Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 17, 2012 FBO #3919
MODIFICATION

Z -- TFO-SAGINAW HILL CAP REPAIR, EROSION

Notice Date
8/15/2012
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
BLM AZ-STATE OFC ADMN SVCS(AZ951)ONE N. CENTRAL AVE, SUITE 800PHOENIXAZ85004US
 
ZIP Code
00000
 
Solicitation Number
L12PS01119
 
Response Due
9/12/2012
 
Archive Date
10/12/2012
 
Point of Contact
Shawna R. Rogers
 
Small Business Set-Aside
Total Small Business
 
Description
Bureau of Land Management (BLM) - Arizona has a requirement to repair erosion damage to the repository cap at the Saginaw Hill Mine Site. A mine waste repository was completed at the Saginaw Hill Site in August 2009. The mine wastes held in the repository contain hazardous metals including lead and arsenic. The repository includes a two acre earthen cap. The cap shows poor vegetation growth as a result of erosion with rills forming in the cover material. Rills up to two feet deep have developed in the cover material. The cap is a multilayer earthen cap comprised of a compacted clay layer with a geotextile layer overlain with more clay and includes a cover system comprised of fill material and topsoil. A layer of orange construction site fencing was placed on the surface of the upper clay layer to act as an erosion indicator. The erosion rills have cut the topsoil and fill layers but have not reached the upper clay layer. The toe of the repository cap is protected by riprap. Approximately 150 yards of cover material has eroded and approximately 50 yards of riprap has eroded. This Work will repair the erosion damage by filling the voids caused by erosion with topsoil, surface preparation for and seeding the entire two (2) acres and replacing the riprap along the toe of the repository cap. Incidental work includes repairing cuts in the 4- strand, barbed-wire fence that the Contractor must make in order to access the cap. The Saginaw Hill Site is located on the north side of W Valencia Road opposite the Casino Del Sol casino in Tucson, AZ.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/AZ/L12PS01119/listing.html)
 
Record
SN02840448-W 20120817/120816000107-794f2f35efd95bb679838b4774447bf2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.