MODIFICATION
23 -- AMENDMENT 2: W91ZLK-11-T-0370 MOBILE OFFICE. REASON FOR AMENDEMENT: ANSWER VENDOR QUESTIONS, CLARIFY INFORMATION, EXTEND DUE DATE OF RFQ.
- Notice Date
- 9/1/2011
- Notice Type
- Modification/Amendment
- NAICS
- 332311
— Prefabricated Metal Building and Component Manufacturing
- Contracting Office
- ACC-APG SCRT - Aberdeen Installation, Directorate of Contracting, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013
- ZIP Code
- 21005-3013
- Solicitation Number
- W91ZLK-11-T-0370
- Response Due
- 9/8/2011
- Archive Date
- 11/7/2011
- Point of Contact
- Samantha Shultz, 410-278-0871
- E-Mail Address
-
ACC-APG SCRT - Aberdeen Installation
(samantha.l.shultz2.civ@mail.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Question 1) Is this the correct drawing? The Q&A's state no bathroom. Answer 1) The chart is just an example. There is no bathroom needed. There is no water supply. Question 2) What type of axles & wheels/tires does the trailer require? Standard one-trip mobile home axles/tires? Answer 2) Axles Quantity needs to be calculated as required per shipping weight. Select grade tires, Hitch detachable. Axle and tires need to stay with trailer. Question 3) Door Spec: Aluminum Door with 10"X10' VB. Please clarify type of aluminum door. Is this a hollow core steel door but with aluminum or is this a standard aluminum mobile home door? Answer 3) 36"x80" HEAVY DUTY Aluminum Door With 10"x10" Vision Block Question 4) 10"X10' VB, are you requesting a 10"x10" view light? Answer 4) 10"x10" Vision Block/ View Light Question 5) HVAC: 1-2.5 ton unit with 15kw heat strip. Does this mean 1 ton A/C is sufficient with 15kw heat? With low price bid award, there is no motivation to provide a larger A/C unit. Answer 5) 1 - 2.5 Ton Wall Mounted Unit With 15kw Heat strip is sufficient. Question 6) Are these trailers to be built to any particular building code? RE:.019 Aluminum & Trim. Is this a flat or corrugated aluminum? If flat, we recommend going with at least a.030 thickness to avoid waves in the paneling. Answer 6) State/Code Requirements/Insignias IBC/MD.... 100mph Wind speed.030 thickness to avoid waves in the paneling. Additional Information for clarity: Site Service: Building delivery Installation -Set, block, level trailer -Anchors -Skirting installation -Hitch removal Flooring Vinyl composite Tile through-out 2"X6" Floor Joist @ 16" On Center (O.C). Standard Plywood Floor Sheath/Decking (5/8 Tongue & Groove) Interior wall height 8' Exterior Wall Height 8' double top plate on exterior walls Exterior Walls with 2"x 6" wood construction 16" O.C. 5/8 (thickness) VCG (type "X" Gypsum Board) Interior Doors 36" x 80" Painted H.C Six panel Door (WJ) including pre-manufactured wood jam and lever. Two (2) passage locks: There are two offices; one on each office to the common room. No specific type of passage lock required. Roof snow load is 30 lbs. Box truss type- preconstruction of roof. " Sea-spray ceiling finish Sidewall type hurricane straps 1 attic ventilation per code Electrical: 1 standard 150 AMP 10 Standard surfaces mounted 240 fluorescent lights. Electric ballast & T-8 Bulbs Two (2) Standard 60 Watt Porch light with photo cell Combo dual head emergency light/ exit sign The due date of the quotes has been moved from 05 September 2011 to 08 September 2011 at 4:00 PM EST.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/a47d4e36dac1f40a8f48bc209e06c3b8)
- Place of Performance
- Address: ARMY CONTRACTING COMMAND (ACC), ABERDEEN PROVING GROUND (APG), (AICD) Directorate of Contracting, 4118 Susquehanna Avenue Aberdeen Proving Ground MD
- Zip Code: 21005-3013
- Zip Code: 21005-3013
- Record
- SN02560338-W 20110903/110902103735-a47d4e36dac1f40a8f48bc209e06c3b8 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |