Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 25, 2011 FBO #3592
MODIFICATION

66 -- HI PACE TURBO PUMP AND ACCESSORIES

Notice Date
9/23/2011
 
Notice Type
Modification/Amendment
 
NAICS
333911 — Pump and Pumping Equipment Manufacturing
 
Contracting Office
NASA/Goddard Space Flight Center, Code 210.M, Greenbelt, MD 20771
 
ZIP Code
20771
 
Solicitation Number
NNG11404772L
 
Response Due
9/26/2011
 
Archive Date
9/23/2012
 
Point of Contact
Rogenia Burton-Pendergast, Contracting Officer, Phone 301-286-5093, Fax 301-286-5373, Email Rogenia.M.Burton-Penderga@nasa.gov
 
E-Mail Address
Rogenia Burton-Pendergast
(Rogenia.M.Burton-Penderga@nasa.gov)
 
Small Business Set-Aside
N/A
 
Description
This is a modification to the synopsis entitled HI PACE TURBO PUMP AND ACCESSORIES,NNG1140472L which was posted on September 01, 2011. You are notified that the followingchanges are made: Correction to quantities and to submit answers to questions submitted.QuantityCorrection and Questions with Answers are listed below.-PKR 251 P/N PT R26 000 or equivalent,Qty is 3.-Sensor Cable P/N PT 448 250-T or equivalent,Qty is 3.-TPG 256A Maxi Gauge P/N PT G28 760 or equivalent, Qty is 2.Q1. I was reviewing this and noticed a line item for a system frame. Do you havedimensions, material or a more detailed specification for this part?A1. The official specs:-Dimensions are 19.5' (L) X 16' (W) x 31' (H)-Frame is made from 8020 Extruded aluminum-Mounting shelves are made from 1/4' aluminum-Frame is mounted on 4 swivel/lockable castors with the total dimensions (includingcasters) of width: 16', depth: 19.5', and height 31', and the goal of the design is tohave minimal length between the piston and turbo pumps, minimal overall volume, andheight low enough to mate an existing table-height manifold. That is, the height of 31'is the top of the frame, and the turbo pump is expected to extend above this somewhat,with the high-vacuum port pointing up (standard pump station config).Q2. Please let me know if you need more than 1 full range gauge because the specs belowonly list qnty 1 gauge and you have 1 six gauge display?A2. We need THREE (3) full range gauges. We need TWO (2) six-gauge display units.Q3. Do you need 6 gauges?A3. We do not need 6 gauges.Q4. Also there is only 1 xtradry do you need 4?A4. We only need ONE (1) Xxtra Dry pump.The due date for responses IS extended. The due date for responses has been extended to4:30 P.M. Eastern Standard Time on September 26, 2011.Documents related to this procurement will be available over the Internet. Thesedocuments will reside on a World Wide Web (WWW) server, which may be accessed using a WWWbrowser application. The Internet site, or URL, for the NASA/GSFC Business Opportunitieshome page is http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=51 Offerors are responsible for monitoring this site for the release of the solicitation andany amendments. Potential offerors are responsible for downloading their own copy ofthe solicitation and amendments (if any).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/NASA/GSFC/OPDC20220/NNG11404772L/listing.html)
 
Record
SN02590438-W 20110925/110923235908-2d4fce88d54caeeb57b483caed15f296 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.