SOLICITATION NOTICE
Y -- Design/construction standard design Transient Training Battalion Headquarters, one transient Non-Commissioned Officers and Officers Quarters, transient Barracks.
- Notice Date
- 11/16/2011
- Notice Type
- Presolicitation
- NAICS
- 236210
— Industrial Building Construction
- Contracting Office
- USACE District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
- ZIP Code
- 76102-0300
- Solicitation Number
- W9126G112-R-0002
- Response Due
- 12/1/2011
- Archive Date
- 1/30/2012
- Point of Contact
- ladell barnes, 817 886 1162
- E-Mail Address
-
USACE District, Fort Worth
(ladell.p.barnes@usace.army.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Document Type: Synopsis Notice Solicitation Number: W9126G-12-R-0002 Synopsis date: November 16, 2011 Solicitation Type: 100% Small Business Magnitude of project: Between $25 MIL and $100 MIL Estimated Issue of Request For Proposal is : December 1, 2011 with offers' proposals due January 4, 2012. NAICS Code: 236220 -- Commercial and Institutional Building Construction Contracting Office Address: U.S. Army Engineer District, Fort Worth, 819 Taylor Street, Room 2A19, Fort Worth, TX 76102-0300 FOR INFORMATION ONLY: The solicitation will be a continuation of the US Army Corps of Engineers (USACE) Centers of Standardization (COS) program wherein eight Districts are not only the design centers of expertise but are also the acquisition experts for the facility types for which the COS is assigned. Scope Of Work: The work will consists of the design and construction one (1) standard design Transient Training Battalion Headquarters, one (1) transient Non-Commissioned Officers and one (1) Officers Quarters, transient Barracks; with building information systems, fire protection and alarm systems, and energy monitoring and control systems (EMCS) connection. Sustainable design and development and Energy Policy Act of 2005 features shall be included. Supporting facilities include site infrastructure upgrade, utilities and connections, lighting, paving, parking, walks, storm drainage, landscaping, and signage. The site infrastructure work included in this project consists of constructing new primary infrastructure utility systems to support the new ORTC facilities utility requirements, construct new POV parking lots, fire & emergency access lanes, roads, sidewalks, and landscaping. The work includes the construction of new water distribution mains including a new 250,000 gallon elevated water tower, sewer mains, gas distribution mains, and electrical/communication ductbanks. There will be demolition and relocation of portions of the existing utility systems to clear the sites for the new facility, utility, & infrastructure construction. Heating will be provided by self contained system. Estimated air conditioning is 778 tons. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards shall be provided. Comprehensive building and furnishings related interior design services are required. General Instructions: The following evaluation criteria listed are of descending importance and shall be used in this solicitation unless modified by amendment prior to receipt of proposals: Tab B Factor 1 Specialized Experience 1st important (Most Important Factor more important than Factor 2), Tab B Factor 2 Past Performance 2nd important (Less important than Factor 1 more important than Factor 3), and Tab C Factor 3 Organization and Technical Approach 3rd important (Less important than Factor 2). The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule in executing task orders to meet the Army's Transformation program goals of faster project execution at lower cost, while taking advantage of industry standards, means and methods. In Phase 1 of the 2 phase design-build selection procedure, interested firms or joint venture entities (referred to as "offerors") submit certain specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will short-list no more than five (5) of the Phase 1 offerors to compete for the design-build contract in Phase 2. The Contract Specialists for this solicitation Mr. LaDell Barnes. Phone (817) 886-1162 and email (preferred method for contact) ladell.p.barnes@usace.army.mil
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G112-R-0002/listing.html)
- Place of Performance
- Address: Fort Hood Fort Hood Killeen TX
- Zip Code: 76544
- Zip Code: 76544
- Record
- SN02624390-W 20111118/111116234404-6b6594c7c0afeaf59d5431bf6972b255 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |