SPECIAL NOTICE
A -- Command and Control System – Consolidated (CCS-C) Block II
- Notice Date
- 3/22/2011
- Notice Type
- Special Notice
- NAICS
- 541712
— Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
- Contracting Office
- Department of the Air Force, Air Force Space Command, SMC - Space and Missile Systems Center, 483 North Aviation Blvd, El Segundo, California, 90245-2808
- ZIP Code
- 90245-2808
- Solicitation Number
- CCS_C_RFP_DELAY_V2
- Point of Contact
- Brandon W. Stock, Phone: 3106539583, Maria E Jimenez, Phone: 310-653-9483
- E-Mail Address
-
brandon.stock@losangeles.af.mil, maria.jimenez@losangeles.af.mil
(brandon.stock@losangeles.af.mil, maria.jimenez@losangeles.af.mil)
- Small Business Set-Aside
- N/A
- Description
- Command and Control System - Consolidated (CCS-C) Block II Special Notice - Request for Proposal (RFP) Release Delayed General Information Contracting Office Address Department of the Air Force, Air Force Space Command, SMC - Space and Missile Systems Center, SMC/PKJ, 483 N. Aviation Blvd., Suite 2133-A8, El Segundo, CA, 90245-2808 Contracting Officer Maria Jimenez, SMC/PKJ, (310) 653-9483 Description Classification Code: A - Research and Development NAICS Code: 541712 (1000 employees) -- Research and Development in the Physical, Engineering, and Life Sciences A Command and Control System - Consolidated (CCS-C) Block II Request for Proposal (RFP) will not be released in the 1st quarter of FY12 as previously advertised. CCS-C Block II acquisition activities have been delayed. An RFP for a competitive CCS-C contract is expected to be released in the 2nd quarter of FY12 (@Jan 2012). A draft RFP release and at least one Industry Day are anticipated to occur prior to the final solicitation release. The Space and Missile Systems Center (SMC) MILSATCOM Systems Directorate (SMC/MC), CCS-C Program Office has modified the existing CCS-C contract, F04701-01-C-0012, to add two 12-month sustainment option CLINs under the authority of Federal Acquisition Regulation (FAR) Part 6.302-1(a)(2). The option CLIN for CY 2011 sustainment has been exercised. If exercised, the second sustainment CLIN will extend the current contract up to one year with a period of performance from 1 January 2012 through 31 December 2012. The modification for continued CCS-C sustainment support will be issued to the incumbent contractor, Integral Systems Inc., 5000 Philadelphia Way Lanham MD 20706-4419. The CCS-C Block II Acquisition Strategy has been neither finalized nor approved. This notice is for information and planning purposes only and does not constitute a commitment by the Government in any way. The Government will not pay for any effort expended in responding to this or previous requests or announcements. If you have any questions, please contact the Procurement Contracting Officer, Ms. Maria Jimenez, at (310) 653-9483 or via email at maria.jimenez@losangeles.af.mil, or the Contract Negotiator, Capt Brandon Stock, at (310) 653-9583 or via email at brandon.stock@losangeles.af.mil.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFSC/SMCSMSC/CCS_C_RFP_DELAY_V2/listing.html)
- Record
- SN02406015-W 20110324/110322234040-3b7df2fd5d2b154cb61579c92fa90785 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |