SOURCES SOUGHT
48 -- Double Block & Bleed Valves
- Notice Date
- 11/14/2011
- Notice Type
- Sources Sought
- NAICS
- 332919
— Other Metal Valve and Pipe Fitting Manufacturing
- Contracting Office
- Department of Energy, Bechtel National, Inc. (DOE Contractor), Bechtel National Inc., 2435 Stevens Center Place, Richland, Washington, 99352
- ZIP Code
- 99352
- Solicitation Number
- 24590-CM-MRA-PY01-00021
- Point of Contact
- Winifred Renz, Phone: 5093712338
- E-Mail Address
-
werenz@bechtel.com
(werenz@bechtel.com)
- Small Business Set-Aside
- N/A
- Description
- Request for Interest Form Piping Specialty Items - Double Block & Bleed Valves (BCP 4750) Document Number: 24590-CM-MRA-PY01-00021 Important to Safety? NO Quality Level: Commercial Material (CM) Quality Surveillance: Level 0 - No Inspection Commodity Code: PY01 NAICS Code: 332919 Submit Interest By: November 23, 2011 PROJECT DESCRIPTION AND LOCATION The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a complex of radioactive waste treatment processing facilities designed and constructed by Bechtel for the Department of Energy (DOE). The facility will process the Hanford Site tank waste and put the waste into a stable glass form. The processed waste will be shipped to other sites for depository. The Project site is located at 200 East Area of the Hanford Site near Richland, Washington, along the Columbia River. The site elevation varies from 662 to 684 feet above mean sea level. Sand and silt exist as surface materials. Ambient temperature is (-) 23 degrees F minimum to 113 degrees F maximum, with relative humidity of 5% minimum to 100% maximum. The project design life is 40 years. SCOPE OF WORK There are multiple pieces of equipment within the steam plant that currently have single isolation valves that need to be replaced with double block and bleed (DBB) valves. The 3" and larger single isolation have class 150 flanges and the DBB valves must have the same face to face dimension as the single isolation valve to avoid piping rework. The 2" and smaller single isolation valves have either threaded or welded end connections. The 2" and smaller DBB valves will have threaded or welded connections and some piping rework will be required. The design temperature is 375°F and the design pressure 170 psig. EQUIPMENT AND MATERIALS REQUIRED Valve Size (inch) Quantity Required End Connection 1/2 11 Welded or threaded 3/4 11 Welded or threaded 1 6 Welded or threaded 1.5 6 Welded or threaded 2 14 Welded or threaded 3 18 150 lb RF Flange 4 10 150 lb RF Flange 6 10 150 lb RF Flange 8 2 150 lb RF Flange CODES Piping system is ASME B31.1. STANDARDS The valves shall be fabricated to national standards. QA REQUIREMENTS Potential bidders should provide, in electronic format, some documentation that describes their company's Quality Assurance program. A summary, or table of contents of the program, similar evidence will be satisfactory. The information may be emailed to wtpacqui@bechtel.com. T he successful bidder must be registered with Bechtel and shall have and maintain a documented quality assurance program that complies with the applicable WTP requirements including, but not limited to, 10 CFR 830, DOE Order 414.1, ASME NQA-1. The bidder's Quality Assurance Program must meet the specific requirements of the Material Requisition. The bidder must have the ability to demonstrate satisfactory implementation of their Quality Assurance Program to be considered for an award. In order to expedite the qualification process, potential bidders are encouraged to provide a controlled copy of their Quality Assurance Program (include the "Package Ref." - Document Number) to BNI Supplier Qualification, if controlled copy was not previously submitted and evaluated by BNI Supplier Qualification. The preferred method is to submit in electronic format via e-mail to: wtpsqamr@bechtel.com -or- Hard copies (include the "Package Ref." - Document Number) may be submitted to: Bechtel National, Incorporated Attn: Supplier Qualification Manager 2435 Stevens Center Place Richland, WA 99354 COMMERCIAL\TECHNICAL REQUIREMENTS Bechtel Procurement is responsible for collection, evaluation, and internal publication of Supplier/Subcontractor information through our project's pre-qualification program. In addition to the information requested above, Bechtel requires you to register your company at the Supplier and Contractor Portal at: https://supplier.bechtel.com Prior to being considered on any Bidders List you must go to the Qualification Process on this web site to complete the required forms for this opportunity. All information provided shall be strictly confidential. QUESTIONNAIRE Potential offeror shall submit their interest in this opportunity via e-mail using the " Submit Interest " link provided on the Two Year Forecast Report, which provides an outlined email including, but not limited to the bulleted items below, and is appropriately addressed to our central mailbox and to the buyer. Each interest email should include: •§ Dun and Bradstreet #: •§ Company Name: •§ Company Address: •§ Contact Phone #: •§ Contact Fax #: •§ Contact Person: •§ E-mail Address: Note: The wtpacqui@bechtel.com e-mail address is a document file address and is not an actual person. Bechtel personnel will access this address to see who has registered, but since it is not owned by any single person, do not send request for information to this address. If you require additional information, please contact the person listed in this posting. CONTACT Bechtel National, Inc. 2435 Stevens Center Place Richland, WA 99354 Attn: Shawn Foster Email: spfoster@bechtel.com
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/BNI/BNI/24590-CM-MRA-PY01-00021/listing.html)
- Record
- SN02622887-W 20111116/111114234444-3c71a1dc85457a9ad0b4c412959a1b82 (fbodaily.com)