Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 24, 2011 FBO #3652
SOURCES SOUGHT

38 -- East Fork Weiser Bridge - Map to location

Notice Date
11/22/2011
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-4 SW Idaho/Nevada Acquisition Center, 1249 S. Vinnell Way, SUITE 200, Boise,, Idaho, 83709, United States
 
ZIP Code
83709
 
Solicitation Number
AG-0261-S-12-0007
 
Archive Date
12/31/2011
 
Point of Contact
Chad A.T. Bullock, Phone: 208-373-4128, Matthew A. Morris, Phone: 2083734166
 
E-Mail Address
cbullock@fs.fed.us, mamorris@fs.fed.us
(cbullock@fs.fed.us, mamorris@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Map to lacation EAST FORK WEISER BRIDGE SCOPE OF CONTRACT This contract shall consist of the following work: 1) Remove and dispose of treated timber from old bridge. 2) Install new cast-in-place abutments and cast- in- place wingwalls. 3) Install new precast/prestressed concrete bridge superstructure. The design length is 66 feet. 4) Salvage Riprap from bridge excavation, and if more riprap is needed, obtain by excavating the rock outcrop along road 0.3 miles past the bridge site, or obtain from a commercial source. 5) Set and maintain survey control staking by referencing Government supplied control points. 6) Construct roadway approaches. 7) Install metal beam bridge rail and approach railing. 8) Construct 3" bituminous wear surface on bridge and approaches. CONTRACT TIME The contract will be advertised and awarded in the winter of 2012, and the bridge construction shall occur in the summer of 2012.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/261/AG-0261-S-12-0007/listing.html)
 
Place of Performance
Address: PROJECT LOCATION, The East Fork Weiser Road 50172 meets the State Highway 95 between Council and New Meadows. The 50172 road is 9 miles north of Council. The bridge site is 0.7 miles up the East Fork Weiser Road 50172. The intersection of road 50172 and State Highway 95 has a barricade with a ROAD CLOSED sign posted on the barricade. The riprap borrow source is 0.3 miles beyond the bridge site., Idaho, United States
 
Record
SN02627760-W 20111124/111122234934-8cf1e4c2f40d9d0511827368ce9c1a66 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.