Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 24, 2011 FBO #3652
MODIFICATION

54 -- Prefabricated Shower Facility

Notice Date
11/22/2011
 
Notice Type
Modification/Amendment
 
Contracting Office
MWR - MWRO - NEKOTA MABO - Mt Rushmore NM 24290 Doane Mountain Road Keystone SD 57751
 
ZIP Code
57751
 
Solicitation Number
P12PS20385
 
Response Due
12/16/2011
 
Archive Date
11/21/2012
 
Point of Contact
Brian Peck Contract Specialist 6055743132 Brian_L_Peck@nps.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
The purpose of this modification is to update the description of the requirement. Paragraph 2 is changed to read: 2. DESCRIPTION: Prefabricated concrete coin operated shower building, solid reinforced monolithic concrete panels with a minimum of 4" walls, 4" roof, and 8" floor, welded connections and preinstalled plumbing and electrical. The interior ceilings will be vaulted, with an 8' eve wall that shall be pre-engineered to meet the following: 150 MPH wind load, seismic category D, and 2-hour fire rating per UBC. The facility will be virtually waterproof with internal seals, maintenance free, relocate-able, and vandal resistant. Approximate overall size: 22' WOD x 26' LOD x 8' HID. Men's shower room shall include three standard shower stalls and one ADA access able shower stall. Women's shower room shall include three standard shower stalls and one ADA access able shower stall. Each of the eight shower stalls shall include dressing area and benches. The unit shall include a chase/storage area with rear access. Exterior Finishes: -Walls - Texture painted stucco finish; custom color: Badlands Tan-Roof - Concrete gable roof with 2/12 pitch and 24 gauge secondary metal roof system; custom color: Badlands Tan-chase access from rear of building Interior Finishes:-Walls - Smooth, epoxy coated concrete; white-Floor - Smooth, slip-resistant epoxy coated concrete; gray-Ceiling - Texture painted concrete; white Signage:-Recessed, molded plastic signs indicating Men, Women, and ADA as required Doors and Accessories:-Three (3) galvanized and painted steel doors;18 gauge; size: 3' x 7'; cast in 16 gauge galvanized and painted steel door frame-Non-corrosive stainless steel ball bearing hinges-ADA lever mortise lockset with deadbolt and interchangeable core-ADA aluminum threshold and door sweep-Weather stripping-Door stop-Adjustable door sweep-Aluminum drip edge-Door louvers-chase access to be at rear of building- Sinks with vanity top and mirrors; 2 sinks in men's shower room and 2 sinks in women's shower room- Electric forced air heat- Adequate lighting- Two GFCI outlets in men's shower room and two GFCI outlets in women's shower room Utility Connections:-onsite utilities to be provided by NPS-connections shall be consolidated to 1 sewer connection, 1 water system connection, 1 electrical connection Coin Operation:Government furnished property: The government will furnish eight (8) coin boxes. The contractor shall install the coin boxes into the prefabricated facility so that they are fully functional when connected to utilities. The government will ship the coin boxes to the contractor upon award. Coin box specifications: Coin box, rear access, flush mount, manufactured by Fluid Manufacturing, Lodi, CA. Details can be found at http://www.fluidmfg.com/flushmount.html. Building HVAC:-Heating system to be included with building to allow operation of shower year round.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P12PS20385/listing.html)
 
Place of Performance
Address: Badlands National Park, 25216 Ben Reifel Road, Interior, SD, 57750
Zip Code: 57750
 
Record
SN02627349-W 20111124/111122234401-1e0c77bc58ee708d7de1e5e3edfc14ad (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.