Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 22, 2011 FBO #3619
SPECIAL NOTICE

Z -- Cathedral Rock Picnic Area and Trailhead Reconstruction Project - Site Visit Drawings

Notice Date
10/20/2011
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise,, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-SN-12-0002
 
Point of Contact
Margaret S. Schafer, Phone: 7028395575, CHARLENE BYRD, Phone: 702-839-5561
 
E-Mail Address
msschafer@fs.fed.us, cbyrd@fs.fed.us
(msschafer@fs.fed.us, cbyrd@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Drawings for Site Visit NOTICE OF PROJECT SITE VISIT - CATHEDRAL ROCK PICNIC AREA AND TRAILHEAD RECONSTRUCTION PROJECT The US Forest Service has a requirement for the reconstruction of Cathedral Rock Picnic Area and Trailhead. The project is located in the Spring Mountains National Recreation Area of the Humboldt-Toiyabe National Forest, Clark County, Nevada near Mount Charleston, NV. Principle features of the work may include construction of roads, parking areas, picnic sites, trails, drainage structures, water system, sewer system, electrical system, 13 restroom building installations, fee station building installation, and signs. Work includes but is not limited to clearing and grubbing; excavation and embankment; construction of asphalt roads and parking areas; striping; concrete pads with picnic and utility tables; concrete walking paths; restroom buildings; entrance station building; signs; road closure gates; water, sewer, and electric lines; leach fields; traffic control barricades; and vehicle accounting system. A site visit will be held on November 15, 2011 at 10 a.m. PST. The location of the site visit is T.19 S., R.56 E., section 36. Travel from the intersection of Highway 157 and Hwy 95 just North of Las Vegas, NV. Follow highway 157 (Kyle Canyon Rd.) southwest for approximately 21 miles to the entrance of the Picnic Area near Mt. Charleston Lodge. Transportation to the site will not be provided; prospective contractors will provide their own transportation to and from the site. No solicitation is available at this time. Future project synopsis and solicitation issuance will be posted under AG-0261-S-12-0002. Limited project drawings and site map for the site visit will be posted with this notice. Contractors interested in attending the site visit should contact Charlene Byrd at 702-839-5561or email at cbyrd@fs.fed.us no later than 1200, Monday, November 14, 2011.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-SN-12-0002/listing.html)
 
Record
SN02610039-W 20111022/111020233912-1054d4ed8962156094e3118d17dec1d1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.