SOLICITATION NOTICE
55 -- Various Automatic Doors SAVAHCS
- Notice Date
- 4/30/2012
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238290
— Other Building Equipment Contractors
- Contracting Office
- Department of Veterans Affairs;Contracting Section;3601 S. 6th Avenue;Tucson AZ 85723
- ZIP Code
- 85723
- Solicitation Number
- VA25812Q0369
- Response Due
- 5/14/2012
- Archive Date
- 6/13/2012
- Point of Contact
- Daniel C Thiel
- E-Mail Address
-
629-4833<br
- Small Business Set-Aside
- N/A
- Description
- PROJECT: Canteen retail store, Bi-Parting Automatic Door Package STATEMENT OF WORK: SAVAHCS has a onetime requirement to remove the existing double swing glass door package at the Canteen retail store on building 80.Contractor shall furnished and installed bi-parting automatic door systems. The finish shall be in dark bronze. Included is the clear 1" glass and glazing. All automatic doors furnished that will be installed with AAADM (American Association of Automatic Door Manufactures) Instructions and guidelines. Upon completion of the install Contractor will conduct the first AAADM inspection: Please refer to owner's manual given at the time of installation for additional information. "1 each automatic bi-parting door (O-SX-SX-O). "Door Activation- two way traffic Stanley motion sensor controls. "Door Safety- threshold safety sensor w/ doorway holding beams. "Microprocessor control box w/ safety search circuitry. "Electro-mechanical operator, 1/8 HP DC motor (requires 120VAC, 5 amps min. by others) "Narrow stile door panels w/ 4" bottom rails. "Emergency breakaway sliding door panels with fixed sidelites. "Door panels and sidelites prepped with 1" glass stops. "Adams-Rite Security deadlock w/ Best cylinder on the exterior and thumb-turn interior. "Two position switches added to choose bidirectional use or unidirectional use. "Contractor shall submit to CO/COR the proposed door set to be installed for approval. PROJECT: Mental Health Automatic Door Package STATEMENT OF WORK: SAVAHCS has a onetime requirement to remove and replace the two swing glass door package at the east end of the patient break room in building 67. Contractor shall furnish and installed two swing glass automatic door systems. The finish shall be in dark bronze. Included is the clear 1" glass and glazing. All automatic doors furnished that will be installed with AAADM (American Association of Automatic Door Manufactures) Instructions and guidelines. Upon completion of the install Contractor will conduct the first AAADM inspection: Please refer to owner's manual given at the time of installation for additional information. 1.Contractor will remove the existing (2) storefront door systems located at the Behavioral unit. Contractor will salvage the wireless receiver from the existing operator system for use with the new operator. 2.Contractor will furnish and install (2) new storefront entrance systems at these openings. Contractor will caulk these units as necessary for environmental seal and aesthetics. Contractor will glaze these entrances (door and transom) with ¼" clear laminated safety glass. 3.Contractor will furnish and install concealed low energy heavy duty automatic swing door operators on both of these new storefront door systems. This includes the concealed drive mechanisms which contain no "hang" points. Contractor will re-install the wireless receivers salvaged from the old operators and terminate as necessary for wireless activation of the operators via the existing push buttons. Contractor will utilize an AAADM certified technician for this installation and the operators will be configured to operate within the safety standards set forth in ANSI 156.19. Contractor will furnish and install the proper automatic door signage. 4.Contractor will ensure the area and new openings are clean and ready for service. Contractor will test these openings with a facilities representative to ensure they operate as intended and required. Statement of Work. SAVAHCS has a onetime requirement to remove the existing sliding glass doors and replace with a new set of sliding doors on the north entrance to building 30. The successful contractor shall provide all the supervisor, labor, equipment and materials necessary to remove the existing sliding glass doors and install a new set of 3-panel, Single telescopic sliding doors. This will include a transom with a clear opening of approximately 55". It will have 2 holding beams and will meet ANSI regulations and standards.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/TuVAMC/VASAHCS/VA25812Q0369/listing.html)
- Record
- SN02735129-W 20120502/120501000034-e1d3c54708a43fffcfaddd3f73de3126 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |