Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 18, 2011 FBO #3373
SOURCES SOUGHT

Y -- UT/WY PRA/NPS IMR PRES 1(11)

Notice Date
2/16/2011
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
UT-WY-PRA-NPS-IMR-PRES-1(11)
 
Archive Date
3/11/2011
 
Point of Contact
Craig Holsopple, Phone: 7209633350
 
E-Mail Address
craig.holsopple@fhwa.dot.gov
(craig.holsopple@fhwa.dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED TOTAL HUBZONE OR SERVICE DISABLED VETERAN-OWNED SMALL BUSINESSES TO SET THIS PROJECT ASIDE. (Details Below). Prime Contractors who are HUBZone small businesses or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation MUST submit the following by e-mail to CFLContracts@fhwa.dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (3 p.m. local Denver time) on February 24, 2011: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE; (3) letter from bonding agent stating your firm's capability to bond for a single project of $4.2 million, and your firm's aggregate bonding capacity; and (4) Provide a list of road construction projects involving chip seal, micro surfacing, pavement patching and crack filling. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the Online Representations and Certifications Application (ORCA) located at https://orca.bpn.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS UT/WY PRA/NPS IMR PRES 1(11), Dinosaur, Fossil Butte, Timpanogos National Monuments, and Golden Spike National Historic Site. This project provides pavement preservation of the paved surfaces in Dinosaur National Monument, Fossil Butte National Monument, Timpanogos National Monument and Golden Spike National Historic Site. The project consists of one schedule and three options. Schedule A - Dinosaur National Monument - 51.22 miles (840,247 square yards) of roadways, campgrounds, and Parking Areas. Option X - Fossil Butte National Monument - 3.61 mile (65,541 square yards) of roadways and parking areas. Option Y - Golden Spike National Historic Site - 9,395 square yards of parking areas. Option Z - Timpanogos National Monument - 6,477 square yards of parking areas. The work will include the following Pavement Preservation items: 1) Hot asphalt patching type 2, 2) Crack cleaning and sealing, 3) Single chip seal, 4) Micro-surfacing type 2. 5) Traffic Control 6) Additional items of work included to support these activities. There will be weather Limitations for Surface Treatments - May 1, 2011 to August 31, 2011 It is anticipated that this project will be advertised in mid March, 2011 with construction occurring from late April to early December, 2011. Estimated cost $3.5 to $4.2 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/UT-WY-PRA-NPS-IMR-PRES-1(11)/listing.html)
 
Place of Performance
Address: Various Locations in Wyoming and Utah: Dinosaur National Monument, Fossil Butte National Monument, Timpanogos National Monument and Golden Spike National Historic Site, United States
 
Record
SN02381665-W 20110218/110216234547-79bf5989c9195a7e1174e95b7e0964e0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.