Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 21, 2012 FBO #3801
SOLICITATION NOTICE

Y -- AZ PFH 3-1(2), Clints Well

Notice Date
4/19/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-12-B-00005
 
Point of Contact
Jeremiah Rogers, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
AZ PFH 3-1(2), Flagstaff - Clint Wells The project site locations consist of conducting 3R Pavement Improvements, guardrail and signing. •§ Schedule A - 9.51 miles of roadway paving and pullouts. Total of 40,206 tons of Superpave pavement. Approximately 187,952 square yards of Pulverization (8 inch depth). Approximately 78 tons of fog seal. This schedule also includes permanent signing and striping as well as approximately 1,713 linear feet of Guardrail Sytem G4. •§ Option W - 4.5 miles of roadway paving and pullouts. Total of 19,408 tons of Superpave pavement. Approximately 90,695 square yards of Pulverization (8 inch depth). Approximately 38 tons of fog seal. This Option also includes permanent signing and striping as well as approximately 3,238 linear feet of Guardrail System G4. •§ Option X - 3.1 miles of roadway paving and pullouts. Total of 13,775 tons of Superpave pavement. Approximately 64,341 square yards of Pulverization (8 inch depth). Approximately 27 tons of fog seal. This Option also includes permanent signing and striping as well as approximately 2,438 linear feet of Guardrail System G4. Weather limitations for surface treatments - April 15, 2012 to October, 2012. Significant quantities include 40,206 tons of paving for the section of Schedule A beginning at the north end of this route at MP 307.5 and ending at MP 298.0. Estimated cost for the base schedule and two options option is $6 to $14 million. It is anticipated that this project will be advertised in early May, 2012 with construction beginning in late June, 2012 and extending through October, 2012.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00005/listing.html)
 
Place of Performance
Address: Lake Mary Road in Coconino County, Flagstaff, Arizona, 86001, United States
Zip Code: 86001
 
Record
SN02726788-W 20120421/120420000550-05997285c5acc42e046d46fe35175afc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.