Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 28, 2011 FBO #3595
MODIFICATION

Z -- WARD MOUNTAIN CAMP GROUND RECONSTRUCTION

Notice Date
9/26/2011
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise,, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-S-11-0033
 
Archive Date
10/20/2011
 
Point of Contact
Steve R Roehr, Phone: 702-839-5575, CHARLENE BYRD, Phone: 702-839-5561
 
E-Mail Address
sroehr@fs.fed.us, cbyrd@fs.fed.us
(sroehr@fs.fed.us, cbyrd@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
Accepting offers from HubZone certified contractors to perform the following Construction Contract: 1.1 SCOPE OF CONTRACT A. This project consists of the reconstruction of the Ward Mountain Campground on the Ely Ranger District on the Humboldt - Toiyabe National Forest. B. The work associated with this project includes: 1. Removal and disposal of existing structures and site furnishings. 2. Obliterating, scarifying, and re-contouring existing roads and paths. 3. Reconstruction of campground roads, pullouts, parking areas, back-in spurs and pull-through spurs. 4. Installing new culverts and signs for roadways. 5. Installing a new water system including a pump house utility building, electrical tie-in, distribution lines, hydrants, chlorinator and valve boxes. 6. Installing government furnished restrooms with concrete pathways. 7. Constructing a new volleyball court, horseshoe pits, post and pole fencing. 8. Constructing a new aggregate pathway system. 9. Installing new site features, including site identification signs, wheelstops, bulletin boards, kiosks, unit markers, and Gov't. furnished fee tube. 10. Constructing a host unit, including: electrical tie-in and on-site wastewater disposal system. 11. Constructing new concrete and aggregate group sites with shelters and site furniture. 12. Construction of new concrete amphitheater stage, guardrail and seating. 13. Construction of new aggregate family units with site furniture, tent pads, and aggregate paths. C. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. D. Quantities associated with these options are identified in the Schedule of Items. E. Government Furnished Items: 1. Vault Toilet Buildings F. Bid Option #1: 1. Amphitheater and associated items. The Magnitude is between $1 million and $5 million ***As of September 17, 2011, there have been two site visits offered (9/7 & 9/15). RFI's regarding the specifications and drawings must all arrive to the CO no later 1630 hrs, Local time on September 19, 2011. On or about September 27, 2011 there will be an amendment published to the solicitation. This amendment will answer and clarify the questions and RFI's received as of this date. Offers will then be called for based on the state of the solictation after the publication of the amendment. The due date for offers is extended until 1500 hours local on October 5, 2011. All inquiries regarding this project shall be IN WRITING VIA E-MAIL to Contracting Officer at sroehr@fs.fed.us Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2011-08-24 15:16:58">Aug 24, 2011 3:16 pm Modified: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][modified_on]" value="2011-09-26 13:47:01">Sep 26, 2011 1:47 pm Track Changes Directions to the site: From Ely, Nevada, take Highway 6 south towards Tonopah 10 miles to Murray Summit. Turn left just before the summit at the Forest Service sign for Ward Mountain Recreation Area and Campground. From Las Vegas, Nevada, take Hwy 93 north 86 miles to the junction with SR 318. Follow SR 318 124 miles north to Murray Summit. Turn right at the Ward Mountain Recreation Area and Campground sign.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-11-0033/listing.html)
 
Place of Performance
Address: 1.2PROJECT LOCATION, A.The project is located in the Ely Ranger District of the Humboldt - Toiyabe National Forest, White Pine County, NV, in Sections 35, T16N, R62E. It is located approximately 10 miles southwest of Ely, NV off state highway 6., Ely, Nevada, 89301, United States
Zip Code: 89301
 
Record
SN02592915-W 20110928/110926235903-48d4d0ae21728c5b27d217809b6989cc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.