Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 26, 2012 FBO #3836
MODIFICATION

23 -- Amendment to Solicitation # W91ZLK-12-T-0217 to Provide Responses to Vendor Questions

Notice Date
5/24/2012
 
Notice Type
Modification/Amendment
 
NAICS
336214 — Travel Trailer and Camper Manufacturing
 
Contracting Office
ACC-APG - Installation Division, Directorate of Contracting, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013
 
ZIP Code
21005-3013
 
Solicitation Number
W91ZLK12T0217
 
Response Due
6/18/2012
 
Archive Date
8/17/2012
 
Point of Contact
Kirstin B Hazlewood, 410-278-5488
 
E-Mail Address
ACC-APG - Installation Division
(kirstin.b.hazlewood.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment to Solicitation W91ZLK-12-T-0217 Mobile Decontamination Trailer The purpose of this amendment is to provide responses to questions submitted by several interested vendors. Below, each question is followed by the clarification given by the end user of the trailer. Q: Is the intended use as a work shower (daily use) unit, or an incident response (spill or exposure event) unit? A: Incident response (spill or exposure event) Q: Will the trailer be required to be mobile while laden (tanks full), or simply be moved from site to site "dry" and then prepared for operations in a semi-stationary location? A: Mobile while laden (tanks full) Q: What are the shower requirements (number of stalls, fixture requirements, curtains, gender separation, etc.)? A: At least 2 shower stalls with curtains and basic shower fixtures; no gender specific separation necessary Q: What are the requirements of the on-board air conditioning system? A: High efficiency, ceiling mounted A/C unit with lockable thermostat cover Q: Is there a requirement for heating the water in the Aluminum Fresh Water Tank (on-board diesel or LP water heaters)? A: The water from the fresh water tank, at a minimum needs to be able to go through the hot water system, when the sinks and shower are used then that water needs to be able to be heated. Propane, diesel or LP water heaters are all acceptable. Q: Are there requirements for filtration of the fresh water? A: We prefer the filtered discharge system that uses the Micron cartridge filters. This allows the waste to drain into the waste tank and the waste pump sends the waste water through the filtered discharge system. Q: Is the requirement "wire for baseboard heat (to include interior electric baseboard heaters, heat strips line)" stating that pre-wire for future installation of heater units should be completed, or that electric baseboard heaters should be included in the proposal? A: Electric baseboard heaters should be included. Q: What are the associated requirements (referencing the above question)? A: Standard wiring for baseboard heaters and the cold weather package, which adds the actual baseboard heaters. Q: What does the "Cold Weather Package" requirement consist of? A: The cold weather package includes interior electric baseboard heaters and heat strip, which are applied to the fresh waste tanks. The exterior of the tanks are foam insulated. Q: What are the requirements for the following rooms? Any seating, storage/shelving, clothing or material refuse, gender separation, etc.? A: Listed below Equipment Room: Mixing valve On-Demand Propane Heating Filtered Discharge System Chrome Floor Drain Shower Room: At least 2 shower w/ curtains and/or Doors Chrome Floor Drains Waterproof Progress Lighting Dirty Room: Chrome Floor Drain Floor mounted Bench Lockable Vanity with stainless steel sink and Faucet Clothes Hooks Filter System Fluorescent Lighting Safety Glass Mirror Skylight Clean Room: Chrome Floor Drain Wall Lockers Clothes Hooks Fluorescent Lighting Safety Glass Mirror Floor Mounted Bench Skylight Q: No specification for filtration. Does this need to be set up for 2 Stage Asbestos (50/5 microns), 2 Stage Lead/Heavy Mineral Filtration or both? A: No specification for either of those filtration systems, however, the trailer must include, at a minimum, a filtration system that drains the waste/water into a waste tank and then through some sort of filtrations system process. The DECON waste/water will then be disposed of based on state/local guidelines. Q: Is the generator to be mounted on the tongue of the trailer or to be located within the Equipment room? A: The generator needs to be on the tongue of the trailer. Q: What is the total numbers of showers to be included in the shower room? A: 2 total showers. The terms and conditions set forth in this original combined synopsis/solicitation remain unchanged. Quotations must be signed, dated, and received by 2 p.m. Eastern Standard Time, Monday June 18, 2012, via email, to Kirstin.b.hazlewood.civ@mail.mil (preferred method), or via U.S. Mail at US Army Contracting Command- Aberdeen Proving Grounds, Installation Contracting Division, Attention Kirstin B. Hazlewood, 4118 Susquehanna Avenue, Aberdeen Proving Grounds, MD, 21005-3013. All quotations from responsible sources will be fully considered. Vendors who are not registered in the Central Contractor Registration (CCR) or the Online Representations and Certifications Application (ORCA), https://orca.bpn.gov, prior to award will NOT be considered. Vendors may register with CCR by calling 1-800-334-3414 or online at www.bpn.gov/CCR For questions concerning this Request for Quotation, contact Kirstin B. Hazlewood, Contracting Specialist, via email at Kirstin.b.hazlewood.civ@mail.mil. NO TELEPHONE REQUESTS OR QUESTIONS WILL BE HONORED.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/4d9d6654403c45168eb75926fafba74e)
 
Place of Performance
Address: ACC-APG - Installation Division Directorate of Contracting, 4118 Susquehanna Avenue Aberdeen Proving Ground MD
Zip Code: 21005-3013
 
Record
SN02757612-W 20120526/120524235858-4d9d6654403c45168eb75926fafba74e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.