MODIFICATION
C -- A-E Services-Large Projects - SAD(Small Business)
- Notice Date
- 11/16/2011
- Notice Type
- Modification/Amendment
- NAICS
- 541310
— Architectural Services
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Savannah, Attn: CESAS-CT, PO Box 889, Savannah, Georgia, 31402-0889, United States
- ZIP Code
- 31402-0889
- Solicitation Number
- W912HN-12-Z-RB01
- Archive Date
- 12/15/2011
- Point of Contact
- Rohan Bryan, Phone: 912-652-5862, Terrence D. Johnson, Phone: 912-572-5072
- E-Mail Address
-
rohan.a.bryan@usace.army.mil, Terrence.d.johnson@usace.army.mil
(rohan.a.bryan@usace.army.mil, Terrence.d.johnson@usace.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- A-E Services - Large Projects - SAD (Small Business) Solicitation Number: W912HN-12-Z-RB01 Agency: Department of the Army Office: U.S. Army Corps of Engineers Location: U.S. Army Engineer District, Savannah Classification Code: C -- Architect and engineering services NAICS Code: 541 -- Professional, Scientific, and Technical Services/541310 -- Architectural Services Solicitation Number: W912HN-12-Z-RB01 Notice Type: Sources Sought (Market Resource) Synopsis: Technical Point of Contract: Leslie Zuniga at 912-652-5547 or email: leslie.a.zuniga@usace.army.mil; and Contractual Questions to: Rohan Bryan at 912-652-5862 or email: rohan.a.bryan@usace.army.mil; Questions concerning SF330; Les Zuniga at 912-652-5574 or email: leslie.a.zuniga@usace.army.mil. **** PERSONAL VISITS for the purpose of DISCUSSING this announcement WILL NOT BE SCHEDULED. THIS is NOT a REQUEST for a PROPOSAL. **** 1. CONTRACT INFORMATION: This announcement is 100% set-aside for Small Businesses only. a) The Savannah District, U.S. Army Corps of Engineers requires the services of Architect-Engineer (A-E) firms for a minimum of one and a maximum of three multidiscipline Indefinite Delivery Contracts (IDC) for large projects. These contracts are being procured in accordance with the Brooks A-E Act, as implemented in FAR Subpart 36.6. See numbered note 24 for general information on the A-E selection process. Firms will be selected for negotiations based on demonstrated competence for the required work. Offerors are cautioned to read this announcement in its entirety. Contracts awarded as a result of this announcement will be administered by Savannah District for use on federal projects under its jurisdiction and if requested other Corps of Engineers Districts. Firms will be selected for negotiation based on demonstrated competence for the required work. Contracts may be issued up to three years after selection approval. Typically, the contracts will consist of three ordering schedules, each schedule not to exceed one year, for a total of up to three years maximum. The total amount of each contract over the three year ordering period may not exceed $4,500,000. Work will be issued by negotiated firm-fixed price task orders. Task Orders will be primarily for large projects with a construction value greater than $2 million, however as required, smaller projects will be executed under these contracts. These task orders are firm fixed price. Projects to be designed are not yet determined and funds are not presently available. Assignment of individual task orders to the contracts with identical scopes of work will be based on the following factors: (1) Performance and quality of deliverables under the current IDC, (2) Current capacity of the firm to accomplish the task order in the required time, and (3) Equitable distribution of work among identical contracts. The North American Industry Classification System (NAICS) 541310; size standard $4.5 million. To be eligible for contract award, a firm must be registered in the DOD Central Contractor Registration (CCR). Register via the CCR Internet site at http://www.ccr.gov or by contacting the DOD Electronic Commerce Information Center at 1-800-334-3414. 2. PROJECT INFORMATION: Work may consist of preparation of reports, studies, project planning, design criteria, preparation of drawings and specifications, cost estimates, and other general A-E services for multi-disciplined new construction and renovation projects for military and other government agencies. The work primarily consists of the design of new vertical construction on facilities commonly found at military installations (barracks, dining facilities, offices, training facilities, equipment maintenance facilities, labs, etc.) as well as horizontal construction projects (airfields, roads, ranges, etc.). The firm may be required to provide construction phase and other services that may include preparation of operation and maintenance manuals, shop drawing review, and commissioning/start-up/fit-up design support. All design must comply with the Savannah District Design Manual. All drawing files must be delivered in the (*.dgn) format. All drawing files will be developed using the Tri Service AEC Standard, as supplemented by the Savannah District instructions. The standards include naming convention, file and directory structure, line weights, levels, and color. Specifications will be produced in SpecsIntact using the Unified Facilities Guide Specifications (UFGS). Responses to Government review comments will be provided on the Corps of Engineers Design Review and Checking System (DrChecks). 3. SELECTION CRITERIA: The selection criteria for this project are listed below in descending order of importance. Proposals will be evaluated on each of the criteria factors listed below. Each factor will be assigned a rating from outstanding to unsatisfactory, based on the risk to the government that the offeror will successfully perform the factor being evaluated. An overall consensus rating will be given to each submission. Award will be made to the firm determined to be most highly qualified. Factors listed below will be rated based on a relative weighting as follows: Significantly More Important - means that the factor is at least two times greater in value than another factor. More Important - means that the factor is greater in value than another factor but less than two times greater. Equal - means that the factor is of the same value or nearly the same as another factor. For this solicitation, Factor 1 (Specialized Experience and Technical Competence) and Factor 2 (Key Personnel) are weighted equally and each factor individually is more important than Factor 3 (Past Performance), Factor 4 (Work Management) and Factor 5 Knowledge of Locality and significantly more important than Factor 6 (Volume of DoD Contract Awards). Past Performance, Work Management and Knowledge of Locality are weighted equally and each factor individually is more important than Volume of DoD Contract Awards. Volume of DoD Contract Awards will only be used as a *tie-breaker* among firms that are essentially technically equal. Information on each factor should be submitted FOR THE OFFICE AND/OR EMPLOYEE PERFORMING THE WORK IN RESPONSE TO THIS ANNOUNCEMENT. It is recognized that for firms with multiple offices, a project team may be formed from personnel from more than one office. If more than one office is represented, this must be stated clearly in the work management plan and the Selection Board will consider the performance risk associated with that team not being co-located and the geographical proximity to the supported projects. **** FACTOR 1 - SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE. Specialized experience and technical competence in (in descending order of importance within this category): a. Design of new facilities or utility systems of various types, sizes, and complexities; b. Rehabilitation of existing facilities or utility systems of various types, sizes, and complexities. c. Design of projects on Army or Air Force installations; d. Application of Anti-Terrorist/Force Protection criteria; e. Cost engineering using MCACES; f. Sustainable design utilizing LEED rating tools; g. Preparation of the development of the technical information for design-build Request for Proposals; h. Construction phase services including shop drawing review and preparation of O&M manuals. Technical competence will be judged based on a minimum of satisfactory performance and experience of the firm and its design team, longevity and previous working relationships among the working parties on similar projects, and most recent firm and employee history of experience on similar projects. **** FACTOR 2 - KEY PERSONNEL. All key personnel for whom resumes are provided shall be shown on the organizational chart in Section D of SF 330. Additional staff available for work on this contract shall be indicated on the chart by numbers. Resumes shall be provided for qualified professional personnel in Section E of SF 330 in the numbers indicated in parenthesis (19 total resumes) and in the following key disciplines, that are required to be licensed, registered, and/or certified: architect (2), structural engineer (2), civil engineer (2), mechanical engineer (2), electrical engineer (2), fire protection engineer (1), geotechnical engineer (1), land surveyor (1), and certified industrial hygienist (1). Resumes shall be provided for other key personnel as follows: project manager (2), interior designer (1), cost estimator (1), and landscape architect (1). Registration/certification for all is encouraged. The fire protection engineer must be either: an engineer having a BS or MS degree in fire protection engineering, from an accredited university engineering program, plus a minimum of 5 years work experience in fire protection engineering; or, a registered PE who has passed the NCEE fire protection engineering written exam; or a registered PE in a related engineering discipline with a minimum of 5 years experience dedicated to fire protection engineering. Other personnel should be shown on the organizational chart by discipline in the total number available for utilization on task orders assigned under this contract. Show lines of responsibility and communication between project team leaders and team members. The evaluation of all key personnel will consider education, training, registration, overall and relevant experience, and longevity with the firm. **** FACTOR 3 - PAST PERFORMANCE. Past performance on DoD and other contracts with respect to quality of work, compliance with design schedules and project cost estimating control. Indication of favorable performance ratings, awards, and repeat clientele in Section H of SF 330 is recommended. Past performance will be based on ACASS ratings and other data presented by the offeror or as determined by the Government. The evaluation of this factor will be based on the past performance information from the previous five years. **** FACTOR 4 - WORK MANAGEMENT. A proposed management plan shall be presented in Section H of SF 330. The plan will be judged on experience producing quality designs based on an evaluation of the firm's design quality management plan. The design quality management plan should include an organization chart in Section D of SF 330 and briefly address the management approach, team organization, quality control procedures, project cost estimating control and design schedule control, coordination of in-house disciplines and consultants, and prior relationships of the prime firm and any of their significant consultants on similar projects. The SF 330 shall clearly indicate the primary office where the work will be performed and the staffing at this office. Any work not done out of the primary office shall be addressed within this work management plan. Address the firm's capacity and necessary experience to perform two simultaneous $500,000 task orders in a 180-day period **** FACTOR 5 - KNOWLEDGE OF LOCALITY. Knowledge of locality as it pertains to design and construction methods of military projects in the geographic area where work (Savannah District area of responsibility) is anticipated to be accomplished. **** FACTOR 6 - VOLUME OF WORK. Volume of DOD contract awards in the last 12 months. **** TELEPHONIC INTERVIEW. Those firms achieving the selection list will be given a telephonic interview the results of which will be factored into the firms overall rating. The following questions will be provided for the short listed firms to provide a written and telephonic response: ** Discuss three important lessons learned from your example projects on your SF 330 Part I that would be applicable to this contract. ** Discuss your quality control procedures to ensure the proper coordination of disciplines and the development of the best design solution the first time. ** Describe your firm's approach for involving the facility users, Public Works, USACE, etc. in the design process. **** 4. SUBMISSION REQUIREMENTS. Interested firms having capabilities to perform this work must upload Parts I and II of the SF 330 to https://sasweb.sas.usace.army.mil/aeselection/ by 11:30 a.m., Eastern Standard Time on 30 Nov 2011. NO HARDCOPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED. Any submissions received after the exact time specified for receipt is considered late and will be processed in accordance with FAR 15.208 Submission, Modification, Revision, and Withdrawal of Proposals. The entire submission of the SF 330 must not exceed 5 Megabytes and shall be submitted as one file using Microsoft Word (.doc) or Adobe Acrobat (.pdf). Part I of the SF 330 should not exceed 25 pages, including 15 pages for Section H. Font size shall be 10 or larger. Resumes in Section E and example projects in Section F shall not exceed one page each. Indicate in Section C.11 if the prime has worked with the team members in the past five years. In Section G.26, include the firm each of the key personnel is associated. Registration in the Savannah District electronic A-E Selection System is required and instructions may be found at the website above. FIRMS SHOULD BE REGISTERED WELL IN ADVANCE OF THE CLOSING DATE FOR SUBMISSION OF THE SF 330 AS THE PROCESS MAY TAKE 3-5 DAYS. FIRMS MUST INCLUDE THE DUNS NUMBER FOR THE OFFICE OF THE FIRM PERFORMING THE WORK IN SECTION B.5 OF THE SF 330. Cover letters and extraneous materials (brochures, etc.) will not be considered. Questions concerning submissions should be directed to Sherry Turner at (912) 652-5703. Contracting Office Address: Attn: CESAS-CT PO Box 889 Savannah, Georgia 31402-0889 United States Primary Point of Contact: Rohan Bryan, Contract Specialist rohan.a.bryan@usace.army.mil Phone: 912- 652-5862 Fax: 912- 652-6061 Secondary Point of Contact: Terrence Johnson, Contracting Officer terrence.d.johnson@usace.army.mil Phone: 912.652.5072 Fax: 912.652.6061
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/W912HN-12-Z-RB01/listing.html)
- Place of Performance
- Address: Florida, South Carolina & Georgia., United States
- Record
- SN02624308-W 20111118/111116234312-7e6476c833c3a3e276ca4595dda3fccd (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |