MODIFICATION
Z -- WARD MOUNTAIN CAMP GROUND RECONSTRUCTION
- Notice Date
- 9/26/2011
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise,, Idaho, 83709, United States
- ZIP Code
- 83709
- Solicitation Number
- AG-0261-S-11-0033
- Archive Date
- 10/20/2011
- Point of Contact
- Steve R Roehr, Phone: 702-839-5575, CHARLENE BYRD, Phone: 702-839-5561
- E-Mail Address
-
sroehr@fs.fed.us, cbyrd@fs.fed.us
(sroehr@fs.fed.us, cbyrd@fs.fed.us)
- Small Business Set-Aside
- HUBZone
- Description
- Accepting offers from HubZone certified contractors to perform the following Construction Contract: 1.1 SCOPE OF CONTRACT A. This project consists of the reconstruction of the Ward Mountain Campground on the Ely Ranger District on the Humboldt - Toiyabe National Forest. B. The work associated with this project includes: 1. Removal and disposal of existing structures and site furnishings. 2. Obliterating, scarifying, and re-contouring existing roads and paths. 3. Reconstruction of campground roads, pullouts, parking areas, back-in spurs and pull-through spurs. 4. Installing new culverts and signs for roadways. 5. Installing a new water system including a pump house utility building, electrical tie-in, distribution lines, hydrants, chlorinator and valve boxes. 6. Installing government furnished restrooms with concrete pathways. 7. Constructing a new volleyball court, horseshoe pits, post and pole fencing. 8. Constructing a new aggregate pathway system. 9. Installing new site features, including site identification signs, wheelstops, bulletin boards, kiosks, unit markers, and Gov't. furnished fee tube. 10. Constructing a host unit, including: electrical tie-in and on-site wastewater disposal system. 11. Constructing new concrete and aggregate group sites with shelters and site furniture. 12. Construction of new concrete amphitheater stage, guardrail and seating. 13. Construction of new aggregate family units with site furniture, tent pads, and aggregate paths. C. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item. D. Quantities associated with these options are identified in the Schedule of Items. E. Government Furnished Items: 1. Vault Toilet Buildings F. Bid Option #1: 1. Amphitheater and associated items. The Magnitude is between $1 million and $5 million ***As of September 17, 2011, there have been two site visits offered (9/7 & 9/15). RFI's regarding the specifications and drawings must all arrive to the CO no later 1630 hrs, Local time on September 19, 2011. On or about September 27, 2011 there will be an amendment published to the solicitation. This amendment will answer and clarify the questions and RFI's received as of this date. Offers will then be called for based on the state of the solictation after the publication of the amendment. The due date for offers is extended until 1500 hours local on October 5, 2011. All inquiries regarding this project shall be IN WRITING VIA E-MAIL to Contracting Officer at sroehr@fs.fed.us Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2011-08-24 15:16:58">Aug 24, 2011 3:16 pm Modified: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][modified_on]" value="2011-09-26 13:47:01">Sep 26, 2011 1:47 pm Track Changes Directions to the site: From Ely, Nevada, take Highway 6 south towards Tonopah 10 miles to Murray Summit. Turn left just before the summit at the Forest Service sign for Ward Mountain Recreation Area and Campground. From Las Vegas, Nevada, take Hwy 93 north 86 miles to the junction with SR 318. Follow SR 318 124 miles north to Murray Summit. Turn right at the Ward Mountain Recreation Area and Campground sign.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-11-0033/listing.html)
- Place of Performance
- Address: 1.2PROJECT LOCATION, A.The project is located in the Ely Ranger District of the Humboldt - Toiyabe National Forest, White Pine County, NV, in Sections 35, T16N, R62E. It is located approximately 10 miles southwest of Ely, NV off state highway 6., Ely, Nevada, 89301, United States
- Zip Code: 89301
- Zip Code: 89301
- Record
- SN02592915-W 20110928/110926235903-48d4d0ae21728c5b27d217809b6989cc (fbodaily.com)