MODIFICATION
16 -- VALVE
- Notice Date
- 5/11/2011
- Notice Type
- Modification/Amendment
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- DEFENSE LOGISTICS AGENCY; DLR PROCUREMENT OPS DSCR-ZBA;3001STAFF DRIVE; TINKER AFB; OK; 73145
- ZIP Code
- 73145
- Solicitation Number
- SPRTA1-11-R-0161
- Response Due
- 3/22/2011
- Archive Date
- 8/31/2011
- Point of Contact
- Ronald K. Smith, Phone: 4057394988
- E-Mail Address
-
ronald.smith@tinker.af.mil
(ronald.smith@tinker.af.mil)
- Small Business Set-Aside
- N/A
- Description
- DEFENSE LOGISTICS AGENCY; DLR PROCUREMENT OPS DSCR-ZBA;3001STAFF DRIVE; TINKER AFB; OK; 73145 16--VALVE; SOLICITATION: SPRTA1-11-R-0161 Ronald Smith, Phone 405-739-5491, Email:ronald.smith@tinker.af.mil NEW MANUFACTURED MATERIAL - SURPLUS WILL NOT BE CONSIDERED; *SMALL BUSINESS SET-ASIDE HAS BEEN WITHDRAWN/REMOVED* PR Number(s): FD20301180428; Solicitation Number: SPRTA1-11-R-0161 Acquisition Method Code(AMC): 1C; Export Control: YES;First Article (Contractor Testing): YES;Rights Guard: YES;Qualification Requirements: YES; Applicable to: E-3A; Estimated Issue Date: 26-MAY-2011; Estimated Response Date: 27-JUNE-2011; The items, estimated quantities and required deliveries are as follows; L/I 0001 - INFORMATIONAL CLIN - BID A;NSN: 1650010058711; NOUN: VALVE;P/N: 50-6875-2; Description: PART OF HYDRAULIC INSTALLATION IN WING SPOILER SYSTEM.DIRECTS HYDRAULIC FLUID TO RAISED LOWER SPOILERS;Applicable to: E-3A; L/I 0001AA -TEST/INSPECTION REPORT - BID A;Quantity: 1 LOT;Delivery: TBD; L/I 0001AB - CERTIFICATION DATA FOR MATERIAL - BID A;Quantity: 1 LOT;Delivery: TBD; L/I 0001AC - FIRST ARTICLE PRODUCTION - CONTRACTOR TESTING - BID A;Required Delivery & Approval of Test Report: 31 MAR 2011; Quantity: 3 EA - 1.00 LOT (Will be part of production quantity); L/I 0001AD - MYC 36 Month (3 Year) NEW MANUFACTURED MATERIAL - BID ARequired Delivery & Approval of First Article: 31 MAR 2011; Best Estimated Quantity: 12 EA;Maximum Contract Quantity: 18 EA; L/I 0001AE - MYC 36 Month NEW MANUFACTURED MATERIAL - FIRST ARTICLE NOTREQUIRED (WAIVER) - BID B;NSN: 1650010058711; NOUN: VALVE;P/N: 50-6875-2, Description: PART OF HYDRAULIC INSTALLATION IN WING SPOILER SYSTEM.DIRECTS HYDRAULIC FLUID TO RAISED LOWER SPOILERS.Applicable to: E-3ADestination: FA8111,TINKER AFB,OK,73145-3041Required Delivery: 31 MARCH 2011; Quantity: 3 EA Revalidation Required;Best Estimated Quantity: 12 EA;Maximum Contract Quantity: 18 EA; The proposed contract action is for supplies or services for which theGovernment intends to solicit and negotiate with only one source, or alimited number of sources under the authority of FAR 6.302.; This is a full and open requirement. Allproposals received within forty-five days (thirty days if award isissued under an existing basic ordering agreement) after date ofpublication of this synopsis will be considered by the Government. A Determination by the Government not to compete this proposed contractbased upon responses to this notice is solely within the discretion ofthe Government. Information received will normally be considered solelyfor the purpose of determining whether to conduct a competitiveprocurement. IAW FAR 5.207(c)(13)(ii), All responsible sources maysubmit a capability statement, proposal, or quotation, which shall beconsidered by the agency.; Based on market research, the Government is not using the policiescontained in Part 12, Acquisition of Commercial Items, in itssolicitation for the described supplies or services. However,interested persons may identify to the contracting officer theirinterest and capability to satisfy the Government's requirement with acommercial item within 15 days of this notice.; Qualification Requirements Apply. To be eligible for contract award,offeror's must be approved sources, in accordance with qualificationrequirements. The Government is NOT required to delay contract award toreview pending Source Approval Requests (SARs). Therefore, offeror'sare encouraged to submit SARs AS SOON AS POSSIBLE. If the Governmenthas not completed review of a SAR package when the contract is awarded,the SAR will be retained and the source will be reviewed for possiblesource approval for future awards.; "You are REQUIRED to be "RIGHTS GUARD" certified in order to receive andview the drawings for this solicitation. If you intend to respond tothis solicitation and you are not certified please contact Mr. StephenPotts or Ms. Veta Funderburk, (405) 739-5400 or Email: veta.funderburk@tinker.af.mil for information on completing thisprocess."; The Contractor is required to be "Export Controlled" certified toreceive and view the drawings for this solicitation. To becomecertified, register at the website www.dlis.dla.mil/jcp (for guidance,go to FAQ).; First Article testing is required to ensure the reliability andintegrity of the item and operational safety of the weapon system thatuses it. Offerors can apply for waiver of First Article approval underthe following condition(s): Offerors who have previously furnishedproduction quantities of the same or similar article to the primecontractor for delivery to the DoD, offerors currently in production ofthe same or similar article for a DoD, offerors who have previouslyfurnished production quantities of the same or similar articles to theDoD, and provided not more than 36 months have elapsed since completionof the contract. Note: Determination of acceptability of 'or similar'items may only be made by the engineering office initiating this FirstArticle requirement.; The solicitation will be available for download on the release date fromwww.fedbizops.gov. No telephone requests. Hardcopies of thesolicitation will not be sent from this office. Questions concerningthis synopsis or subsequent solicitation can be directed to R. KrisSmith at (405) 739-5491 or email ronald.smith@tinker.af.mil. Note: AnOmbudsman has been appointed to hear concerns from offers or potentialofferors during the proposal development phase of this acquisition. Thepurpose of the Ombudsman is not to diminish the authority of the programdirector or contracting officer, but to communicate contractor concerns,issues, disagreements, and recommendations to the appropriate governmentpersonnel. When requested, the Ombudsman will maintain strictconfidentiality as to source of the concern. The Ombudsman does notparticipate in the evaluation of proposals or in the source selectionprocess. Interested parties are invited to call the Ombudsman at (405)734-8253. DO NOT CALL THIS NUMBER FOR SOLICITATION REQUESTS.; Foreign owned firms are advised to contact R. Kris Smith at (405)739-5491 or email ronald.smith@tinker.af.mil before submitting aproposal to determine whether there are restrictions on receiving anaward.; Duration of Contract Period: MYC 36 Month (3 YEAR); Electronic procedure will be used for this solicitation.;
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/SPRTA1-11-R-0161/listing.html)
- Record
- SN02445087-W 20110513/110511234345-51cae51fff1c2e330143039d804b62b9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |