Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 23, 2011 FBO #3681
MODIFICATION

28 -- Synchronizing Ring

Notice Date
12/21/2011
 
Notice Type
Modification/Amendment
 
NAICS
336412 — Aircraft Engine and Engine Parts Manufacturing
 
Contracting Office
DEPARTMENT OF THE AIR FORCE; BLDG 3001 SUITE 2AH82A; TINKER AFB;OK; 73145
 
ZIP Code
73145
 
Solicitation Number
FA8121-12-R-0010
 
Response Due
11/2/2011
 
Archive Date
1/31/2012
 
Point of Contact
Jon Wright, Phone: 4057364477, Terra Washington, Phone: 4057341143
 
E-Mail Address
jon.wright@tinker.af.mil, terra.washington@tinker.af.mil
(jon.wright@tinker.af.mil, terra.washington@tinker.af.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Air Force Global Logistics Support Center (AF-GLSC) iscontemplating to procure spares of the Line Items cited below for a FFPContract, for the procurement of a quantity of 233 each SynchronizingRing to support the F100 Engine. This requirement is determined to be100% Small Business Set-Aside. 1. Estimated issue date and estimated closing/response date issued 2 Nov2011,Closes 2 December 20112. PR# - FD2030-12-702643. Service/Spare/Repair/OH - Spares 4. AMC - 1/C 5. Item: Synchronizing Ring 6. NSN - 2840-01-454-8470 NZ7. PN - 4082995-18. Description: O.D. diameter approximately 45 inches. I>D> diameterapproximately.43 inches. Height: approximately 2 inches. Width:approximately 1.5 inches. Augmentor synch ring controls movement ofconvergent nozzle segments by a series of interconnectedlinks.Material: Titanium Alloy.9. Total Line Item Quantity: L/I 0001 - Informational CLIN only L/I 0001AA - First Article Required - Contractor Testing - Test Plan;qty 1 lot; required delivery 30 calendar days ARO ContractL/I 0001AB - First Article Required - Contractor Testing - Test Report;qty 1 lot; required delivery 120 calendar days ARO ContractL/I 0001AC - First Article Required - Destructive Exhibit; qty 1 each; L/I 0001AD - First Article Required - Non-Destructive Exhibit; qty 2each; L/I 0001AE - First article Required - Production Units; qty 233 each;required delivery 16 each/per month on or before 15 May 2012L/I 0001AF- First Article Not Required - qty 233 each; required delivery16 each/per month on or before 15 May 2012 10. Application (Engine or Aircraft) - F-100 Engine 11. Destination: L/I 0001AA, 0001AB, 0001AC, FA8111; Department of theAir Force; 558 CBSS CBHBC; 3001 STAFF DRIVE STE 1AB85A; ATTN: FIRSTARTICLE MONITOR; TINKER AFB OK 73145-3041L/I 0001AD and 0001AE SW3211; DLA Distribution Depot of Oklahoma; 3001 FAVE CEN REC; Bldg 506 DR 22; Tinker AFB, OK 73145-800012. Delivery: L/I 0001 - FOB ORIGIN; Required Delivery: 16 each/permonth starting on or before 15 May 2012. L/I 0001AA: FOBDESTINATION ; Required Delivery TBD13. Qualification Requirements: Applies14. Export Control: n/a 15. UID: Note to Contractor: If unit price exceeds $5,000 then UIDrequirements will apply. 16. Buyer name, phone#, and email address: Jon Wright, 405-739-4298,jon.wright@tinker.af.mil
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8121-12-R-0010/listing.html)
 
Record
SN02643445-W 20111223/111221234527-1e2ec1fe91e38352bce3e63ad452359c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.