SOLICITATION NOTICE
20 -- Pielstic Repairs
- Notice Date
- 2/22/2011
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 333618
— Other Engine Equipment Manufacturing
- Contracting Office
- Department of the Navy, Military Sealift Command, MSC East - Norfork, Virginia, Bldg 238/2 B Street, Camp Pendleton, Virginia Beach, Virginia, 23451
- ZIP Code
- 23451
- Solicitation Number
- N40442-11-T-7324
- Archive Date
- 3/15/2011
- Point of Contact
- Roy J. Williams, Phone: 757-443-5960
- E-Mail Address
-
roy.williams@navy.mil
(roy.williams@navy.mil)
- Small Business Set-Aside
- N/A
- Description
- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format prescribed in Subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is N40442-11-T-7324, and it is being issued as a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-48, effective 30 DEC 2010. NAICS code 333618 applies. Military Sealift Fleet Support Command (MSFSC), Norfolk, VA intends to award a sole source firm fixed price purchase order for USNS Patuxent to Fairbanks Morse Engine or Motor Services Hugo Stamp as the only OEM authorized repair facilities for the following services: The requested period of performance for the below service is 5-24 August 2011. 1.0 ABSTRACT 1.1 Provide the services of an Original Equipment Manufacturer (OEM) PC4.2 diesel repair shop facility to perform overhaul of four (4) PC4.2 main engine cylinder heads and Liners. 2.0 REFERENCES/ENCLOSURES 2.1 References: 2.1.1 NAVSEA Tech Man T9233-AF-MMC-010, Colt-Pielstick Main Propulsion Diesel Engine. PC 4-2. 2.1.2 S.E.M.T. PIELSTICK Service Bulletin No. 480927, Revision 08; Honing Engine Liners 2.2 Enclosures: None 3.0 ITEM LOCATION/DESCRIPTION 3.1 Engine: Manufacturer: Colt-Pielstick 10-Cylinders Model: PC 4.2V 570 3.2 Cylinder Heads P/N T56915 3.2.1 Quantity: Four (4) cylinder heads including the following major components: 3.2.1.1 Intake Valve Assemblies 3.2.1.2 Exhaust Valve Assemblies 3.2.1.3 Air Start Valves 3.2.1.4 Safety Valves 3.3 Cylinder Liners P/N T014057 3.3.1 Quantity: Four (4) Cylinder Liners 4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: 4.1 Exhaust Valves Qty per / times 8 4.1.1 O-Ring ON66269.70.68 Qty. (1) /8 4.1.2 O-Ring ON65224.35.68 Qty. (4) / 32 4.1.3 Housing, Ring T444763 Qty. (3) / 24 4.1.4 Ring T444764 Qty. (3) / 24 4.1.5 Bushing T317174 Qty. (1) / 8 4.2 Air Start Valve Qty per / times 4 4.2.1 O- Ring ON65212.26.63 Qty. (1) / 4 4.2.2 O- Ring ON65236.53.63 Qty. (1) / 4 4.2.3 O- Ring ON65243.53.63 Qty. (1) / 4 4.2.4 O- Ring ON65242.53.63 Qty. (2) / 8 4.2.5 Ring, Quad OT66532.53.73 Qty. (1) / 4 4.2.6 Pin, roll 4x40 OT23504.040.1 Qty. (1) / 4 4.2.7 Pin, roll 10x14 OT23510.014.1 Qty. (1) / 4 4.3 Safety Valve Qty per / times 4 4.3.1 O-Ring ON65236.53.63 Qty. (1) / 4 4.3.2 O-Ring ON65243.53.63 Qty. (1) / 4 4.3.3 Molykote Paste T99570684102 Qty. (10 oz.) 4.3.4 Ring, joint OT65130.38.4 Qty. (1) / 4 4.3.5 Skim T601700 Qty. (1) / 4 4.3.6 Pin, roll ON23508.035.1 Qty. (1) / 4 5.0 NOTES 5.1 The Government will arrange and provide the delivery and pick up of the cylinder heads and Liners listed in paragraph. 3.0 to/from the contractors repair facility. 5.2 Approximate weight of each cylinder head and cylinder liner is 3,000lbs. 5.3 Performance Period; as stated. 6.0 QUALITY ASSURANCE 6.1 Contractor shall provide the services of an ABS (American Bureau of Shipping) Surveyor to attend, witness, inspect and certify repairs in accordance with applicable rules and regulations of the classification society as they apply to the overhaul of the Main Engine Cylinder Heads/components. 6.2 The Contractor shall submit an as found condition report for each Head and Liner describing the apparent condition of the individual Heads and Liners as delivered to the shop. The Contractor shall identify each Head and Liner using existing serial numbers. 7.0 STATEMENT OF WORK 7.1 Provide the services of an OEM authorized PC4.2 repair shop facility to overhaul four (4) Main Engine Cylinder Liners as described below in accordance with references 2.1.1 and 2.1.2. In addition the OEM authorized repair facility is to perform all main engine cylinder head component cleaning, disassembly, shop inspection, overhaul, repair and reassembly described below in accordance with references 2.1.1 on four (4) complete Main Engine Cylinder Heads. 7.1.1 Provide all labor, material, special tools and equipment to perform the requirements of this specification. 7.2 Contractor shall take all necessary precautions to protect mating surfaces and machined threads. Ensure that all openings are clear and clean of dirt and debris. 7.3 Overhaul of four (4) Main Engine Cylinder heads: 7.3.1 Completely disassemble cylinder heads in accordance with ref. 2.1.1 paragraph 6-56.2c. 7.3.1.1 Exhaust valves, intake valves, air start valves and cylinder head safety relief valves requires removal and overhaul. 7.3.2 Exhaust Valves: 7.3.2.1 Completely disassemble the exhaust valve assemblies in accordance with paragraph 6.59.1 and 6.59.2 of reference 2.1.1. 7.3.2.2 Clean, inspect, recondition and reassemble exhaust valves in accordance with ref 2.1.1, paragraph 6-59.3 using parts specified in paragraph 4.1. 7.3.2.2.1 Check flow rate on the exhaust cages in accordance with ref. 2.1.1 paragraph 6.59.4. 7.3.2.2.2 Hydro and de-scale exhaust valve cages in accordance with ref. 2.1.1 paragraph 6.59.5. 7.3.2.2.3 Recondition exhaust valves in accordance with ref. 2.1.1 paragraph 6.59.6. 7.3.2.2.4 Disassemble, clean, inspect and reassemble rotor cap assemblies. 7.3.2.2.5 The Contractor shall reassemble each Exhaust Valve Assembly in accordance with paragraph 6-59.7 of reference 2.1.1 using parts specified in paragraph 4.1 7.3.2.3 Upon completion of all work submit a report with all test data and measurements from each exhaust valve assembly and a copy of Calibration Certificate for the pressure gauge used to test the valves as required by paragraph 6.59.5 to the MSCREP within three (3) days of shipment. 7.3.2.3.1 Additionally one (1) copy of the report shall be wired to each valve and a second copy shall be placed in resealable waterproof bag securely affixed to the outside of the crate. 7.3.3 Start Air Valves: 7.3.3.1 The Contractor shall disassemble each Air Start Valve Assembly in accordance with paragraph 6-61.2 of reference 2.1.1. 7.3.3.2 The Contractor shall clean, inspect, and recondition each Air Start Valve Assembly in accordance with paragraph 6-61.3 of reference 2.1.1. 7.3.3.2.1 The Contractor shall immediately notify the MSCREP of abnormal valve wear or defects. 7.3.3.2.2 The Contractor shall prepare a written report documenting the following: 7.3.3.2.2.1 Contact area between valve seat and valve face was even and centered on seat following Bluing Procedure. 7.3.3.3 The Contractor shall reassemble each Air Start Valve Assembly in accordance with paragraph 6-61.4 of reference 2.1.1 using parts specified in paragraph 4.2 7.3.4 Safety Valve: 7.3.4.1 The Contractor shall test then disassemble each Safety Valve Assembly in accordance with paragraph 6-62.2 of reference 2.1.1. 7.3.4.1.1 The Contractor shall record the pressures at which each Safety Valve opens and closes when tested in accordance with paragraph 6-62.2.b.(4) of reference 2.1.1. 7.3.4.2 The Contractor shall clean, inspect, and recondition each Safety Valve Assembly in accordance with paragraph 6-62.3 of reference 2.1.1. 7.3.4.2.1 The Contractor shall immediately notify the MSCREP of abnormal valve wear or defects. 7.3.4.3 The Contractor shall reassemble and test each Safety Valve Assembly in accordance with paragraph 6-62.4 of reference 2.1.1 using parts specified in paragraph 4.3. 7.3.4.3.1 The Contractor shall record the pressures at which each Safety Valve opens and closes when tested in accordance with paragraph 6-62.4.h. (4) of reference 2.1.1. 7.3.4.3.2 The Contractor shall adjust the valve opening pressure as required to meet the requirements of paragraph 6-62.4.h.(4) of reference 2.1.1 by changing the thickness of the shim. Following adjustment, the valve shall be retested and the test pressures recorded. If the opening pressure cannot be properly adjusted, the MSCREP shall be notified. 7.3.4.4 Upon completion of all work submit a report with all test data and measurements from each valves and a copy of Calibration Certificate for the pressure gauge used to test the valves as required by paragraph 6-62.4.b.(4) 6-62.4.h.(4) of reference 2.1.1 to the MSCREP within three (3) days of shipment. 7.3.5 Intake Valves: 7.3.5.1 Remove and disassemble intake valves in accordance with ref 2.1.1 paragraphs 6-60.1 and 6-60.2. 7.3.5.2 Clean and inspect the intake valves springs and guide bushings and record dimensions in accordance with ref 2.1.1 paragraph 6-60.3. Notify the MSCREP if any parts are found outside of limits and will require replacement. 7.3.6 Conduct a thorough inspection of the cylinder heads in accordance with paragraph 6-56.3 and accomplish de-scaling in accordance with ref 2.1.1 paragraph 6-56.3 a through h. 7.3.6.1 Repeat the de-scaling process a maximum of two (2) times. If additional de-scaling is required submit a report to the MSCREP. 7.3.7 Inspect and repair the gasket seating surfaces of the cylinder head in accordance with ref 2.1.1 paragraph 6-56.3i and 6-56.5. 7.3.7.1 Inspect and clean the seating surfaces for the air safety and starting air valves in accordance with ref 2.1.1 paragraphs 6-61.3 and 6-62.3. 7.3.8 Conduct hydrostatic test of cylinder head in accordance with ref 2.1.1 paragraph 6-56.4a through f. 7.3.8.1 Submit a report of the hydrostatic test results to the MSCREP. 7.3.9 Conduct dye penetrate test of the cylinder heads in way of the exhaust valves, intake valves and fuel injector landing areas. 7.3.10 Recondition the intake valves in accordance with ref 2.1.1 paragraph 6-60.4a through f. 7.3.10.1 Take and record all measurements as required. 7.3.10.1.1 Submit a report to the MSCREP. 7.3.10.2 Remove existing and replace with new, intake valve seat inserts in accordance with ref. 2.1.1, paragraph 6-60.4, two (2) required per cylinder head. 7.3.10.2.1 After installing intake valves inserts and final machining, the contractor shall insure that inserts have a proper seating surface. 7.3.11 Reassemble the intake valve assemblies in accordance with ref 2.1.1 paragraph 6-60.6 using the below listed parts are for each valve. Contractor furnished material. Part Number Description Quantity / Total OT 65240.53.63 "O" Ring One (1) / 8 T447181 Bushing guide none T319472 Inlet Valve Seat Insert One (1) / 8 7.3.12 Reassemble the cylinder head installing all covers and plugs utilizing new gaskets and "O" rings. Below listed parts are for each head assembly: Contractor Furnished parts Part Number Description Quantity / Total T400149 Gasket Five (5) / 20 P400153N Gasket Four (4) / 16 T425652 Gasket Five (5) / 20 T433291 Gasket One (1) / 4 ON06018.10.05 Plug One (1) / 4 ON65118.24.40 Gasket round One (1) /4 ON65145.55.40 Gasket Eight (8) / 32 OT65109.14.40 Gasket Round 9x1 Seven (7) / 28 7.3.13 Reassemble overhauled exhaust, safety and air-start valves on cylinder heads. Ready to install cylinder heads. 7.3.14 Prep and paint the exterior of the cylinder head and preserve all exposed metal parts the cylinder head and associated components. Provide two (2) copies of all documentation including ABS inspection report and quality assurance documentation. One copy shall be placed in a resealable waterproof bag and wired to the cylinder head inside the crate and a second copy placed in a resealable waterproof bag outside the crate. 7.3.14.1 Provide the originals of all above documentation to the MSCREP. 7.3.15 Re-Crate each cylinder head assembly to ensure no damage during shipping and handling. 7.3.15.1 Crate shall be capable of being lifted by a pallet jack. Intent is to reuse the crate in which the Head was delivered. 7.3.15.2 The outside of the crate shall be stenciled with the following information: USNS PATUXENT PC4.2 Cylinder Head Contract Number 40442-11-C-XXXX Date of Overhaul XX/XX/11 7.4 Overhaul of four (4) Main Engine Cylinder Liners: 7.4.1 Contractor is to Refurbish (i.e chemically clean/de-scale, hone and repair O-ring grove as necessary) the cylinder liners listed in paragraph 3.0. 