AWARD
Y -- Vallecito Spillway Bridge
- Notice Date
- 10/6/2010
- Notice Type
- Award Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-2 Rocky Mountain Region, 740 Simms Street, Regional Office, Golden, Colorado, 80401
- ZIP Code
- 80401
- Solicitation Number
- AG-82X9-S-10-0102
- Archive Date
- 10/9/2010
- Point of Contact
- David H. Johnson,
- E-Mail Address
-
davidhjohnson@fs.fed.us
(davidhjohnson@fs.fed.us)
- Small Business Set-Aside
- N/A
- Award Number
- AG-82X9-C-10-0185
- Award Date
- 9/24/2010
- Awardee
- JE Hurley, 4602 Northpark Dr, Colorado Springs, Colorado 80918, United States
- Award Amount
- $1,396,748.00
- Line Number
- Base Only
- Description
- Scope of Work: The work shall consist of what is shown on the plans, stated in the specifications, and summarized below: Road work: • Establish the traffic control signing and barricades at County Road 501 as required. • Coordinate work with affected utility companies. • Perform preliminary grading. • Construct the culverts at Jack Creek and at the future fire station. • Construct embankment and subgrade. • Construct asphalt pavement. • Install permanent traffic control (signing and striping). • Install new fences and gate. • Seeding and final site work. Bridge work: • Excavate for abutments and drilled shafts. • Install the drilled shafts while monitoring vibration at the existing spillway walls. • Construct the abutment beam seats and portions of the wingwalls as shown on the plans. • Construct the temporary pier and footing. • Erect the steel girders. • Place the concrete deck and end diaphragms. • Construct the remaining portions of abutments and wingwalls. • Remove the temporary pier after the deck has reached its design strength. The temporary footing may remain in place. • Install lean concrete backfill. • Construct the approach slabs. • Construct the bridge rails. • Construct the fences on the bridge. • Install the swale and the finish grading at the bridge. Project Location: The project is located approximately 22 miles east of Durango, Colorado at the Vallecito Reservoir in the San Juan National Forest. The work is on a new section of Forest Service Road # 603.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/82X9/Awards/AG-82X9-C-10-0185.html)
- Record
- SN02307399-W 20101008/101006234628-94f3d8a83ade63702dc01ff66ad55de0 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |