency (EPA) - U.S. Department of Housing and Urban Development (HUD) - U.S. Department of Transportation (DOT) Partnership for Sustainable Communities to help state capitals develop an innovative and implementable vision of distinctive, environmentally friendly neighborhoods that incorporate innovative green building and green infrastructure systems. Greening America?s Capitals will work with city staff of state capitals to foster a strong sense of place by incorporating sustainable design techniques into the streets, parks, waterfronts, town squares, and civic buildings. Sustainable design techniques might include, but are not limited to: -Accessible and restored waterways in a developed urban setting;-Integrated, community-appropriate uses for brownfields or vacant lands;-Aesthetically and functionally valuable landscape architecture designs for green infrastructure that result in both community and water quality benefits; -Reduced energy and infrastructure costs through better green building designs that meet multiple objectives;-Well-designed public art and civic design strategies that highlight the importance of these shared spaces for community identity; and-Planning and design strategies for better climate change adaptation and resiliency. This place-based design assistance will help selected state capitals envision ways to clean-up and recycle vacant lands, provide greater housing and transportation choices, reduce infrastructure and energy costs, and build civic pride in neighborhoods and the city as a whole. EPA will fund a Contractor team to visit Jefferson City, Missouri for up to three days to produce schematic designs and before and after illustrations intended to catalyze, or complement, a larger planning process for the Wears Creek and Millbottom area. The charrette will be an opportunity to develop detailed visuals and graphics for this area and connections to nearby locations, such as the State Capitol building and the Southside neighborhood. This focus area will serve as a place-based pilot for larger, city-wide actions such as changes to local codes and ordinances to better support sustainable growth and green building. EPA is providing this design assistance to help create stronger communities that protect the environment. Greening America?s Capitals will help communities consider ways to incorporate the ten principles of smart growth, in particular the principle to ?foster distinctive, attractive communities with a strong sense of place,? and similarly, one of the six livability principles of the EPA-HUD-DOT Partnership to ?support existing communities.? Furthermore, effective strategies for creating a strong sense of place, such as street and public space design using innovative stormwater practices, and sustainable green building techniques, can also address a community?s environmental concerns and help revitalize neighborhoods, spurring additional economic and social benefits. The study area lies at the doorstep of the Missouri State Capitol and serves as the main entry point into Jefferson City by many tourists and residents. The primary area of focus is bound on the west by Highway 63/54, on the north by the Missouri River, to the south by Highway 50/63, and by the Capitol to the east. Wears Creek and vacant properties within the study area provide the greatest opportunity for reconnecting nearby residents in the Southside neighborhood to the riverfront. In addition, Wears Creek can serve as an important connection to planned bike/ped greenways in Jefferson City. EPA?s support of the Jefferson City project is also undertaken to advance EPA?s Urban Waters initiative, which seeks to support communities in their efforts to access, improve, and benefit from their urban waters and the surrounding land. EPA?s Urban Waters initiative has a particular emphasis on the engagement of underserved neighborhoods and on equity in water access and community revitalization. EPA?s assistance to Jefferson City will integrate the goals of both the agency?s urban waters and livability efforts. The purpose of this work assignment is to provide a set of illustrations depicting a sustainable civic vision for the Wears Creek and Millbottom area and to provide specific next steps for policy changes that the city can use to either kick-start a public involvement and planning process, or complement a process currently underway. Personnel It is expected that the following skills will be required to carry out this technical assistance: -Knowledge of and demonstrated work (required) that considers the local ecoregion for Jefferson City, Missouri, including geology, physiography, vegetation, climate, soils, land use, wildlife, and hydrology.--Midwest Ecoregion: Defined by mild, but rainy winters, hot and humid summers with thunderstorms and heavy rains. Region around Jefferson City is marked by the importance of the Missouri River and its tributaries, and is an area expected to see more intense and frequent storm events as a result of climate change. This region has an important agricultural history with increasing urbanization over time. -Expertise creating high-quality design drawings and site plans, either freehand or digitally, during an on-site workshop, especially related to smart growth, specifically the creation of compact, walkable neighborhoods.-Knowledge of and demonstrated design work with creek or waterway restoration projects to reintegrate water systems into a developed urban setting and reconnect people with waterways. -Experience developing design solutions for public spaces that include consideration of environmental performance through natural systems as well as community benefit and aesthetics, such as for streets, parks, plazas, civic centers that reflect sense of place and local goals, as evidenced by awards received, publications, presentations at national conferences, etc. Experience should include streetscape re-designs in a range of settings, including, but not limited to residential streets, business districts, and arterial roadways.