SOURCES SOUGHT
Y -- FY08 MCA, PN 58784, Brigade Headquarters Complex, USAG Humphreys
- Notice Date
- 10/20/2011
- Notice Type
- Sources Sought
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Far East, Unit 15546, Attn:CEPOF-CT, Seoul, AP 96205-0610
- ZIP Code
- 96205-0610
- Solicitation Number
- W912UM-12-R-0002
- Response Due
- 11/4/2011
- Archive Date
- 1/3/2012
- Point of Contact
- Jisun Kang, 82-2-2270-7585
- E-Mail Address
-
USACE District, Far East
(jisun.kang@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- a. This is a Sources Sought Synopsis announcement for information only, to be used for preliminary planning purposes. No proposals are being requested or accepted with this synopsis. This is not a solicitation or a request for proposal (RFP) and no contract shall be awarded from this synopsis. The U.S. Army Corps of Engineers Far East District (FED) anticipates the issuance of a Request for Proposal and the award of a firm-fixed price construction contract for the 501 MI BDE HQ at Camp Humphrey's, Korea. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. b. The purpose of this synopsis is to gain knowledge of interest, capabilities and qualifications of interested construction firms who have the capabilities to complete and perform a contract of this magnitude, and to address any questions, recommendations, or concerns from Industry. c. Description of Project: Construct the 501 MI Brigade HQ (39,629 SF) at US Garrison Humphreys, Korea. This project will include constructing a 2-story structure for the 501 MI BDE, with approximately 1/4th of the floor space being a Controlled Access Area (CAA). The facility will include multiple operations centers, collaboration spaces, storage, personnel support functions, and standby generators. Supporting facilities include water, sanitary and storm sewer, electric, walkways, heat distribution lines, paving, storm drainage, parking, site and road improvements and information systems. Access for individuals with disabilities will be provided in public areas. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features are included in the construction. d. Security Requirements: This project will include the construction for the 501 MI BDE operations that will process classified communications. The following special procedures must be followed during construction. (1) Clearance Requirements for Construction: Firm to be US Prime (Required) to manage and construct the facility. Local National labor (Restrictions apply) may be utilized to build and perform general construction; such as, the concrete foundation and walls; plumbing, electrical, and communications infrastructure; fire detection and suppression systems; and HVAC systems. (2) Access Control Requirements: A project site pass system shall be implemented by FED and required for all construction personnel, deliveries and visitors. The construction site access control process is required, and will include an effective screening and searching procedures for the ingress and egress of the construction area. Signage will be displayed prohibiting items that cannot enter the construction area. Barriers shall be erected to deny unauthorized access to the construction area. (3). Control of Material: All material procured locally for construction will be subject to inspection by government personnel. After material is procured and inspection is completed the material must be stored within the construction area or a secured storage area must be used. e. Magnitude of Project: The magnitude for this project is between $25,000,000 and $100,000,000. The project is subject to reprogramming and availability of funds. f. Performance Period: Duration of construction is 600 calendar days from Notice to Proceed or Award date. Solicitation: a.The project solicitation will consist of two (2) phases. Phase I - Pre-Qualification of Offerors The announcement of solicitation of pre-qualification submissions is Phase I. The USACE will evaluate and rate the pre-qualification submissions based on the procedure and evaluation criteria set forth. The USACE may refuse to pre-qualify any Offeror receiving less than a satisfactory rating on any evaluation factor or sub-factor. Phase II - Requests for Proposals from Pre-Qualified Offerors Those Offerors determined to be pre-qualified in accordance with Phase I will be issued a formal Request for Proposal (RFP) for the project and invited to submit proposed technical factors and pricing in Phase II. The RFP will include a statement of work, standards, and criteria for the project that set out the project scope, construction requirements and restrictions, construction documentation, construction expertise, construction process, post-construction activities, reference drawings and specifications, codes and standards, and security requirements. b. In accordance with Federal Acquisition Regulation (FAR) guidance, the prime contractor must have the capability to perform at least 12% of the contract work with his/her own employees. c. Award will be based on Low Price Technically Acceptable to the Government, who is pre-qualified during Phase I of the solicitation. d. Anticipated solicitation issuance date for Phase I is in November 2011. The estimated proposal due date for technical proposals expected to be in December 2011. Phase II of the solicitation is anticipated to be sent to qualified firms in December 2011. The estimated proposal due date for Phase II proposals is January 2012. f. Offerors response to this Synopsis shall be limited to 50 pages and shall include the following information: (Clarifications and or questions shall be submitted in a separate word document and will not count towards the 50 page limitation) "Offerors name, addresses, point of contact, phone number, and e-mail address. "Offerors interest in bidding on the solicitation when it is issued. Offerors capability to meet personnel requirements. "Offerors capability to perform a contract of this magnitude and complexity (include offerors in-house capability to execute construction, comparable work performed within the past ten (10) years brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) provide at least 3 examples. Offerors Joint Venture information, if applicable, existing and potential. Offerors Bonding Capability (construction bonding level per contract expressed in dollars). Interested Offerors shall respond to this Sources Sought/Market Survey Synopsis no later than 10:00 hrs (KST) 4 November 2011. All interested contractors must be registered in CCR to be eligible for award of Government contracts. Email responses to: Ms. Jisun Kang, Contracting Officer, CEPOF-CT-C, Far East District, Email address: jisun.kang@usace.army.mil. Email is the preferred method when receiving responses to this synopsis.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA81/W912UM-12-R-0002/listing.html)
- Place of Performance
- Address: USACE District, Far East Unit 15546, Attn:CEPOF-CT, Seoul AP
- Zip Code: 96205-0610
- Zip Code: 96205-0610
- Record
- SN02610013-W 20111022/111020233850-267c52536aadfe36af5c2bb1dc7a8add (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |