SOLICITATION NOTICE

Y -- NV PRA LAME 112-1(1), ECHO BAY ACCESS ROAD

Notice Date
7/9/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-12-B-00008
 
Archive Date
9/6/2012
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Jeremiah B. Rogers, Phone: 7209633090
 
E-Mail Address
aaron.sanford@dot.gov, jeremiah.rogers@dot.gov
(aaron.sanford@dot.gov, jeremiah.rogers@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
This project will be advertised on a full and open (unrestricted) basis. This is not an invitation for bid. Bid documents will NOT be available until project advertisement, tentatively scheduled for July 24, 2012. PROJECT NUMBER: NV PRA LAME 112-1(1) PROJECT NAME: Echo Bay Access Road PROJECT DESCRIPTION: The project consists or 4Rwork on Echo Bay Access Road (rehabilitating, restoration and rehabilitation and reconstruction). The reconstruction portion of this consists of some realignment of the curves on the roadway to improve the grade of the overall roadway This route is the last portion of improvement along the Northshore Road at Lake Mead and this section accesses the Echo Bay Marina area in the park. This work consists of improving the roadway pavement section with pulverized pavement, aggregate base coat, tack coat, hot asphalt concrete pavement and open graded friction course on the roadway section. The project also consists of shoulder reconditioning, guardrail, concrete curb, sidewalk and curb ramp, culvert pipe, signing and striping. The pavement area of the work starts at the north end of this route at the junction with Northshore Road and extends southeasterly to the Echo Bay Marina and parking area. SIGNIFICANT QUANTITIES: o Schedule A - 6.789 km of roadway paving and pullouts. Total of 10,391 cubic meters of Roadway Excavation. Approximately 23,005 metric tons of Aggregate Base. Approximately 8.67 km of Shoulder Reconditioning. Approximately 10,079 metric tons of Hot Asphalt Concrete Pavement. Approximately 2,063 meters of concrete curb. Approximately 2,023 tons of Open graded Asphalt Friction Course. ENGINEER'S ESTIMATE: Estimated Construction Cost Range for Schedule A $4-7 million. CONSTRUCTION DURATION: Tentative construction duration is from September 1, 2012 to March 31, 2013
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00008/listing.html)
 
Place of Performance
Address: Lake Mead National Recreation Area, Las Vegas, Nevada, 89005, United States
Zip Code: 89005
 
Record
SN02796616-W 20120711/120709234345-87b7d2a26b3126cc0bed3a173ac9dab3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.