Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 08, 2011 FBO #3332
MODIFICATION

15 -- Common Vertical Lift Support Platform (CVLSP) - RFI Cost WBS Template

Notice Date
1/6/2011
 
Notice Type
Modification/Amendment
 
Contracting Office
ASC/XRXAttn: Betty W. Clingerman2275 D StreetWright-Patterson AFB, OH 45433-7017
 
ZIP Code
45433-7017
 
Solicitation Number
PIXS6396
 
Archive Date
2/28/2010
 
Point of Contact
Betty W. Clingerman, Phone: 9372558152, Adam L. Bernas, Phone: 9372556349
 
E-Mail Address
betty.clingerman@wpafb.af.mil, adam.bernas@wpafb.af.mil
(betty.clingerman@wpafb.af.mil, adam.bernas@wpafb.af.mil)
 
Small Business Set-Aside
N/A
 
Description
RFI Cost WBS Template Cost & Schedule Data Request 1. Provide/update your response to show cost data that satisfies all the threshold values (previously mentioned as minimum CVLSP values) by an IOC of FY15. Use the attached spreadsheet to populate your response and include associated assumptions. a. Please see the attached Excel spreadsheet titled "RFI Cost WBS template." 2. Provide/update your response to show a schedule in graphical format that satisfies all the threshold values (previously mentioned as minimum CVLSP values) by an IOC of FY15. Address the following milestones and phases as applicable and include associated assumptions. a. Milestones (points in time) to include: Contract Award, MS B - start of Engineering, Manufacturing, and Development (EMD), MS C - start of Low Rate Initial Production (LRIP), Critical Design Review (CDR), production baseline finalized, aircraft deliveries, and Initial Operational Capability (IOC). b. Phases (blocks of time) to include: Engineering, Manufacturing, and Development (EMD), long lead procurement, aircraft production lots, Developmental Testing, Operational Testing, US DoD Live Fire Test and Analysis, initial cadre training, training courseware, training devices, initial spares and support equipment, Operations/Maintenance procedures, modification design/engineering, aircraft post-production modification, initial contractor support (for maintenance), and USAF airworthiness certification. Responses are due no later than 3pm on January 13, 2011 to the Contracting Officer, Betty Clingerman, ASC/WISK, Betty.Clingerman@wpafb.af.mil, 1895 5th Street, bldg. 46, Wright-Patterson AFB, OH 45433-7017.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/ASC/PIXS6396/listing.html)
 
Record
SN02355446-W 20110108/110106234103-febaa24a17fac5c1163c1094e4ffeebe (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.