Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 16, 2011 FBO #3430
SOLICITATION NOTICE

Y -- WY PFH 26-1(2), Sage Creek Road, Medicine Bow National Forest, Carbon County, Wyoming

Notice Date
4/14/2011
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-B-00009
 
Archive Date
12/30/2011
 
Point of Contact
Lori T. Kliethermes, Phone: 7209633090
 
E-Mail Address
lori.kliethermes@dot.gov
(lori.kliethermes@dot.gov)
 
Small Business Set-Aside
HUBZone
 
Description
THIS PROCUREMENT IS RESTRICTED TO SBA HUBZONE CERTIFIED SMALL BUSINESS CONCERNS (SBCs). BIDS WILL ONLY BE ACCEPTED FROM SBA CERTIFIED HUBZONE SBCs. PROJECT DETAILS: Sage Creek Road (State Highway 71, County Road 401, Forest Highway 26) begins in Rawlins Wyoming and proceeds South for approximately 53.4 miles where it intersects Wyoming State Highway 70. The project begins at approximate Milepost 9.5 and terminates at approximate Milepost 37 (the entrance to High Savory Dam). The project is located in elevation reaching 8100 feet with an anticipated construction season of 5-6 months per year. The work associated with this project consists of grading, drainage, aggregate surfacing, and incidental roadway improvements, predominantly along the existing alignment. The Base Schedule A begins at Milepost 9.5 and terminates at Milepost 23.5. Principal work items for the Base Schedule A include: 174,000 cy of roadway excavation, 116,000 ton of aggregate surface course, 18 concrete headwalls, 110 lf of 10' x 10' reinforced concrete box culvert, 1240 lf of pipe culvert ranging in size from 18-inch to 84-inch diameter, 1,500 cy of riprap, 36,000 lf of barb wire fence, two-36-foot cattleguards, 260,000 sqyd of placing conserved topsoil-3 inch depth, along with associated traffic control and equipment/flagging, soil erosion control, and survey and staking. There are two optional schedules: (1) Option X - grade, drain, and aggregate surfacing of 2.58 miles of roadway predominately along the existing alignment extending schedule A to the South; (2) Option Y - grade, drain, and aggregate surfacing of 6.40 miles of roadway predominately along the existing alignment extending Sage Creek road South from the end of Option X. Principal work items on Option X include: 12,500cy of roadway excavation, 22,000 ton of aggregate surface course, 5,600 lf of barb wire fence, 33,000 sqyd of placing conserved topsoil-3 inch depth, along with associated traffic control and equipment/flagging, soil erosion control, and survey and staking. Principal work items on Option Y include: 44,000 cy of roadway excavation, 55,500 ton of aggregate surface course, 18 concrete headwalls, 110 lf of 10' x 10' reinforced concrete box culvert, 556 lf of pipe culvert ranging in size from 18-inch to 36-inch diameter, 1,500 cy of riprap, 12,000 lf of barb wire fence, one-36-foot cattleguards, 75,000 sqyd of placing conserved topsoil-3 inch depth, along with associated traffic control and equipment/flagging, soil erosion control, and survey and staking. Tentative advertisement date is April 28 with construction beginning in late July, 2011 and extending up to two construction seasons. Estimated cost for the base schedule and both options is $7.0 to $13.5 million PLEASE NOTE: The Invitation for Bid will be available for download on or after April 28 from the Federal Business Opportunities (FBO) website at www.fedbizopps.gov. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm under the Project Name. Other information regarding this solicitation will also be available at the above website. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@dot.gov or FAX to (720) 963-3360. The Q&A for this project will be posted on the above CFL website as they occur. This solicitation is subject to FAR clause 52.225-11 (Buy American Act-Construction Materials under Trade Agreements, for Construction, therefore; one or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-B-00009/listing.html)
 
Place of Performance
Address: USDA Forest Service, Medicine Bow National Forest, 2468 Jackson Street, Laramie, Wyoming, 82070, United States
Zip Code: 82070
 
Record
SN02424612-W 20110416/110414234317-a7b0f6f0a81958e735323f84da23055b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.