AWARD
Z -- RECOVERY--Z--PROJECT NUMBER 5650, Eufaula Lake, OK
- Notice Date
- 6/15/2011
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
- ZIP Code
- 74128-4609
- Solicitation Number
- W912BV-09-R-2024
- Archive Date
- 7/15/2011
- Point of Contact
- Phyllis O. Jordan, 918 832-4120
- E-Mail Address
-
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912BV-10-D-2021, TO 0003, 000304
- Award Date
- 4/15/2011
- Awardee
- DOWNEY CONTRACTING, L.L.C. (157942041) <br> 3217 NE 63RD ST<br> OKLAHOMA CITY, OK 73121-1205
- Award Amount
- $0.00
- Line Number
- 1
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Downey Contracting, LLC, W912BV-10-D-2021, Task Order 0003, Multiple Award Task Order Contract (MATOC) As part of Operations and Maintenance, Army, Recovery Act, this modification has been issued to Downey Contracting, LLC, to perform the following work: 1. Delete All Double Bituminous Surface Treatment at Porum Landing and Brooken Cove. Estimated Quantities are as follows: a. Porum Landing- 16,231 SY. b. Brooken Cove - 16,157 SY. 2. Place a 2-inch Asphalt overlay on the entry road into Brooken Cove. This will start at the Government gate and extend to the intersection which leads to the Gate House. Estimated length of roadway is 7,022 feet with a road width of 23 feet. Estimated Quantity is 18,246 SY. Work shall consist of the following: a. Remove the grass and debris from cracks. Clean the road way of debris and rocks. When the road is clean, apply Penetrating Asphalt conditioner using a computerized rate controlled distributor truck.Place a Sand Seal which is a mixture of sand and screening on the surface. Work the aggregate into the cracks and small voids in the pavement. When the cracks and voids are filled to the surface, use a pneumatic tired roller to compress the material into the cracks and voids. After an appropriate set up time (one to two hours), remove the excess material form the road surface and apply a second application of Penetrating Asphalt Conditioner to the road surface. Allow a minimum of 4 hours to cure before allowing traffic. b. Place 2-inch asphalt overlay the entire length of roadway. c. Repair one area where the Eufuala office has installed a metal pipe across the Roadway. This will consist of 6-inch aggregate base course on the roadway where the pipe was installed. Approximately 18 SY. 3. At Brooken Cove exchange the CXT Arapahoe unit for the CXT Navajo unit. This will consist of the difference in cost of the buildings, Crane, and hook-up to utilities.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-2024/listing.html)
- Record
- SN02473972-W 20110617/110615235230-da521b7a983a1c0bc6e115fc51974959 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |