Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 18, 2012 FBO #3828
MODIFICATION

17 -- ADAPTER,GROUND HAND

Notice Date
5/16/2012
 
Notice Type
Modification/Amendment
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
WR ALC GRVKAA; 460 RICHARD RAY BLVD STE 200;BLDG 301 CP 478 2221903; ROBINS AFB; GA; 31098
 
ZIP Code
31098
 
Solicitation Number
FA8518-12-R-31209
 
Response Due
4/26/2012
 
Archive Date
8/16/2012
 
Point of Contact
Sharon L. Gray, Phone: 478-222-1861
 
E-Mail Address
sharon.gray@robins.af.mil
(sharon.gray@robins.af.mil)
 
Small Business Set-Aside
HUBZone
 
Description
This requirement is for a Ground Hand Adapter (NSN: 1730-00-943-8306RN;Part Number: 65E35468; Size: 30' L, 22' W, 15' H, 600 Lbs.; Material:Steel; Item Function: Nuclear Certified Fork Adapter for the MHU-83Lift Truck to handle munitions and weapons) 1 EACH FIRST ARTICLE(CONTRACTOR TESTING WITH DATA REQUIRED (Test Plan/Procedure andTest/Inspection Report). Also included are four (4) Option Periods:Option 1 is valid for 365 days, 1-35 Each; Option II is valid 730 days,1-20 Each; Option III is valid 1095 days, 1-20 each; Option IV is valid1460 days, 1-20 each. DELIVERY - ITEM 0001: Place of delivery forFirst Article: FE2805, one (1) Ea. First Article is due 30 calendardays ARO Approval of First Article Test/Inspection Report, Test planprocedure is due 30 days ARO Contract, Test Inspection Report is due 180days ARO Contract. Delivery of options is 180 calendar days afterexercise of option. The location is to be determined. The drawingpackage will be made available online, once the Request for Proposal(RFP) is posted. The approximate RFP issue date is 11 May 2012.Proposals will be due 11 June 2012Offerors shall prepare their proposalsin accordance with mandatory, explicit and detailed instructionscontained in the RFP. This is a total Hubzone Set-Aside. All responsible sources may submit abid, proposal, or quotation which shall be considered by the agency.All questions regarding the RFP should be submitted in writing toSharon.Gray@robins.af.mil with a copy to dawn.mccurdy@robins.af.milQUESTIONS VIA E-MAIL ARE PREFERRED.Anticipated award date is 11 July 2012.IAW Far 5.207(c)(14)(iii) - Buy American Act -- Construction MaterialsUnder Trade Agreements, one or more of the items under this acquisitionis subject to the World Trade Organization Government ProcurementAgreement and Free Trade Agreements.Electronic procedures will be used for this solicitation atwww.fedbizopps.gov ONLY.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/WRALC/FA8518-12-R-31209/listing.html)
 
Record
SN02750430-W 20120518/120517001054-a5c3084801c162c74b3a58aca9af4697 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.