Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 14, 2011 FBO #3458
SOLICITATION NOTICE

Y -- HI A-AD 6(6), Saddle Road- West Side

Notice Date
5/12/2011
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-B-00011
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, aaron.sanford@dot.gov
(cflcontracts@dot.gov, aaron.sanford@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
HI A-AD 6(6) Saddle Road - West Side, Defense Access Road The work will be located on the Island of Hawaii along a new alignment for Saddle Road (State Route 200) between Mamalahoa Highway (State Route 190) and Milepost 41 of existing Saddle Road. The project is 10 miles in length beginning near Mile Post 14 along the Mamalahoa Highway (south of Waikoloa Road) and terminating just west of milepost 41.5 of existing Saddle Road. The project consists of a two (2) contract schedules and one (1) option which include grading (anticipated excavation materials include volcanic ash, a'a and pahoehoe lava), drainage, and erosion control construction activities. Schedule A (Approximately 3.9 miles in length) - Significant items include (approximate quantities subject to change): 540,000 CY of roadway excavation; 87 acres of clearing and grubbing; 75,000 CY of foundation preparation in ash; 425,000 CY of embankment construction; 20 acres of hydraulic mulching; 23,000 LF of silt fence; 35,000 MGAL of watering for dust control and earthwork; 108 LF of 36 inch culvert pipe; 240 LF of 48 inch culvert pipe; 210 LF of 60 inch culvert pipe; 3,500 CY of rip rap; 15,000 GAL of dust palliative; 63,000 SY of rolled erosion control product, Type 3.B; and 29,000 CY of placing conserved topsoil. Schedule B (Approximately 6.0 miles in length, including Schedule A) - Significant items include (approximate quantities subject to change): 900,000 CY of roadway excavation; 142 acres of clearing and grubbing; 80,000 CY of foundation preparation in ash; 760,000 CY of embankment construction; 20 acres of hydraulic mulching; 40,000 LF of silt fence; 55,000 MGAL of watering for dust control and earthwork; 460 LF of 36 inch culvert pipe; 200 LF of 42 inch culvert pipe; 240 LF of 48 inch culvert pipe; 210 LF of 60 inch culvert pipe; 8,000 CY of rip rap; 15,000 GAL of dust palliative; 125,000 SY of rolled erosion control product, Type 3.B; and 29,000 CY of placing conserved topsoil. Option X (Approximately 3.6 miles in length) - Significant items include (approximate quantities subject to change): 510,000 CY of roadway excavation; 60 acres of clearing and grubbing; 20,000 CY of foundation preparation in ash; 485,000 CY of embankment construction; 76 acres of hydraulic mulching; 21,000 LF of silt fence; 25,000 MGAL of watering for dust control and earthwork; 26 LF of 24 inch culvert pipe; 100 LF of 42 inch culvert pipe; 110 LF of 48 inch culvert pipe; 3,000 CY of rip rap; and 85,000 SY of rolled erosion control product, Type 3.B. It is anticipated that this project will be advertised in mid May, 2011 with construction beginning in August, 2011 and extending to August, 2012 or August, 2014 dependent upon which bid Schedule/Option is awarded. Estimated cost for the base schedule and all options range from $10 million to $40 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-B-00011/listing.html)
 
Place of Performance
Address: County of Hawaii, State Route 200, Pohakulua Training Area, 'Saddle Road' west side. Mile Post 41 to State Route 190, Waimea, Hawaii, 96796, United States
Zip Code: 96796
 
Record
SN02446165-W 20110514/110512234351-f1728eb54c7d0fdba9b6e079445f13a3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.