SOLICITATION NOTICE
Z -- KOOTENAI NF, Big 8 Mine Road Decommissioning
- Notice Date
- 4/15/2011
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
- ZIP Code
- 83815-8363
- Solicitation Number
- AG-02RC-S-11-0054
- Point of Contact
- Rita J. Loper, Phone: 2087657497
- E-Mail Address
-
rloper@fs.fed.us
(rloper@fs.fed.us)
- Small Business Set-Aside
- HUBZone
- Description
- This is a Pre-Solicitation Notice for Big 8 Mine Road Decommissioning on the Kootenai NF, Three Rivers Ranger District. This is a watershed improvement project intended to reduce existing and potential road related sediment sources to Callahan Creek and several tributaries. Work includes clearing roads of brush and logs and constructing a temporary road for equipment access, removing stream and ditch relief culverts, reconstructing stream channels, armoring and constructing grade control structures in stream channels, constructing cross drains and waterbars, recontouring, outsloping road segments, scarifying roadbeds, spreading slash on decommissioned surfaces and constructing foot or ATV paths along the roadway. Location of the three items include: 1) Big 8 Mine Road Decommissioning. This work is located is located approximately 4 miles southwest of Troy. Follow Road 427 (Callahan Creek Road) west from Troy approximately 3.7 miles to junction with NFS Road 14390 (Big 8 Mine Road) on the left (south side). Work begins at station 14+80 on Road 14390. 2) Gordon Greek Culvert Removal. This work is located approximately 6 miles southwest of Troy. Follow Road 427 west from Troy to the Gordon Creek crossing just past milepost 6.0. The worksite is located downstream of Road 427. The starting point for the equipment access is flagged with pink flagging on the left (south) side of the road approximately 0.2 miles past Gordon Creek. 3) Unnamed Tributary Culvert Removal. This work is located off Road 427 approximately 0.2 miles past Road 14390 at the first stream crossing. The worksite is upstream of the Road 427 crossing. Equipment access to the site will be from the west side of the stream. Estimated price range between $25,000 and $100,000. The period of performance is between July 15, 2011 and August 31, 2011. Solicitation package will be available approximately April 29, 2011.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-11-0054/listing.html)
- Place of Performance
- Address: Kootenai NF, Three River RD, Troy, Montana, United States
- Record
- SN02426189-W 20110417/110415234747-7a448dd4b2cedacae6136c4ed7d954f8 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |