Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 17, 2011 FBO #3431
MODIFICATION

Y -- Holter Lake Overflow Parking - Montana

Notice Date
4/15/2011
 
Notice Type
Modification/Amendment
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
BLM MT WESTERN DISTRICT OFC(MTB000)106 N. PARKMONTBUTTEMT59701US
 
ZIP Code
00000
 
Solicitation Number
L11PS00220
 
Response Due
5/2/2011
 
Archive Date
6/1/2011
 
Point of Contact
Jaclyn K Woods
 
Small Business Set-Aside
Total Small Business
 
Description
Specification Change:Amendment #3 - Specification Change: Site Grading - Sectin MT-02213 - Paragraph 1.05C replace with: C. Environmental Conditions: The contractor shall exercise caution in removing top soil and backfilling to required grades if soils are wet. After the top 6 inches are removed, place acceptable soils to the required grade on the exposed surface. Exposed surface soils that are above optimum moisture or that show deformation or pumping shall be left exposed and scarified to a minimum of 4 inches to assist in drying the exposed soils. Contractor shall scarify or harrow these soils using suitable equipment that prevents pumping and deformation. The Contracting Officer shall approve soil conditions before compaction begins.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/MT/L11PS00220/listing.html)
 
Record
SN02426516-W 20110417/110415235149-693c888e1dcb7b1740feddcd2b58ad4e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.