7.4.1.1 Honing of the cylinders is to be accomplished in accordance with reference 2.1.2. 7.4.1.2 Particular attention should be paid to the area of the liner in way of the cooling ports during inspection of the liners. 7.4.2 Preserve the cylinder liners. Provide two (2) copies of all documentation including ABS inspection report and quality assurance documentation. One copy shall be placed in a resealable waterproof bag and wired to the cylinder liner inside the crate and a second copy placed in a resealable waterproof bag outside the crate. 7.4.2.1 Provide the originals of all above documentation to the MSCREP. 7.4.3 Re-crate each cylinder liner assembly to ensure no damage during shipping and handling. 7.4.3.1 Crate shall be capable of being lifted by a pallet jack. Intent is to reuse the crate in which the Liner was delivered. 7.4.3.2 The outside of the crate shall be stenciled with the following information: USNS PATUXENT PC4.2 Cylinder Liner Contract Number 40442-11-C-XXXX Date of Overhaul XX/XX/11 7.5 Preparation of Drawings. None. 7.6 Manufacturer's Rep: None 8.0 GENERAL REQUIREMENTS: 8.1 None additional. The following FAR and DFAR provisions and clauses apply to this solicitation and are incorporated by reference: 52.204-7 Central Contractor Registration; 52.212-1 Instructions to Offerors-Commercial Items; 52.212-3 Alt I Offeror Representations and Certifications - Commercial Items (Offerors are advised to include a completed copy of this provision with their quote or a statement stating that it is available via the ORCA website, http://orca.bpn.gov.) 52.212-4 Contract Terms and Conditions-Commercial Items; 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.219-28 Post-Award Small Business Program Representation. 52.222-3 Convict Labor, 52.222-19 Child Labor - Cooperation with Authorities and Remedies, 52.222-21 Prohibition of Segregated Facilities, 52.222-26 Equal Opportunity, 52.222-35 Equal Opportunity for Disabled Veterans (over 100K) 52.222-36 Affirmative Action for Workers with Disabilities, (Over 15K) 52.222-37 Employment Reports on Special Disabled Veterans (When 52.222-35 Applies) 52.223-18 Contractor Policy to Ban Text Messaging While Driving 52.225-13 Restrictions on Certain Foreign Purchases, and 52.232-33 Payment by Electronic Funds Transfer --Central Contractor Registration 52.222-41 Service Contract Act 52.215-5 Facsimile Proposals: (757) 443-5982 52.232-18 Availability of Funds (only used with an unapproved budget, not standard) 252.204-7004 Required Central Contractor Registration. Alternate A; 252.212-7001 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Application to Defense Acquisition of Commercial Items 252.225-7000 Buy American Act--Balance of Payments Program Certificate, 252.232-7003 Electronic Submission of Payment Requests; and 252.247-7023 Transportation of Supplies by Sea Alternate III. 52.252-2 Clauses Incorporated by Reference This contract incorporates one or more clauses by reference with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause my be accessed electronically at this/these address(es): http://www.arnet.gov/far Responsible sources shall provide the following: 1. Price quote which identifies the requested item(s), unit price, and extended price 2. Total price 3. Prompt Payment Terms 4. Remittance address, Tax Identification Number, DUNS number and Cage Code 5. Responses to this solicitation are due 28 February 2011 at 0800 local time, Norfolk, VA. LATE QUOTES MAY NOT BE CONSIDERED FOR EVALUATION. Quotes may be emailed to Roy.Williams@navy.mil or faxed via 757-443-5982 Attn: Roy Williams. Please reference the solicitation number on your quote. BASIS FOR AWARD: Award will be made to the responsible, technically acceptable quoter, whose quote, conforming to the combined Synopsis/Solicitation, offers the lowest evaluated price.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/MSC/N322051/N40442-11-T-7324/listing.html)
- Record
- SN02384885-W 20110224/110222234302-c9789d185da73ea0dd58188d42a13331 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |