Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 24, 2011 FBO #3407
SOURCES SOUGHT

J -- Purchase, deliver, install, and test X-Ray Linear Accelerator/M9 Linatron Scope

Notice Date
3/22/2011
 
Notice Type
Sources Sought
 
NAICS
811219 — Other Electronic and Precision Equipment Repair and Maintenance
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, OO-ALC/PKO, 6038 Aspen Ave. B1289NE, Hill AFB, Utah, 84056-5805, United States
 
ZIP Code
84056-5805
 
Solicitation Number
FA8224-11-R-XRAY
 
Archive Date
4/16/2011
 
Point of Contact
James Jaramillo, Phone: 8015863941, Marjorie Forte, Phone: (801) 777-8756
 
E-Mail Address
james.jaramillo@hill.af.mil, marjorie.forte@hill.af.mil
(james.jaramillo@hill.af.mil, marjorie.forte@hill.af.mil)
 
Small Business Set-Aside
N/A
 
Description
PURCHASE SPECIFICATION: X-Ray Linear Accelerator/M-9 Linatron Scope Date: 14 March 2010 1. Scope: This specification is for the purchase of one (1) modular X-Ray Linear Accelerator to replace the obsolete L-2000 X-Ray Accelerator. Must have similar footprint and X-Ray spot size. 2. Requirements: a. Nominal energy 9 MeV with dual energies at 6 MeV and 5 MeV b. X-Ray Dose Rate of 30.0 Gy/min minimum@ 1 m at 9MV, 10 Gy/min minimum @ 1 m at 6 MeV, and 6 Gy/min minimum @ 1 m at 5 MeV c. X-Ray Half Value Layer of 1.20 minimum at 9 Mev, 1.10 minimum at 6 MeV, and 1.06 minimum at 5 Mev d. X-Ray beam Flatness ≥ 55.0% @ 7.5 ° at 9 Mev, ≥ 62.0% @ 7.5 ° at 6 Mev, ≥ 65.5% @ 7.5 ° at 9 Mev e. X-Ray Field size of 30 ° cone beam f. X-Ray spot size of 1.0 mm to 1.5 mm g. X-Ray beam symmetry not to exceed 5% at ± 7.5 ° off beam centerline. h. Leakage fraction of 2 X 〖10〗^(-5) i. Radiographic Quality minimum of ASTM E 94 1-2T sensitivity over 76 mm to 381 mm. j. Compact RF Unit 2400 lbs k. Center of gravity must be within ±5.0 inches of L-200 center of gravity l. Modulator/power distribution Cabinet with programmable logic controller, external signal interface m. Desktop PC control console n. Temperature control unit must keep system components at a nominal 30° C o. Temperature control unit spare parts kit p. Custom length interconnecting cable and hoses q. Remote customer interface with signal monitoring which includes external trigger, emergency off, remote interlock, warning lights, warning alarm, X-ray on request, warm up and power on status, fault information and reset r. Two sets of operator, maintenance and repair, parts and data books (CD) s. Installation supervision and start up assistance t. Warranty u. Voltage Regulator, CE and UL approved v. Internally mounted single spot laser alignment w. Manipulator, motorized with tilt, rotation and 9 push button controls 3. Plates: Markings on the plates shall be permanent and legible on a contrasting non-glare background 3.1. Lubrications or operator services 3.2. Nameplate: a corrosion-resistant nameplate shall be securely attached to the equipment. Name of equipment Manufacturer's name Manufacture's serial number 4. Documentation requirements: 4.1 The contractor shall supply and deliver two (2) copies each of the Operator manual, Maintenance/Repair manual and data manuals. The manuals shall be provided in both electronic (PDF) on CD-Rom and printed format. The technical manual shall contain all of the following information. a. General description of the equipment b. List and description of special tooling/fixtures c. List of hazards and warnings as applicable d. Diagrams of all necessary hose/cable routings and connections e. Electrical wiring diagrams f. Mechanical system schematics/diagrams. g. Parts list ( including list of vendors and part numbers) for all components shown on system diagrams h. List of recommended spare parts i. Step by step operator instructions j. Preventative maintenance schedule and lubrication instructions k. Trouble shooting techniques l. Cable drawings (including connector type, wire gage, shielding etc m. Detailed calibration instruction and procedures n. Tolerance requirements o. List of required calibration equipment 4.2 All documentation shall be provided in English. 4.3 American standard units of measure shall be used in all written documentation 5. Installation 5.1. The X-Ray linear accelerator will be delivered to building 2113, Hill AFB UT 84056. 5.2. The contractor will ship, off-load, install and test the machine at its final location. The machine shall remain the property of the contractor until it is accepted by the Government at Hill AFB. 5.3 All costs associated with the manufacture, shipping, installation, testing and preparation of the equipment for final acceptance at Hill AFB shall be the responsibility of the contractor. 5.4. The contractor shall be responsible to furnish all tools and equipment required to install the equipment and perform the acceptance test. a. Contract start up b. Tailored system requirements review or equivalent c. Tailored preliminary design review or equivalent d. Tailored design review or equivalent e. Tailored test readiness review or equivalent f. Factory acceptance test g. Final acceptance
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/75/FA8224-11-R-XRAY/listing.html)
 
Place of Performance
Address: Building 2113, Hill AFB, Utah, 84056, United States
Zip Code: 84056
 
Record
SN02406641-W 20110324/110322234623-84c91c67450a7513a419c5e7a772f1e3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.