Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JANUARY 21, 2011 FBO #3345
SOURCES SOUGHT

A -- Directed Energy Viability for Ship Disable Capability - RFI 11-RFI-0003

Notice Date
1/19/2011
 
Notice Type
Sources Sought
 
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
 
Contracting Office
Department of the Navy, Office of Naval Research, ONR, CODE ONR-02, 875 North Randolph St., Suite 1425, Arlington, Virginia, 22203-1995
 
ZIP Code
22203-1995
 
Solicitation Number
11-RFI-0003
 
Archive Date
3/15/2011
 
Point of Contact
Peter A Morrison, Phone: 703-696-0553, Joseph D. Cloft, Phone: 703-696-0989
 
E-Mail Address
morrisp@onr.navy.mil, joesph.cloft@navy.mil
(morrisp@onr.navy.mil, joesph.cloft@navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Request for Information, 11-RFI-0003, entitled 'Directed Energy Viability for Ship Disable Capability,' is posted 19 JAN 11. This Request for Information is intended to seek information relevant to the viability of directed energy systems suitable to operate in the marine environment and capable of disabling a small boat or ship. This announcement constitutes a request for information (RFI) notice for planning purposes. This is NOT a request for proposals (RFP). NO SOLICITATION DOCUMENTS EXIST AT THIS TIME. This RFI does not constitute a commitment, implied or otherwise, that the Office of Naval Research (ONR) will take procurement action in this matter. Further, neither ONR nor the Government will be responsible for any cost incurred in furnishing this information. The Office of Naval Research is conducting an independent study to investigate the viability of directed energy systems suitable to operate in the marine environment and capable of disabling a small boat or ship. This report is intended to provide an independent technical assessment for the viability to disable fast inshore attack craft and provide evaluation and recommendation of most viable solution. This report is not intended to be a technical readiness review nor an Analysis of Alternatives. The intent is to review systems which can be designed, manufactured, tested, and installed on a US Navy ship within 18-24 months from the date of this RFI. As a result, innovative and mature subsystem technologies are needed to meet this timeline and should be at a Technical Readiness Level (TRL 6 or greater).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/ONR/ONR/11-RFI-0003/listing.html)
 
Record
SN02362339-W 20110121/110119234026-23748874370e59266ca043b18e6080ea (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.