SOLICITATION NOTICE
J -- KC135 power supply module, REPAIR
- Notice Date
- 12/9/2010
- Notice Type
- Presolicitation
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- DEPARTMENT OF THE AIR FORCE; BLDG 3001 SUITE 2AH81A; TINKER AFB;OK; 73145
- ZIP Code
- 73145
- Solicitation Number
- FA8117-11-R-0011
- Response Due
- 1/10/2011
- Point of Contact
- Gary Lindley, Phone 000-000-0000, Fax 000-000-0000, Emailgary.lindley@tinker.af.mil. - Don Wallar, Phone 000-000-, Fax --, Email donald.wallar@tinker.af.mil
- E-Mail Address
-
Gary Lindley
(gary.lindley@tinker.af.mil.)
- Small Business Set-Aside
- N/A
- Description
- Item: 0001 INFORMATIONAL LINE ITEMRepair KC135 power supply module, DATA is Proprietary and ExportControlled Description: contractor to furnish all labor, parts, materials,transportation and incidentals necessary to evaluate and repair one (1)each module, power supply.Supp. Description: Problem: output circuit card causes the outputvoltage to overload and to trip off the output.Quantity: 0.0000 EAApplicable to: KC-135RDestn: SW3211,TINKER AFB,OK,73145-8000. Delivery: *30 Calendar Days *ARO Funded Order or Reparable Assets,Whichever is Later, 3.00 LO Item: 0001AApower supply module Description: contractor to furnish all labor, parts, materials,transportation and incidentals necessary to evaluate and repair one (1)each module, power supply.Supp. Description: Problem: output circuit card causes the outputvoltage to overload and to trip off the output.Best Estimated Qty: 25.0000 EAApplicable to: KC-135RDestn: SW3211,TINKER AFB,OK,73145-8000. Delivery: *30 Calendar Days *ARO Funded Order or Reparable Assets,Whichever is Later, 3.00 LO PR Number(s): FD20301136333Item: 0001ABRepair power supply module Description: contractor to furnish all labor, parts, materials,transportation and incidentals necessary to evaluate and repair one (1)each module, power supply.Supp. Description: Problem: output circuit card causes the outputvoltage to overload and to trip off the output.Best Estimated Qty: 25.0000 EAApplicable to: KC-135RDestn: SW3211,TINKER AFB,OK,73145-8000. Delivery: *30 Calendar Days *ARO Funded Order or Reparable Assets,Whichever is Later, 3.00 LO PR Number(s): FD20301136333Item: 0001ACRepair power supply module Description: contractor to furnish all labor, parts, materials,transportation and incidentals necessary to evaluate and repair one (1)each module, power supply.Supp. Description: Problem: output circuit card causes the outputvoltage to overload and to trip off the output.Best Estimated Qty: 25.0000 EAApplicable to: KC-135RDestn: SW3211,TINKER AFB,OK,73145-8000. Delivery: *30 Calendar Days *ARO Funded Order or Reparable Assets,Whichever is Later, 3.00 LO Item: 0002DATA Description: IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DDFORM 1423 (EXHIBITS A THROUGH C) ATTACHED AND MADE A PART HEREOF.Quantity: 1.0000 LO Plus 0002 additional items Duration of Contract Period: BASIC YEAR AND 2 ONE YEAR OPTIONS Electronic procedure will be used for this solicitation. IAW FAR 5.207(c)(15)(ii), All responsible sources may submit acapability statement, proposal, or quotation, which shall be consideredby the agency
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8117-11-R-0011/listing.html)
- Record
- SN02341229-W 20101211/101209234002-4b245d02cf8eced6dae53c7932a26a2d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |