Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 20, 2011 FBO #3375
MODIFICATION

Y -- AMENDMENT 02

Notice Date
2/18/2011
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-11-R-0104
 
Response Due
2/28/2011
 
Archive Date
4/29/2011
 
Point of Contact
Robert M. Duran, (817) 338-8640
 
E-Mail Address
USACE District, Fort Worth
(robert.m.duran2@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT 02 CHANGES ARE INCORPORATED IN THE SOLICITATION IN BOLD BLUE TEXT. CLAUSE REMOVED: 52.219-3 NOTICE OF TOTAL HUBZONE SET-ASIDE (JAN 1999) Page 6 Proposals are due on 28 February 2011, by 2:00 p.m. Central Standard Time. Minimum requirements due is a revised bid Schedule with a signed SF 1442. LATE PROPOSALS WILL BE RECEVIED AND MARKED LATE, DATE AND TIME RECEIVED, ACCEPTING RECEIVER NOTED AND THE PROPOSAL WILL BE RETURNED AFTER IT HAS BEEN LOGGED FOR THE FILE. Electronic submission via email will not be authorized. Page 41 #3 Section 001100, Pricing Schedule/Bid Bonds Page 41 TAB 3: Section 001100, Pricing Schedule is to be completed in its entirety by all Offerors. See Section 001100 with attached notes, for further instructions. Insert Bid Bonds in Tab 3. Page 198 27CONTRACTOR STAFF a. The Contractor shall maintain an engineer staff and may also be required to obtain registered professional services to respond to the requirements set forth in the contract. (Engineering staff are not required to be maintained on site, but all engineers shall be registered professionals to address the requirements by the contract task orders.) Page 210 59PERSONNEL QUALIFICATIONS a. The Government reserves the right to review the resume of Contractor personnel proposed to be assigned to this contract. If the Contracting Officer questions the qualifications or competence of any individual performing under this contract, the burden of proof shall be upon the Contractor. b. The successful Contractor must staff the contract with personnel whose qualifications are equal to or better than those whose resumes were submitted with the proposal. In the event the Contractor decides to utilize personnel in the performance of the resultant contract for which resumes were not submitted at the time of proposal evaluation, the Contractor shall, prior to the utilization of these personnel, submit their resumes to the Contracting Officer or his authorized Representative for approval. (Resumes are not part of Page Count. Keep to minimum and reasonable lengths.) Page 210 f. The Contractor must meet the following personnel qualifications: (1) PROJECT MANAGER (PM) - Serves as a full-time on-site Project Manager (PM). The PM shall, as a minimum, have an Engineering Degree and Professional Registration in a discipline that is compatible with the building construction industry. PM must have a minimum of five years experience in a building construction supervisory position, i.e., project manager and/or construction superintendent. Capability to direct work requiring extensive understanding of/and intimate familiarity with the principles, methods, and techniques of architectural, civil, mechanical, and electrical engineering, with no one discipline predominating. Ability to recruit and manage qualified subcontractors in all construction disciplines from the local market in the Corpus Christi Army Depot area. PM must be able to respond in a timely manner to all contractual agreements, instructions, and inquiries from authorized government personnel. PM must understand and have knowledge of government construction requirements, and the Job Order Contract in total. Must be capable of preparing project proposals, be authorized to negotiate, and accept individual task orders issued under this contract. Another individual meeting the qualifications may be designated to act for the Project Manager; however, the Contracting Officer's Representative must be notified in writing a minimum of forty-eight (48) hours in advance of such change. Notification must include exact duration (not to exceed 15 days) for temporary changes.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-11-R-0104/listing.html)
 
Place of Performance
Address: USACE District, Fort Worth PO Box 17300/819 Taylor Street, Fort Worth TX
Zip Code: 76102-0300
 
Record
SN02383443-W 20110220/110218234022-38b89a31f5f7bdec98145d855ca7b2a6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.