Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 26, 2011 FBO #3562
SOLICITATION NOTICE

Y -- CO PRA ROMO 12(2), Bear Lake Road

Notice Date
8/24/2011
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-R-00028
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS PROCUREMENT WILL BE ADVERTISED ON AN UNRESTRICTED BASIS (FULL AND OPEN COMPETITION). The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) intends to conduct a Best Value selection process to contract with a qualified Contractor, therefore requiring both a technical proposal and pricing. PROJECT DETAILS: CO PRA ROMO-12(2), Bear Lake Road This project is located in Rocky Mountain National Park on Route 12 (Bear Lake Road). The project crosses rolling and mountainous terrain in the eastern Rocky Mountain Range with elevations ranging up to 8600 ft. This project consists of the reconstruction and new construction of approximately 5 miles of Route 12, a two lane highway, beginning at the southern terminus of the previous reconstruction completed in 2004 and ending at the intersection with Highway 36 (Beaver Meadows Road). This project will include major grading, drainage, aggregate base, superpave hot asphalt concrete pavement, concrete retaining walls, rockery construction, bridge rehabilitation, rock blasting, turf establishment, and partial width traffic control. This project will require approximately 77,000 cubic yards of earthwork; 30,000 tons of aggregate base; 23,700 tons of superpave hot asphalt concrete pavement; 33,000 square feet of concrete retaining walls; 12,800 square feet of rockeries; 3,500 feet of pipe and box culvert installation, and bridge rehabilitation. The project consists of three schedules and one option package. The work will be performed in high altitude, environmentally sensitive areas of Rocky Mountain National Park. The route is open all year with a seasonal average daily traffic count of approximately 4000 vehicles. Great attention to detail will be required to achieve customer satisfaction in areas of creative landscaping, topsoil management, rock blasting, traffic control and timely completion of work. It is anticipated that this project will be advertised in early September, with construction beginning in November, 2011 and extending through September, 2013. Estimated cost for the base schedule and option is $15.0 to $25.0 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-R-00028/listing.html)
 
Place of Performance
Address: Rocky Mountain National Park near Estes Park, Colorado, Estes Park, Colorado, 80517, United States
Zip Code: 80517
 
Record
SN02548464-W 20110826/110825000919-584ae4a399fc33522a58be6737e33d7b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.