Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 17, 2011 FBO #3431
SOLICITATION NOTICE

J -- The Contractor will provide all management , plant, labor ,materials, and transportation necessary to keep all doors operating safely and continuously.

Notice Date
4/15/2011
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
332321 — Metal Window and Door Manufacturing
 
Contracting Office
157 MSG/MSC Contracting Office, 302 Newmarket ST Bldg 145, PEASE ANGB, NH 03803-0157
 
ZIP Code
03803-0157
 
Solicitation Number
F8N3CE1087A001
 
Response Due
5/10/2011
 
Archive Date
7/9/2011
 
Point of Contact
Catherine Keenan, 603-227-5056
 
E-Mail Address
157 MSG/MSC Contracting Office
(catherine.keenan2@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This Solicitation number F8N3CE1087A001 is issused as a Request for Quote(RFQ) The associated NAICS code is 332321 - Metal Windows and Door Manufacturing, small business size standard 500 employees. The governments intends to Award One (1) Base year with Two(2)Option Year Contract. Information concerning FAR clauses can be obtained at http//farsite.hill.af.mil. The date and time that quote offers are due by is: 11:00 AM EST on 10 MAY 2011 to catherine.keenan2@us.army.mil or scott.ballweg@us.army.mil. Please contact scott.ballweg@us.army.mil to schedule site visit. 1.SCOPE OF WORK. Pease ANGB owns a combination of approximately 96 overhead and roll-up doors. A maintenance program is necessary to maintain the doors in good working order to prevent mission delays and to protect personal from severe accidents or even death from doors not maintained. The average age of the overhead doors is 23 years, however many doors are as old as 54 years. The description of work is an industry standard with the intent to keep overhead doors dependable and safe. 2.LOCATIONS AND INVENTORY OF DOORS. Location of the work is within the cantonment area to the Pease Air National Guard Base. 2.1Bldg. 149 Mobility Bag Storage 2 Overhead Doors 2.2Bldg. 151 State Main/Mobility/P Pro 4 Overhead Doors 2.3Bldg. 152 DRMO 1 Overhead Doors 2.4Bldg. 145 Civil Engineering 4 Roll-up Doors 2.5Bldg. 156 Flight Simulator 2 Overhead Door 2.6Bldg. 157 Vehicle Maintenance 9 Overhead Doors and 2 Roll-up Doors 2.7Bldg. 167 Fuels 1 Overhead Door 2.8Bldg. 169 Fuels 1 Overhead Door 2.9Bldg. 170 1 Overhead Door. 2.10Bldg. 244 Security/Avionics 3 Overhead Doors. 2.11Bldg. 245 Readiness 1 Overhead Doors. 2.12Bldg. 247 Air Traffic Control 2 Overhead Doors. 2.13Bldg. 249 AGE 10 Overhead Doors. 2.14Bldg. 251 Hangar 5 Overhead Doors. 2.15Bldg. 252 Hangar 2 Overhead Doors. 2.16Bldg. 253 Hangar 7 Overhead Doors. 2.17Bldg. 254 Hangar 7 Overhead Doors and 2 roll-up Doors. 2.18Bldg. 256 Life Support 2 Overhead Doors. 2.19Bldg. 258 Hazmat 5 Overhead Doors. 2.20Bldg. 243 Fire Station 12 Overhead Doors. 2.21Bldg. 262 Supply 4 Overhead Doors 3.DESCRIPTION OF WORK. Perform the following checks, and maintenance to Overhead Panel and Roll-up Doors. Results of each door shall be recorded on Government supplied Maintenance Inspection Reports or a contractors equivalent form. The work description is further explained in this section. Prepare a cost estimate based on the Inspection Report findings to repair, replace, align, and all which appertains to the doors to bring back into safe serviceable conditions. Not all repairs can be made upon discovery because of parts and time constraints, however make repairs and adjustments immediately if possible. When a door is found in an unsafe condition follow directions in Item 3.1.1 below. All work to include the following but not limited to: 3.1Overhead Doors - Perform the following Checks and Maintenance. 3.1.1Immediately let the State Technician assigned to this job know of an unsafe door. The State Technician will contact Civil Engineering Operations and make provisions to Lockout/Tagout the door. Estimate cost and labor to make repairs and coordinate with the Contracting Officer. 3.1.2Keep rails, guides, springs, and rollers secure and free from dust, dirt, corrosion, and obstruction. 3.1.3Lubricate according to manufacturer's recommendations on upper rails and rollers. Lower rails should not require lubrication. 