Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 29, 2011 FBO #3504
SOURCES SOUGHT

13 -- M1 Abrams Ammo Rack Upgrade Kits

Notice Date
6/27/2011
 
Notice Type
Sources Sought
 
Contracting Office
ACC - Warren (ACC-WRN)(ANAD), ATTN: AMSTA-AN-CT, Building 221, 7 Frankford Avenue, Anniston, AL 36201-4199
 
ZIP Code
36201-4199
 
Solicitation Number
W911KF11S0002
 
Response Due
7/28/2011
 
Archive Date
9/26/2011
 
Point of Contact
warren.askew, 256.240-3396
 
E-Mail Address
ACC - Warren (ACC-WRN)(ANAD)
(warren.askew@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Anniston Army Depot has a requirement to purchase M1 Abrams Ammo Rack Upgrade Kits consisting of components and fasteners needed to facilitate the refurbishment of M1 Abrams family of ammo racks at the Anniston Army Depot (ANAD). The requirement is to include by not limited to the following parts: the number one (#1) ammo tube part number (P/N) 1249 1145, the #2 ammo tube P/N 1249 1146, Spider-assemble P/N 1249 1172-1, Sing Lever Assemble P/N 1249 1159, Frat Bar P/N 1249 1052. The requirement for full implementation will be approximately 650 sets. Because of the urgency of this requirement all M1 Abrams Ammo Rack Upgrade Kits consisting of components and fasteners must be delivered to ANAD as a complete kit. The current M1 Abrams Ammo Rack Upgrade Kits will not be modified to accept any other parts but that which is call out. All interested parties must contact Warren Askew, at (warren.askew@us.army.mil) with your Company's name and mailing address no later than (NLT) 12 July 2011 4:30 cst to obtain a non-disclosure statement. This statement must be signed in order to receive the following information by standard mail: a Quality Assurance Requirement Pamphlet 702-101(QAR) to ensure that all quality requirements are met, a Technical Data Package (TDP) for these parts and any other applicable documents to date. After receipt of these documents, All interested parties with the ability to meet these requirements shall provide your company's profile and must demonstrate in your technical/supporting documentation the following information: 1) demonstrate existing machinery and know how to produce long thin walled structures such as the ammo tubes, 2) provide proof of the capability, and the capacity, to perform the unique coating process for the Ammo tubes, 3) demonstrate your company can obtain the exact, correct, raw material for the Ammo Tubes in time to meet deliveries, 4) demonstrate the ability to begin delivering 25 kits/months 6 months after receipt of contract, 5) Submit a manufacture plan detailing the key processes, equipment, tooling and suppliers the proposed contractor will use executing the program, the plan should include a program time line/Gantt chart with key program milestones. 6) the tube is must be new, not remanufactured product (used will not be acceptable), and 7) Contractor must be able to provide first article sample of a selected tube in advance of contract award, within 60 days. THIS INFORMATION MUST BE REVIEWED AND APPROVED BY ANAD REPRESENTATIVES. This information must be provided to Warren Askew, Contract Specialist at the above email address NLT 28 July 2011, 4:30 cst.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/8f8a9b2441cf06c96413e45e04ac4b7f)
 
Place of Performance
Address: ACC - Warren (ACC-WRN)(ANAD) ATTN: AMSTA-AN-CT, Building 221, 7 Frankford Avenue Anniston AL
Zip Code: 36201-4199
 
Record
SN02482734-W 20110629/110627234315-8f8a9b2441cf06c96413e45e04ac4b7f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.