FBO DAILY ISSUE OF JUNE 17, 2011 FBO #3492
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK

Notice Date
6/15/2011
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-2024
 
Archive Date
7/15/2011
 
Point of Contact
Phyllis O. Jordan, 918 832-4120
 
E-Mail Address
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-10-D-2021, TO 0003, 000304
 
Award Date
4/15/2011
 
Awardee
DOWNEY CONTRACTING, L.L.C. (157942041) <br> 3217 NE 63RD ST<br> OKLAHOMA CITY, OK 73121-1205
 
Award Amount
$0.00
 
Line Number
1
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC, W912BV-10-D-2021, Task Order 0003, Multiple Award Task Order Contract (MATOC) As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC, to perform the following work: 1. Delete All Double Bituminous Surface Treatment at Porum Landing and Brooken Cove. Estimated Quantities are as follows: a. Porum Landing- 16,231 SY. b. Brooken Cove - 16,157 SY. 2. Place a 2-inch Asphalt overlay on the entry road into Brooken Cove. This will start at the Government gate and extend to the intersection which leads to the Gate House. Estimated length of roadway is 7,022 feet with a road width of 23 feet. Estimated Quantity is 18,246 SY. Work shall consist of the following: a. Remove the grass and debris from cracks. Clean the road way of debris and rocks. When the road is clean, apply Penetrating Asphalt conditioner using a computerized rate controlled distributor truck.Place a Sand Seal which is a mixture of sand and screening on the surface. Work the aggregate into the cracks and small voids in the pavement. When the cracks and voids are filled to the surface, use a pneumatic tired roller to compress the material into the cracks and voids. After an appropriate set up time (one to two hours), remove the excess material form the road surface and apply a second application of Penetrating Asphalt Conditioner to the road surface. Allow a minimum of 4 hours to cure before allowing traffic. b. Place 2-inch asphalt overlay the entire length of roadway. c. Repair one area where the Eufuala office has installed a metal pipe across the Roadway. This will consist of 6-inch aggregate base course on the roadway where the pipe was installed. Approximately 18 SY. 3. At Brooken Cove exchange the CXT Arapahoe unit for the CXT Navajo unit. This will consist of the difference in cost of the buildings, Crane, and hook-up to utilities.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-2024/listing.html)
 
Record
SN02473972-W 20110617/110615235230-da521b7a983a1c0bc6e115fc51974959 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.