SOURCES SOUGHT
16 -- Hydralic System Auxiliary Pump (Left & Right) Upgrade
- Notice Date
- 12/7/2010
- Notice Type
- Sources Sought
- NAICS
- 333911
— Pump and Pumping Equipment Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Tinker OC-ALC - (Central Contracting), 3001 Staff Drive, Ste 1AG76A, Tinker AFB, Oklahoma, 73145-3015
- ZIP Code
- 73145-3015
- Solicitation Number
- FA8105-HydraulicPump
- Archive Date
- 2/4/2011
- Point of Contact
- Kjulonda L. Ogles, Phone: 4057395405
- E-Mail Address
-
kjulonda.ogles@tinker.af.mil
(kjulonda.ogles@tinker.af.mil)
- Small Business Set-Aside
- N/A
- Description
- REQUEST FOR INFORMATION (RFI) Hydraulic System Auxiliary Pump (Left and Right) Upgrade to KC-135R/T/OC-B (419 aircraft in total). PURPOSE The C/KC-135 Aircraft Sustainment Branch Contracting Office (GKC/PK), Tinker AFB OK, is conducting market research to determine estimated cost of developing and installing a 3 and/or 10.0 GPM Hydraulic System Auxiliary Pump Upgrade(Left and Right) to meet all of the requirements in Table 1. This solution shall address meeting requirements in Table 1 and should not be limited to replacement of both the left and right pumps. The optimal solution would provide an independent onboard method of supplying hydraulic fluid with appropriate pressure and capacity to both the left and right hydraulic systems during ground operations. The hydraulic pump solution should be capable of accepting DC power for the purpose of charging the brake system for aircraft movement. DESCRIPTION The KC-135 R/T/OC-B hydraulic system consists of four engine driven hydraulic pumps (NSN 4320-01-242-5153HS/PN PV3-205-39), one on each engine, that provide 3000 PSI to two separate hydraulic systems at 22.5 gallons per minute (GPM) flow. In addition, there are two auxiliary pumps (NSN 3010-00-5675873RK/PN DO81 (DC Motor), 4320-00-864-8677HS/PN PF24-3906-24ZH4 [Right Pump], NSN 4320-00-768-6345HS/PN 65W01020 [Left Pump]) both rated at 0.76 GPM flow. However, the 0.76 GPM flow from the current auxiliary pumps does not allow sufficient flow to support timely testing of all hydraulic systems. To facilitate ground testing, maintainers are required to run engines/or use the MJ-2A hydraulic test stand and the A/M 32A-86 electric cart. Requiring maintainers to run engines and/or test equipment is time consuming and costly to the Government. Providing an independent onboard method of supplying hydraulic fluid with appropriate pressure and capacity to both the left and right hydraulic systems will require a 3 and/or 10.0GPM pump, and would alleviate the use of hydraulic test stand which would result in a manpower savings, avoid engine runs for pre-flight checks that would resulting in fuel savings, and increase aircraft availability to support the warfighter. The Government is seeking a Government off the shelf or commercial off the shelf solution that provides capability to sustain continuous operation of hydraulic systems on the aircraft without use of engines and hydraulic carts. If these requirements cannot be met, please provide the systems that cannot be supported by the proposed solution. RESPONSE Responses shall address: 1. Developmental schedule (duration from contract award to on aircraft testing completion) 2. Install Schedule using three different contract field team lines 3. Estimated developmental cost (including nonrecurring engineering and technical data) 4. A Kit and B Kit Cost break out 5. Estimated installation cost with installation hours (broken down by system) 6. The components/methods proposed to be replaced or modified 7. The expected reliability maintainability & availability (RMA) improvement of replacement components 8. Mean Time Between Failure (MTBF) 9. Description and rational of proposed system capabilities and operation 10. Details of proposed replacement components/methods to include, but not limited to, items such as electrical, hydraulic power system requirements, airworthiness certifications actions completed, current usage on other systems or in development, logistics support requirements/availability (parts supply, spares, repair, support equipment, tech data, training, pro and cons etc.) 11. Component lead times (longest lead time only for each system is required) 12. Maximum aircraft modified per year 13. One option for a 3 GPM pump and/or a second option for a 10 GPM pump. Table 1. Hydraulic System Requirements Left Side Component Quantity Flow (EA) Rate AR Pump (Fwd) 4 17 gpm Spoilers - Up Actuation (Inboard) 8 0.037 gal/cycle Pilot Brakes 1 3000 PSI Emergency Brakes 1 3000 PSI NLG Swing - Up Actuation 1 0.41 gal/cycle NLG Steering 1 0.2 gal/cycle MLG Swing - Up Actuation 2 1.48 gal/cycle System Leakage 1 0.3 gpm Right Side Component Quantity Flow (EA) Rate AR Pump (Aft) 4 17 gpm Flap Flow Regulator 2 4.2 gpm Leading Edge Flaps - Actuation 8 0.02 gal/cycle Spoilers - Up Actuation (Outboard) 8 0.037 gal/cycle Boom Hoist Motor 1 0.6 gpm Boom Hoist Tension Motor Regulator 1 1.75 gpm Boom Extension Motor 1 7.8 gpm Boom Ruddevator Actuator 2 0.05 gal/cycle Copilots Generator 1 1.8 gpm Rudder - PCU 1 3 gpm Copilot Brakes 1 3000 PSI System Leakage 1 0.3 gpm Interested firms should also include the following in their response: - Company Name and Address - CAGE Code (if available) - Point of Contact - Size of Business (i.e. Large/Small Business, Small Disadvantaged Business, 8 (a) concern, Minority-Owned Business) - U.S. or Foreign Owned Entity Submit response (along with any supporting documentation) directly to: GKC/PK ATTN: Kjulonda Ogles cc: ************ 3001 Staff Dr, STE 2AI 86A Tinker AFB OK 73145-3020 Or, respondents may wish to respond to **********or Kjulonda.Ogles@tinker.af.mil. PLEASE PROVIDE AN ELECTRONIC COPY OF SUBMITTED INFORMATION TO THE POINT OF CONTACT ABOVE NO LATER THAN 45 DAYS FROM RECEIPT OF THIS DOCUMENT. Responses must be received no later than 45 days from receipt of this document. Documents must be formatted to 8.5 x 11" paper with type no smaller than 10 point font. DISCLAIMER This RFI is not an offer. This RFI is issued solely for information and planning purposes and does not constitute a solicitation. All information received in response to this RFI that is marked "Proprietary" will be handled accordingly. Responses to the RFI will not be returned. In accordance with FAR 15.201 (e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associates with responding to this RFI. Questions should be directed to PCO/Contract Specialist via email, or call 405-739-5404 directly. ATTENTION: Contractor must be registered with Central Contractor Registration to be eligible for contact award or payment from any DOD activity. Information on registration and annual confirmation requirements may be obtained via the Internet at http://www.ccr.gov or by calling 1-888-227-2423.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8105-HydraulicPump/listing.html)
- Record
- SN02339692-W 20101209/101207233920-fafbca7154f07eb8c5ef60a498de6ab7 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)