Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 20, 2012 FBO #3891
MODIFICATION

23 -- 49' Target Vehicle Trailers

Notice Date
7/18/2012
 
Notice Type
Modification/Amendment
 
NAICS
336212 — Truck Trailer Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, AAC - Air Armament Center, AAC/PK, 205 West D Avenue, Suite 433, Eglin AFB, Florida, 32542-6864, United States
 
ZIP Code
32542-6864
 
Solicitation Number
FA9200-12-M-0328
 
Archive Date
8/4/2012
 
Point of Contact
Michael L. Pahel, Phone: (850) 883-3672, Carnell W. James, Phone: (850) 882-4228
 
E-Mail Address
michael.pahel@eglin.af.mil, carnell.james@eglin.af.mil
(michael.pahel@eglin.af.mil, carnell.james@eglin.af.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
CLIN 0001 has an additional requirement to paint the trailers to match the specifications in the Paint Specifications attachment. An additional attachment has also been added to show a series of pictures of a completed trailer. The attached Q&A answers are amended below as of 17 Jul 2012 / 1500 hrs: Q18) The pictures show a small angle bulk head at the head of the grating pads. Is this needed? A18) Yes, per the attached photos. Q12) Please confirm the trailer must be shipped with two tires mounted to the 8-lug wheel hub plus two spare tires mounted on wheels shipped loose with each trailer. A12) The wheel/tire assemblies do not need to be mounted on the trailer. It is permissible to ship the four (4) tires mounted on wheels loose with each trailer. The attached Q&A answers are amended below as of 18 July 2012 / 1000 hrs: Q&A 4) The Government is changing the max load requirement for the axel and tires from 8,000 pounds to 7,000 pounds in order to eliminate the need to use a non-standard rated axel. The following is a new question: Q21) In the latest pictures of the trailers (stacked on the flatbed), those trailers have what appear to be a welded steel channel or tube on the sides for tie down attachment points instead of the D-rings shown on the first set of pictures. Would either type of tie down attachments would be acceptable? A21) Yes, either type of tie-down attachment would be acceptable. Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2012-07-17 14:25:28">Jul 17, 2012 2:25 pm Modified: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][modified_on]" value="2012-07-18 11:12:06">Jul 18, 2012 11:12 am Track Changes The deadline for submitting proposals has been extended until 20 July 2012. Please review the attached Q&A document that addresses questions and concerns from many different potential offerers. The comments received from potential offerers have been very valuable for clarifying this solicitation. Thank you to all that have submitted questions. However, since the deadline for submitting proposals is 20 July 12 at 1200, no further amendments or comments will be posted after Thursday, 19 July 2012 at 1000 hrs Central time.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/AAC/FA9200-12-M-0328/listing.html)
 
Place of Performance
Address: 205 West D Ave, Bld 350 Suite 433, Eglin AFB, Florida, 32542, United States
Zip Code: 32542
 
Record
SN02807658-W 20120720/120719000142-b31986ac123afaaafe7ae6ce3b05bb05 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.