Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 25, 2011 FBO #3530
SOLICITATION NOTICE

Y -- LAKE CHELAN SHORELINE EROSION CONTROL - PHASE 4 - REFRIGERATOR HARBOR

Notice Date
7/23/2011
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Eastern Washington ZAP, Wenatchee NF, 215 Melody Lane, Wenatchee, Washington, 98801
 
ZIP Code
98801
 
Solicitation Number
AG-05GG-S-11-0032
 
Archive Date
9/22/2011
 
Point of Contact
Lois K Tate, Phone: 509-664-9360, Ellen R. Kinamon, Phone: 509-664-9234
 
E-Mail Address
ltate@fs.fed.us, ekinamon@fs.fed.us
(ltate@fs.fed.us, ekinamon@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
Lake Chelan Shoreline Erosion Control Phase 4 - Refrigerator Harbor - Okanogan & Wenatchee National Forest, Chelan Ranger District, Chelan County, Washington. This project consists of furnishing the construction and materials necessary to complete shoreline erosion control treatments at one site on the north shoreline of Lake Chelan in Chelan County, Washington. Construction consists of furnishing and installing special rock embankment, large woody debris, erosion control products as well as other incidental items in a variety of configurations called treatments at locations staked on the ground by the Government prior to commencing work. The work is being done to fulfill the requirements of an Article (1) Forest Service Erosion Control Plan to the license issued by the United States of America Federal Energy Regulatory Commission (FERC) to Public Utility District No. 1 of Chelan County (Chelan PUD) for Lake Chelan Hydroelectric Project No. 637-041 located on the Chelan River near the city of Chelan, Washington. The location of this project is approximately 37 miles up Lake Chelan from the Lady of the Lake boat dock in Chelan. The work site is accessible by water (boat or barge) only. There are no roads to this site. This project requires work on Lake Chelan at two time periods. The first is during high-pool lake levels (October - December) to pre-position rock at the project sites and the second is during low-pool lake levels (December to March) to complete the erosion control work. All work shall be completed by March 31, 2012. The is no Preproposal Meeting planned for this project. This project is estimated to range between $100,000 and $250,000. Formal RFP procedures will be followed for this acquisition. The Request for Proposals will be posted to the https://www.fbo.gov/ website on or about August 8, 2011. No hard copies of the solicitation and applicable amendments will be mailed or issued. This acquisition is posted for 100% HUBZone Set Aside concerns.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05GG/AG-05GG-S-11-0032/listing.html)
 
Record
SN02508781-W 20110725/110723233545-cf310aaa42d4f0ce1b546dabee620a27 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.