3.1.4Check alignment of rollers and rails. Centering of wheels between door/track is between 1 " and 2 ". Realign when necessary. 3.1.5Check and replace worn wheel bearings. 3.1.6Check guides for security and alignment. Guides should be aligned straight up and down with smooth transition to the next guide attached: Guides should all be fastened to wall and rails securely by bolts or welds. Correct guide alignment and refasten system to walls if the previous conditions exist. 3.1.7Check steel counter balance lift cables making sure they are securely attached to bottom of door. Refasten lift cables if not attached securely to door bottom. 3.1.8Check for wear and damage to steel counter balance lift cables by indications of fraying of the wire strands or breakage. Replace worn cables. 3.1.9Inspect and lubricate operator motor according to manufacturer's recommendations. 3.1.10Check alignment of door operator with door drive gears and chain. Realign operator with door gears if they do not line up. 3.1.11Check solenoid brake for proper operation. Adjust or replace solenoid if not operating correctly. 3.1.12Check friction clutch for proper operation. Adjust or replace clutch if not operating correctly. 3.1.13Check hinges for breakage, pivot wear, and tightness against the door panels. Replace hinges if worn and secure any loose hinges to doors. 3.1.14Check drive sprocket, control unit set-screws and tighten any loose set-screws. 3.1.15Check opener cams for loose set screws and tighten any loose set-screws. 3.1.16Check cable drums and tighten any loose set-screws and cotter keys. 3.1.17Check cables running in drum threads and realign if necessary. 3.1.18Check counter balance springs for wear and oil springs with Garage Door Lubricant, #GD-12208 or equal. Replace worn springs. 3.1.19Check manual chain hoist including throw-out arm. Adjust or repair if not working correctly. 3.1.20Check emergency stop mechanisms for proper operation, wear, and damage. Includes electronic and air operated systems. Repair inoperative mechanisms. 3.1.21Check electric door operator button/switches for proper operation. Most operator switches have Open, Stop, and Close modes. Replace switches which do not operate correctly. 3.1.22Check for bent or warped panels. Replace defective panels. 3.2 Roll-up Doors Next Page 3.2Roll-up Doors - Perform the following checks, and maintenance. 3.2.1Keep guides secure and free from dust, dirt, corrosion, and obstruction. 3.2.2Lubricate according to manufacturer's recommendations on rails. 3.2.3Check rails for security and alignment. Realign and fasten rails to wall if necessary. 3.2.4Inspect and lubricate motors as recommended by manufacturer. 3.2.5Lubricate inner counter balance spring. 3.2.6Check alignment of motor with drive gears or chain and smoothness of operation. Lubricate as needed. Realign motor with gears or chain if out of alignment. 3.2.7Check door for warping or displacement of sliding panels. Replace defective panels. 3.2.8Check door edges for fraying and also scrapping where they contact the guides. Correct conditions causing the scrapping. 3.2.9Check door safety strips for visual damage and check for proper operation. Check emergency stop mechanisms for proper operation, wear, and damage. Includes electronic and air operated systems. Repair safety strips if worn or not working. 3.2.10Check manual chain hoist for proper operation. Repair hoist if not operating properly. 3.2.11Check electric door operator buttons/switches for proper operation. Most operator switches have Open, Stop, and Close modes. Replace defective switches. 4.GOVERNMENT SUPPLIED. The Government will supply the following to the maintenance contract. 4.1Two man lift. 4.2Maintenance Mechanic to assist in the coordination and operation of lift. 4.3Inspection and Maintenance records. 5.COMPLETION OF WORK. Once work is completed as stated in number 3 the following will be provided to the government: 5.1Inspection reports shall be turned over to the Government. 5.1.1Reports shall contain data of original findings on each door and actions taken to correct all deficiencies. 5.2Doors shall be in safe serviceable condition when completed. 6.GOVERNMENT SUPPLIED RESOURCES. The Government will supply the following to the maintenance contract. 6.1Two man lift. 6.2Maintenance Mechanic to assist in coordinating work, escorting, and operation of lift. 7.SPECIAL PROVISIONS. 7.1The Contractor covenants to comply with all applicable State and Federal laws, rules, and regulations including, but not limited to those pertaining to non-discrimination, lobbying, drug free work place and the use of United States flagship. 7.2Between the effective date and date five(5) years after the completion date, at any time during the Contractor's normal business hours and as often as the Federal Government shall demand, the Contractor shall make available to the government or duly authorized agents of the Department of the Army and Air Force (National Guard Bureau) or the comptroller General of the /United States, all records pertaining to this agreement, to audit, examine and reproduce such records, and to make audits of all contracts, invoices, materials, payrolls, records of personnel, data (at that term is herein defined), and other information relating to all matters covered in this agreement. Clauses may be accessed electronically in full text through http://farsite.hill.af.mil. Contractors must be actively registered with the Central Contractor Registration (CCR) at http://www.ccr.gov, at Wide Area Work Flow (WAWF) at http://wawf.eb.mil, and at Online Representations and Certifications Application (ORCA) at http://orca.bpn.gov. FAR 52.204-7. Central Contractor Registration. ), FAR 52.212-1, Instructions to Offerors-Commercial Items, FAR 52.212-2 Evaluation-Commercial Items Evaluation. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, price, technically acceptability. This is a best value decision. FAR 52.212-3, Offerors Representation and Certifications Commercial Item or complete electronic annual representations and certifications at http//orca.bpn.gov., FAR 52.212-4 Contract Terms and Condition-Commercial Items; FAR 52.212-5 (DEV) Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Item are incorporated by reference, however, for paragraphs (b) and (c) the following clauses apply. FAR 52.219-6, Notice of Total Small Business Set-Aside (if applicable), FAR 52.219-28, Post Award Small Business Representation (if applicable, FAR 52.222-21 -Prohibition Of Segregated Facilities; FAR 52.222-26 Equal Opportunity; FAR 52.222-35- Affirmative Action for Disabled Veterans and Veterans of the Vietnam Era; FAR 52.222-36 Affirmative Action for Workers With Disabilities; FAR 52.222-37 -Employment Reports On Disabled Veterans And Veterans Of The Vietnam Era; FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (Services Only) FAR 52.222-50 Combating Trafficking in Persons; FAR 52.222-99 (DEV), Notification of Employee Rights under the National labor Relations Act, (Only if over $100K) FAR 52.225-13, Restrictions on Certain Foreign Purchases, FAR 52.232-33 -Payment by Electronic Funds Transfer--Central Contractor Registration; FAR 52.232-36, Payment by Third Party; DFARS 252.204-7004 -Required Central Contractor Registration (CCR); Contractors not registered in the CCR will be ineligible for award (register at http://www.ccr.gov/, DFARS 252.212-7000, Offeror Representations and Certifications - DFARS 252.225-7000, Buy American Act (BAA) - Balance of Payments Program Certificate (when applicable) DFARS 252-225.7001, BAA - Balance of Payments Program (when applicable) DFARS 252.232-7003, Electronic Submission of Payment Requests (WAWF instructions provided at time of award) DFARS 252.246-7000, Material Inspection And Receiving Report DFARS 252.247-7023, Transportation of Supplies by Sea, Alternate III
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA27-1/F8N3CE1087A001/listing.html)
 
Place of Performance
Address: 157 MSG/MSC Contracting Office 302 Newmarket ST Bldg 145, PEASE ANGB NH
Zip Code: 03803-0157
 
Record
SN02425609-W 20110417/110415234049-cda756925840aa9b5b1d5257f6b5e8e2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.