SOLICITATION NOTICE
13 -- INITIATOR,CARTRIDGE ACTUATED
- Notice Date
- 2/9/2012
- Notice Type
- Presolicitation
- NAICS
- 325920
— Explosives Manufacturing
- Contracting Office
- DEPARTMENT OF THE AIR FORCE; OO ALC GHGK MUNITIONS;6033 ELM LNBLDG 1247; HILL AIR FORCE BASE; UT; 84056
- ZIP Code
- 84056
- Solicitation Number
- FA8213-12-R-3024
- Response Due
- 3/26/2012
- Point of Contact
- Von Vaughan, Phone 801-586-1832, Fax 801-777-5840, Emailvon.vaughan@hill.af.mil
- E-Mail Address
-
Von Vaughan
(von.vaughan@hill.af.mil)
- Small Business Set-Aside
- N/A
- Description
- PR Number(s): FD20201277007Item: 0001NSN: 1377012038651ES INITIATOR,CARTRIDGE ACTUATEDP/N: 821020-1, P/N: 6104100, Description: INITIATOR,CARTRIDGE ACTUATED|F-15ACFT|EXWT|1377-MC60|UN0276|EX1988080383|0.0006 STORAGE POUNDS AND 0.0006TRANSPORTATION POUNDS|1.4|1.4 DEPARTMENT OF DEFENSE HAZARD CLASSDIVISION|CARTRIDGES, POWER DEVICE|1.4CSupp. Description: DODIC MC60: 0.0000 Destn: FMS COUNTRIES. Item: 0001AATEST PLAN IAW DD 1423-1EXHIBIT B Description: Quantity: 1.0000 LO Destn: FMS COUNTRIES. PR Number(s): FD20201277007Item: 0001AB Description: Supp. Description: DODIC: MC60Quantity: 6.0000 EA Destn: FMS COUNTRIES. Item: 0001ACTEST REPORT Description: Quantity: 1.0000 LO Destn: FA8213,HILL AIR FORCE BASE,UT,84056-5825. Delivery: *ARO IAW DD FORM 1423-1,.00 PR Number(s): FD20201277007Item: 0001ADNSN: SAME Same as basic item above Description: Quantity: 20.0000 EA Destn: FMS COUNTRIES. Plus 0006 additional items Duration of Contract Period: Delivery requested by 29 March 2013 Electronic procedure will be used for this solicitation. To: PACIFIC SCIENTIFIC ENERGETIC MATERI, HOLLISTER, CA.,95023-9635. To:CHEMRING ENERGETIC DEVICES, INC., DOWNERS GROVE, IL.,60515-4060. It issuggested that small business firms or others interested insubcontracting opportunities in connection with the describedprocurement make contact with the firm(s) listed.First article test required.Award will be made only if the offeror, the product/service, or themanufacturer meets qualification requirements at the time of award inaccordance with FAR clause 52.209-1. The solicitation identifies theoffice where additional information can be obtained concerningqualification requirements are cited in each individual solicitation.To include all required reports and data.This part required engineering source approval by the design controlactivity in order to maintain the quality of the part. Existing uniquedesign capability, engineering skills, and manufacturing knowledge bythe qualified source(s) require acquisition of the part from theapproved source(s). The approved source(s) retain data rights,manufacturing knowledge, or technical data that are not economicallyavailable to the Government, and the data or knowledge is essential tomaintaining the quality of the part. An alternate source must qualifyin accordance with the design control activity's procedures, as approvedby the cognizant Government engineering activity. The qualificationprocedures must be approved by the Government engineering activityhaving jurisdiction over the part in the intended application.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OOALC/FA8213-12-R-3024/listing.html)
- Record
- SN02671247-W 20120211/120210114129-8d2d7e4e955ae8b25c07ae1f44f2e53d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |