Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 02, 2010 FBO #3234
AWARD

Y -- N40083-10-C-0024 P-048 Marine Corps Reserve Center, Joliet, IL

Notice Date
9/30/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N40083 NAVFAC MIDWEST 201 Decatur Avenue Building 1A GREAT LAKES, IL
 
ZIP Code
00000
 
Solicitation Number
N4008310R0024
 
Archive Date
10/15/2010
 
Point of Contact
Terryll Zade, 847-688-2600 extension 417
 
E-Mail Address
Contract Specialist
(terryll.zade@navy.mil)
 
Small Business Set-Aside
Competitive 8(a)
 
Award Number
N40083-10-C-0024
 
Award Date
9/30/2010
 
Awardee
Charpie-Korte JV (DUNS 830485616)<br />
 
Award Amount
$7,245,400.00
 
Line Number
0001
 
Description
It is the intent and objective of the Government to obtain design and construction services including labor, material, transportation, equipment and supervision required to design/build this construction project that will consist of a single structure housing separate parachute drying tower and rappelling tower, boat shop and storage, organic equipment shed as well as a scuba/dive locker and oxygen-free maintenance locker at the Reserve Training Center, Joliet, IL. Built-in equipment includes parachute washing and drying equipment and central mechanical control. Operation and maintenance support information is included in this project. Anti-Terrorism/Force protection (AT/FP) features include window glazing, and other associated construction costs. Electrical utilities include exterior and interior lighting. Mechanical utilities include fire protection water distribution, sewer piping and water distribution. Paving and site improvement includes grading, soil preparation, landscaping, sidewalks, storm drainage and parking lot. Sustainable features will be included in the design, development and construction for the project in accordance with Executive Order 13123 and other laws and executive orders. Construction will also include security lighting and perimeter fencing in accordance with all applicable DOD AT/FP guidance for primary gathering facilities. The period of performance is approximately 12 months after notice to proceed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68950/Awards/N40083-10-C-0024.html)
 
Record
SN02302377-W 20101002/100930234940-9326cba9d2b8678587f272c29a004925 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.