-Knowledge of and demonstrated design work with green infrastructure solutions, including for minimizing impervious surfaces and managing stormwater runoff, which can achieve multiple benefits. Knowledge of and demonstrated work on green building techniques for private development, e.g., energy and water efficiency, waste reduction, and sustainable landscape design. -Understanding and experience analyzing and/or developing public policies that are used to support sustainable design strategies, as well as engaging different levels of government and external stakeholders (public, NGOs, developers) to consider design implementation and policy adoption. Tasks and Deliverables Task 1 ? Conduct pre-charrette assessmentPurpose: The purpose of this task is to establish baseline conditions for the Wears Creek and Millbottom area and develop initial design responses that address the needs of the community and are appropriate for the specific site conditions. The discussions between the Contractor and Jefferson City and EPA staff regarding the initial design responses will form the basis for an on-site charrette. The Contractor shall participate in preliminary calls with Jefferson City staff and stakeholders to determine physical area of focus and sustainability challenges to address within approximately two weeks of contract being awarded. Upon determination of the study area boundaries, the Contractor shall develop appropriate base maps illustrating larger site context (e.g., connections to adjacent neighborhoods) and a map at a larger scale illustrating the specific study area(s) using contextual maps, aerials, GIS data and site plans received from city staff. Upon completion of the base map and approval by EPA and city staff, the Contractor shall develop an Existing Conditions map that effectively illustrates site conditions such as floodplain boundaries, vegetation cover, location of confirmed or suspected brownfield contamination, existing bike/ped connections, etc.). To prepare city staff, stakeholders, and EPA for the charrette, the Contractor shall develop and deliver a set of materials that can include, but is not limited to: -base maps, larger scale maps, and existing conditions maps -a selection of six to eight initial design schematics -a PowerPoint presentation no longer than 20 minutes that defines public realm, green streets, and neighborhood sustainability principles and the applicability to the Wears Creek and Millbottom area and surrounding context. All examples used must be regionally relevant and reflect similar environmental conditions to those of the community. Task 1 Deliverables and Timeline: 1a. Participate in approximately three conference calls with Jefferson City staff and stakeholders within approximately two week of project kick off call.1b. Base maps and existing conditions maps for review by EPA and Jefferson City staff three weeks prior to charrette.1c. If necessary, respond to EPA comments within one week of receiving comments. 1d. Six to eight initial design schematics to be reviewed by Jefferson City and EPA staff two weeks prior to charrette.1e. If necessary, respond to EPA comments within one week of receiving comments. 1f. PowerPoint presentation no longer than 20 minutes that defines public realm, green streets, and neighborhood sustainability principles and the applicability to the Wears Creek and Millbottom area one week prior to the on-site charrette. 1g. If necessary, respond to EPA comments within one week of receiving comments. Task 2 ? Participate in on-site design charrettePurpose: The purpose of this task is to describe the primary focus of this scope of work. The Contractor shall participate on site in a three to four day charrette and all associated activities. During the workshop, the Contractor shall create design illustrations with a focus on in-situ, ground-level sketches of key locations along Wears Creek and within the Millbottom area that effectively communicate to the viewer what it would be like to be in the space. Throughout the three to four day on-site charrette, the Contractor shall develop six to eight designs (based on schematics developed in Task 1) for a Wears Creek greenway that includes a bike/ped connection to the Missouri River via an underground tunnel connection beneath the Union Pacific rail tracks currently being planned by the city. Designs should focus on green street improvements and sustainable civic open spaces on current vacant properties and parking lots, so that this area may better serve as an attractive gateway to the State Capitol building in the Millbottom area. Green street improvement designs should work to better manage stormwater through natural systems, as well as improve the pedestrian environment and the aesthetic character of the Millbottom area. The Contractor shall develop civic space, green building, and vacant property redevelopment designs for the Millbottom area. In addition, the Contractor shall prepare designs that seek to transform vacant lots and parking lots into pedestrian scale mixed use developments in order to promote community revitalization and expand opportunities for new and current residents. Concurrent to the design activity EPA, HUD and DOT staff will be having stakeholder meetings with Jefferson City and other groups to discuss policy implications and implementation strategies for the designs that are developed on site. The expected outcomes of these meetings may include but are not limited to options for linking existing greenway plans to the designs created in this charrette, options
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/EPA/OAM/HQ/RFQ-DC-10-00231/listing.html)
 
Record
SN02267886-W 20100905/100903235336-a13b41e2626e4ff8449557ec1c49c768 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.